Jib Boom Tower Crane Segmented Counter-Jib Spire

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing overhead slewing luffing jib tower cranes face challenges with heavy and complex counter-jib spire systems that complicate transport, assembly, and disassembly due to size and weight, requiring precise assembly and high manufacturing costs.

Innovation Solution

The counter-jib spire system is divided into three trusses with articulated connections, allowing for lighter components and reduced manufacturing costs, and a detachable roller block for the luffing cable mechanism facilitates easier transport and assembly by eliminating the need for manual rope reeving.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Strength

If the counter-jib spire system is designed as a single heavy component, then structural strength is improved, but transportability and assembly ease deteriorate

Engineering Contradiction:
Improvestructural strengthVSAvoidassembly ease
Core Design Contradiction:
StrengthVSEase of operation

Solution Approach 1:

The counter-jib spire system is divided into three separate trusses (counter-jib truss, spire truss, and revolving frame truss) that can be transported and assembled separately. This segmentation allows each component to be lighter and easier to handle during transport and assembly, while still forming a structurally sound complete system when connected.

Inventive Principle:
Principle #1Segmentation

2Ease of operation

If the counter-jib spire system is divided into separate trusses, then assembly ease is improved, but manufacturing precision requirements worsen

Engineering Contradiction:
Improveassembly easeVSAvoidassembly precision
Core Design Contradiction:
Ease of operationVSManufacturing precision

Solution Approach 1:

The connections between the trusses utilize articulated joints that allow for dynamic adjustment and tolerance compensation during assembly. This dynamic connection system enables the trusses to be assembled with reasonable tolerances without requiring extreme precision, as the articulated joints can accommodate minor deviations and self-align the components.

Inventive Principle:
Principle #15Dynamics

3Device complexity

If manual rope reeving is required for luffing cable installation, then device complexity is reduced, but assembly time and labor requirements increase

Engineering Contradiction:
Improvesystem complexityVSAvoidassembly time
Core Design Contradiction:
Device complexityVSLoss of time

Solution Approach 1:

The roller block is pre-attached to the spar during manufacturing, preparing the luffing cable mechanism for direct installation during assembly. This preliminary preparation eliminates the need for manual rope reeving operations at the construction site, significantly reducing assembly time and labor requirements while maintaining relatively simple device complexity.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentEP2129609B1Jib boom rotating tower crane
Publication Date: 2012.06.27 WOLFFKRAN
  • EP2129609B1 patent drawingFigure 1
  • EP2129609B1 patent drawingFigure 2

AI summary

The invention relates to a jib boom rotating tower crane, wherein the counterweight/pinnacle system is divided into three trellises, a rotating frame trellis, a counterweight trellis, and a pinnacle trellis, wherein the counterweight trellis has a common side with each of the pinnacle trellis and the rotating frame trellis. The pinnacle trellis preferably comprises a beam to which a pulley block with a reeved luff cable can be attached.