UE Beam Reporting Resource Split for Uplink Conflict Handling

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

In wireless communications, there is a conflict in prioritization between user equipment (UE)-initiated beam reporting and uplink transmission procedures, particularly in contention free random access (CFRA), leading to potential communication failures due to unresolved beam conflicts.

Innovation Solution

The UE is configured with two different resource sets for uplink procedures and beam reporting, allowing it to identify concurrent needs and transmit signals based on the best beam and resource sets, either omitting or transmitting beam reports as necessary to resolve conflicts.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Device complexity

If the UE uses a single resource set for both uplink procedure and beam reporting, then the device complexity is reduced, but communication reliability deteriorates due to unresolved beam conflicts

Engineering Contradiction:
Improveresource set configurationVSAvoidcommunication reliability
Core Design Contradiction:
Device complexityVSReliability

Solution Approach 1:

The patent divides the uplink resources into two separate resource sets: a first resource set for uplink procedure transmissions and a second resource set for beam reporting transmissions. This segmentation allows the UE to independently manage and prioritize transmissions of different types, resolving beam conflicts without increasing overall system complexity.

Inventive Principle:
Principle #1Segmentation

2Reliability

If the UE prioritizes uplink procedure transmissions over beam reporting, then uplink transmission reliability is improved, but beam reporting accuracy deteriorates

Engineering Contradiction:
Improveuplink transmission reliabilityVSAvoidbeam reporting accuracy
Core Design Contradiction:
ReliabilityVSMeasurement precision

Solution Approach 1:

By segmenting resources into dedicated sets, the patent ensures that uplink procedure transmissions and beam reporting transmissions do not interfere with each other. Each transmission type has its own dedicated resource set, allowing both to be executed reliably without priority-based trade-offs.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The patent introduces dynamic priority handling where the UE can switch between different resource sets based on the type of transmission required. The UE determines which resource set to use dynamically based on whether the transmission is for uplink procedure or beam reporting, allowing flexible priority management.

Inventive Principle:
Principle #15Dynamics

3Measurement precision

If the UE performs beam measurements and reporting continuously, then beam management precision is improved, but energy consumption increases

Engineering Contradiction:
Improvebeam management precisionVSAvoidenergy consumption
Core Design Contradiction:
Measurement precisionVSUse of energy by moving object

Solution Approach 1:

The patent configures the UE to perform beam measurements and reporting at specific periodic intervals rather than continuously. The network can configure measurement periods and reporting triggers, allowing the UE to maintain beam management precision while reducing energy consumption by sleeping between measurement periods.

Inventive Principle:
Principle #19Periodic action

Data Source

PatentUS20250350339A1User equipment initiated beam reporting
Publication Date: 2025.11.13 NOKIA TECHNOLOGIES OY
  • US20250350339A1 patent drawing
  • US20250350339A1 patent drawing
  • US20250350339A1 patent drawing

AI summary

According to an aspect, a user equipment may obtain, from a network node, two different resource sets for an uplink signal for an uplink procedure and a user equipment initiated beam reporting procedure. The user equipment may measure beams to determine the best beam. The user equipment may identify a concurrent need to perform an uplink procedure transmission and a user equipment initiated beam report transmission, wherein the identifying comprises a determination whether at least one condition for triggering the user equipment initiated beam report transmission is met. The user equipment may transmit the uplink signal at least in part based on the best beam, the identified need and the two different resource sets.