Wind Turbine Tower Adapter Layout for Easier Nacelle Installation

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

The construction of wind turbines, especially offshore ones, is complex and time-consuming due to the elaborate process of installing the nacelle on top of the tower, which requires lifting the attachment point high above its final position, increasing the risk of damage and complicating the use of lifting cranes.

Innovation Solution

The integration of electrical devices for power conditioning and switching within a tower adapter that can be pre-installed and tested onshore, allowing the nacelle to be attached closer to its final position, reducing the need for on-site electrical installations and simplifying the installation process by housing these devices within the tower adapter or nacelle, and using a slip joint or flange connection for easy assembly.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of operation

If the nacelle is installed on top of the tower using conventional methods, then the tower and nacelle can be connected, but the attachment point must be lifted high above its final position, increasing the complexity of installation and the requirements of the lifting crane

Engineering Contradiction:
Improveease of nacelle installationVSAvoidcomplexity of installation process
Core Design Contradiction:
Ease of operationVSDevice complexity

Solution Approach 1:

The tower is divided into a lower tower portion and an upper tower portion, with the adapter element forming the uppermost segment. This segmentation allows the adapter element to be pre-assembled with the yaw ring and electrical devices onshore, reducing on-site installation complexity and eliminating the need to lift the attachment point high above its final position.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The adapter element, yaw ring, and electrical devices are pre-assembled and pre-tested onshore before being transported to the offshore site. This preliminary action reduces the complexity of on-site installation and eliminates the need for complex lifting operations, as the pre-assembled unit can be installed directly in its final position.

Inventive Principle:
Principle #10Preliminary action

2Productivity

If electrical devices are installed on-site in the tower or transition piece, then the wind turbine can be constructed, but the process becomes time-consuming and complex

Engineering Contradiction:
Improveconstruction speedVSAvoidtime for electrical device installation
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

Electrical devices are pre-installed and pre-tested in the adapter element onshore before offshore transport. This eliminates time-consuming on-site electrical installations and allows the adapter element to be ready for immediate installation, significantly reducing the overall construction time.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The adapter element integrates multiple functions including mechanical connection, yaw ring assembly, and housing for electrical devices. This merging of functions into a single pre-assembled unit reduces the number of separate installation steps and accelerates the construction process.

Inventive Principle:
Principle #5Merging (Combining)

3Reliability

If the attachment point is lifted high above its final position, then the nacelle can be attached to the tower, but the risk of damage increases in case of crane malfunction

Engineering Contradiction:
Improvesafety during installationVSAvoidrisk of damage during lifting
Core Design Contradiction:
ReliabilityVSObject-affected harmful factors

Solution Approach 1:

The adapter element is pre-assembled with the yaw ring and electrical devices onshore in a controlled environment. This eliminates the need to lift the attachment point high above its final position, thereby reducing the risk of damage in case of crane malfunction while maintaining installation reliability.

Inventive Principle:
Principle #10Preliminary action

4Ease of manufacture

If the tower adapter houses electrical devices, then on-site installation is simplified, but the tower adapter design becomes more complex

Engineering Contradiction:
Improveease of on-site installationVSAvoidtower adapter design complexity
Core Design Contradiction:
Ease of manufactureVSDevice complexity

Solution Approach 1:

The adapter element is designed as a pre-assembled unit with integrated electrical devices that can be manufactured and tested onshore. This preliminary fabrication simplifies on-site installation while managing design complexity through standardized modular components.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The adapter element serves multiple functions: mechanical connection between tower sections, housing for electrical devices, and integration with the yaw ring. This multi-functionality consolidates several components into one, simplifying on-site installation while the modular design manages the inherent complexity.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Data Source

PatentUS11965488B2Wind turbine and method for constructing a wind turbine
Publication Date: 2024.04.23 SIEMENS GAMESA RENEWABLE ENERGY AS
  • US11965488B2 patent drawing
  • US11965488B2 patent drawing
  • US11965488B2 patent drawing

AI summary

Provided is a wind turbine including a tower, a tower adapter attached to the tower and a nacelle attached to the tower adapter, whereby the tower adapter houses at least one electrical device of the wind turbine for conditioning or switching power provided by a generator of the wind turbine.