Problem

Drilling operations at deep water sites are inefficient due to the limitations of dual hoisting systems, which require stopping auxiliary well activities for stand-building operations, thereby increasing the time required to complete drilling tasks.

Innovation Solution

A triple activity system is introduced on a drillship, featuring a main well, an auxiliary well, and an offline casing and drill pipe stand-building facility, with horizontally traveling platforms to supply tubular members continuously to each activity center, allowing simultaneous independent operations at three separate locations.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If a dual hoisting system with two well centres is used, then each well centre can be equipped with its own tubular feeding system, but stand-building operations are limited to one feeder platform on each side, requiring auxiliary well activities to stop, which reduces productivity

Engineering Contradiction:
Improvedrilling operation efficiencyVSAvoidnon-productive time for stand-building
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The drill floor is divided into three independent activity centres: first activity centre with main well, second activity centre with auxiliary well, and third activity centre with offline stand-building facility. Each centre can operate independently and simultaneously, allowing stand-building operations to proceed while drilling activities continue at other centres, thereby eliminating non-productive time and improving overall productivity

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The stand-building facility is positioned offline from the traditional dual well centre arrangement, creating a third spatial dimension for operations. This offline facility receives tubular members through a separate delivery assembly, enabling parallel operations without interfering with the main and auxiliary well drilling activities

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

2Productivity

If horizontally travelling platforms are provided to each activity centre, then continuous and smooth supply of tubular members is achieved, but device complexity increases

Engineering Contradiction:
Improvetubular member supply continuityVSAvoidplatform and delivery system complexity
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The horizontally travelling platforms and delivery assemblies are designed as multi-functional systems that serve multiple activity centres. The same type of platform structure and delivery mechanism is reused across different centres, reducing overall system complexity while maintaining continuous supply capability to each centre

Inventive Principle:
Principle #6Universality (Multi-functionality)

Solution Approach 2:

The horizontally travelling platforms act as intermediary transport systems between storage areas and activity centres. These platforms provide a smooth transition and continuous supply of tubular members, mediating between the static storage locations and the dynamic drilling operations, thereby ensuring uninterrupted material flow without requiring complex direct lifting mechanisms at each centre

Inventive Principle:
Principle #24Intermediary (Mediator)

Data Source

PatentEP2981456B1A triple activity system for drilling operations
Publication Date: 2022.11.02 KEPPEL OFFSHORE & MARINE TECH CENT PTE LTD
  • EP2981456B1 patent drawingFigure 1~2
  • EP2981456B1 patent drawingFigure 3
  • EP2981456B1 patent drawingFigure 4

AI summary

This invention relates to a drilling rig or a drill ship having a first activity centre with a main well, a second activity centre with an auxiliary well and a third activity centre with offline casing and drill pipe stand-building capabilities. The offline casing and drill pipe stand-building facility is a standalone feature and can be located in the forward or aft side of a drilling rig or drill ship depending on the choice of the builder or operator.