Problem

Current drilling technologies face challenges in accurately determining the total vertical depth (TVD) during directional drilling, leading to errors that increase the complexity and cost of borehole operations and can permanently reduce well output.

Innovation Solution

A method that measures differences between projected and calculated BHA positions using a minimum curvature method, generating real-time TVD corrected gamma logs by accumulating these differences at each survey station, allowing for precise adjustments during drilling.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Measurement precision

If traditional drilling methods are used to determine TVD, then the drilling operation is simpler, but the accuracy of TVD measurement deteriorates leading to errors in well placement

Engineering Contradiction:
ImproveTVD measurement accuracyVSAvoiddrilling operation complexity
Core Design Contradiction:
Measurement precisionVSDevice complexity

Solution Approach 1:

The patent implements a feedback mechanism by continuously measuring differences between projected and calculated BHA positions at each survey station, accumulating these differences, and generating real-time TVD corrected gamma logs. This closed-loop feedback system enables continuous correction of TVD measurements, improving accuracy while managing complexity through systematic data processing

Inventive Principle:
Principle #23Feedback

Solution Approach 2:

The patent replaces traditional mechanical surveying methods with a computational approach using minimum curvature method calculations and real-time data processing. This substitution of mechanical systems with computational algorithms improves measurement precision while reducing the complexity of physical measurement equipment

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

2Manufacturing precision

If real-time TVD correction is implemented, then well placement precision is improved, but the computational processing complexity increases

Engineering Contradiction:
Improvewell placement precisionVSAvoidcomputational processing complexity
Core Design Contradiction:
Manufacturing precisionVSDevice complexity

Solution Approach 1:

The patent segments the computational process into discrete steps: measuring differences at each survey station, accumulating differences incrementally, and generating corrected gamma logs in real-time. This segmentation of the computational process makes the complex task manageable and enables real-time processing without overwhelming computational burden

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The patent performs preliminary calculations using the minimum curvature method to establish projected BHA positions before actual drilling reaches those points. This preliminary action allows for proactive correction of TVD measurements, improving well placement precision by anticipating and correcting errors before they accumulate

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS12037890B2TVD corrected geosteer
Publication Date: 2024.07.16 MOTIVE DRILLING TECH
  • US12037890B2 patent drawing
  • US12037890B2 patent drawing
  • US12037890B2 patent drawing

AI summary

A method for determining a total vertical depth (TVD) for a well plan involves measuring differences between a projected BHA position at a depth of a survey station and a calculated BHA position based upon a minimum curvature method at the depth of the survey station. The differences are accumulated at each survey station with respect to the BHA position. Real time TVD corrected gamma logs are generated responsive to the accumulated differences of the BHA position.