Train Data Management via Count Verification

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing data management systems in means of transport, such as trains, face challenges in ensuring the currentness and reliability of control data, particularly during failures or restarts of control apparatuses.

Innovation Solution

A method and system for data management that compares counts stored in control apparatuses with a check count stored in a backup apparatus, ensuring that only current control data are adopted for continued operation, thereby maintaining system reliability and security.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If control data are stored continuously in a backup apparatus, then system reliability is improved, but data currentness cannot be guaranteed without verification mechanisms

Engineering Contradiction:
Improvesystem reliabilityVSAvoiddata currentness
Core Design Contradiction:
ReliabilityVSLoss of information

Solution Approach 1:

The system performs preliminary actions by storing control data in advance in the backup apparatus before actual failures occur. The count values are continuously updated and stored alongside control data, preparing the backup system with current information ready for immediate use when the master control apparatus fails or is restarted.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system implements feedback mechanisms by comparing count values between the master control apparatus, backup control apparatus, and backup apparatus. This feedback loop verifies data currentness by checking whether stored control data are still valid before adoption, ensuring that only up-to-date control data are used to maintain system reliability.

Inventive Principle:
Principle #23Feedback

2Loss of information

If count comparison verification is implemented, then data currentness is ensured, but system complexity increases

Engineering Contradiction:
Improvedata currentnessVSAvoidsystem complexity
Core Design Contradiction:
Loss of informationVSDevice complexity

Solution Approach 1:

The verification process is segmented into distinct, manageable steps: first comparing count values between master and backup control apparatuses, then comparing with the backup apparatus count, and finally determining whether to adopt stored control data. This segmentation simplifies the overall verification process by breaking it into discrete comparison operations rather than a complex monolithic system.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The count value serves as an intermediary element that mediates between the master control apparatus, backup control apparatus, and backup apparatus. Instead of directly comparing complex control data structures, the system uses the simple count value as an intermediary indicator of data currentness, simplifying the verification process while ensuring data validity.

Inventive Principle:
Principle #24Intermediary (Mediator)

Data Source

PatentUS12275443B2Method and system for data management in a means of transport
Publication Date: 2025.04.15 SIEMENS MOBILITY GMBH
  • US12275443B2 patent drawing
  • US12275443B2 patent drawing

AI summary

A method and a system are provided for data management in a transport device, in particular in a train. In a first comparison, a first count value stored in a first control device is compared with a count value stored in a second control device. In a second comparison, a count value selected from the first and second count values on the basis of a result of the first comparison is compared with a control count value stored in a safety device. On the basis of a result of the second comparison, control data stored in the safety device and associated with the control count value are acquired by the first or second control device.