Two-Step Grant Active Time Handling for Uplink
Find Innovative SolutionsGenerate Solutions
Solution Overview
Problem
In the current Discontinuous Reception (DRX) framework of LTE, user equipment (UE) may not be in Active Time before receiving a complete uplink transmission grant, leading to missed messages from the eNB due to not monitoring the PDCCH channel effectively.
Innovation Solution
The UE is configured to enter Active Time upon receiving the first trigger of a two-step grant, allowing it to listen on the physical downlink control channel for messages from the network even before the complete grant is provided, enabling the eNB to send messages during this time.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Use of energy by moving object
If the UE enters DRX sleep mode to save battery power, then energy consumption is reduced, but the UE cannot receive messages from the network during sleep periods
Solution Approach 1:
The UE enters Active Time upon receiving the first trigger of a two-step grant before the complete grant is received. This preliminary action ensures the UE is awake and monitoring PDCCH when the eNB may send messages, preventing missed communications while still allowing DRX sleep for extended periods between grants
2Reliability
If the UE monitors PDCCH continuously to ensure no messages are missed, then message reception reliability is improved, but energy consumption increases
Solution Approach 1:
The UE uses periodic DRX cycles with Active Time periods strategically aligned with two-step grant reception. Instead of continuous monitoring, the UE wakes up periodically during Active Time to monitor PDCCH, achieving reliable message reception during critical periods while conserving energy during sleep periods
3Use of energy by moving object
If the UE waits for the complete two-step grant before entering Active Time, then energy is saved by staying in DRX sleep, but messages from eNB may be missed during the waiting period
Solution Approach 1:
The UE enters Active Time upon receiving the first trigger of a two-step grant before the complete grant is received. This preliminary action ensures the UE is awake and monitoring PDCCH when the eNB may send messages, preventing missed communications while still allowing DRX sleep for extended periods between grants
Data Source
AI summary
A wireless communications device, operating according to a DRX configuration and configured to receive two-step grants for uplink transmissions, determines whether the device has received a first trigger of a two-step grant. The device enters a state in which the device listens on a physical downlink control channel for messages from the network, in response to determining that the device has received the first trigger, without necessarily receiving the second trigger.


