UE Beam Prioritization for Broadcast Unicast Conflict Resolution

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

In wireless communications, user equipment (UE) faces challenges in simultaneously receiving broadcast and unicast transmissions due to scheduling conflicts, where resource overlaps and beam switching delays hinder successful decoding of both signals.

Innovation Solution

The implementation of a priority rule for the UE to select between first and second beams associated with broadcast and unicast transmissions, respectively, based on identified scheduling conflicts, allowing the UE to prioritize one transmission over the other and manage resource overlaps through beam monitoring and feedback mechanisms.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Adaptability or versatility

If the UE monitors both broadcast and unicast transmissions simultaneously, then the UE can receive diverse communication content, but scheduling conflicts and resource overlaps cause decoding failures

Engineering Contradiction:
Improveability to receive broadcast and unicast transmissionsVSAvoidsuccessful decoding of transmissions
Core Design Contradiction:
Adaptability or versatilityVSReliability

Solution Approach 1:

The UE changes its monitoring parameters dynamically by selecting between different beams based on priority rules when scheduling conflicts are detected. The UE modifies its reception behavior by switching from attempting to monitor both transmissions simultaneously to monitoring only the higher-priority transmission, thereby resolving the decoding failure issue while maintaining adaptability

Inventive Principle:
Principle #35Parameter changes

Solution Approach 2:

Instead of trying to simultaneously monitor both broadcast and unicast transmissions, the patent inverts the approach by selectively monitoring only one transmission type at a time based on priority. The UE inverts the simultaneous monitoring strategy into a sequential selection strategy, choosing to monitor either broadcast or unicast transmissions based on configured priority rules

Inventive Principle:
Principle #13The other way round (Inversion)

2Ease of operation

If the UE switches beams to resolve scheduling conflicts, then the UE can prioritize one transmission, but beam switching delays may cause missed transmissions

Engineering Contradiction:
Improveability to prioritize transmissionsVSAvoidbeam switching delay
Core Design Contradiction:
Ease of operationVSLoss of time

Solution Approach 1:

The base station performs preliminary action by providing advance notification to the UE about upcoming scheduling conflicts and the priority of transmissions. This allows the UE to prepare for beam switching in advance rather than reacting after the conflict occurs, thereby reducing the effective switching delay and preventing missed transmissions

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system implements feedback mechanisms where the base station monitors UE reception status and adjusts scheduling decisions accordingly. When beam switching delays cause transmission losses, the feedback loop allows the base station to retransmit data or adjust future scheduling to compensate for the delays, thereby mitigating the time loss

Inventive Principle:
Principle #23Feedback

Data Source

PatentUS11659572B2Prioritizing broadcast and unicast transmissions
Publication Date: 2023.05.23 QUALCOMM INC
  • US11659572B2 patent drawing
  • US11659572B2 patent drawing
  • US11659572B2 patent drawing

AI summary

Methods, systems, and devices for wireless communications are described. A user equipment (UE) may identify a priority rule for selecting to monitor a first beam associated with a first broadcast transmission or a second beam that differs from the first beam and is associated with a unicast transmission. The UE may use the priority rule when a scheduling conflict is identified between the first broadcast transmission and the unicast transmission. Such conflicts may include at least one of a broadcast transmission, a control resource set (CORESET) monitoring occasion of the broadcast transmission, or reference signals of the broadcast transmission at least partially overlapping with a unicast transmission, a CORESET monitoring occasion of the unicast transmission, or reference signals associated with the unicast transmission. The UE may monitor, in accordance with the priority rule, one of the first beam or the second beam based on identification of scheduling conflict.