UE Switching Time Parameters for 5G Measurement Gaps

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

User equipment (UE) without a spare RF chain faces challenges in performing measurements without gaps, leading to inefficiencies and resource wastage due to unknown switching times between measurement and transmission/reception, which affects scheduling efficiency and increases error rates.

Innovation Solution

The UE determines and transmits parameters such as time periods for switching between synchronization signal block measurements and transmission/reception to the network, allowing the network to optimize resource grants and minimize interruptions during measurements.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Loss of time

If UE performs measurements without gaps using a spare RF chain, then measurement continuity is improved, but device complexity increases due to requiring additional RF chains

Engineering Contradiction:
Improvemeasurement gapsVSAvoidRF chain configuration
Core Design Contradiction:
Loss of timeVSDevice complexity

Solution Approach 1:

The UE determines and reports switching time parameters in advance before measurements are performed. This allows the network to pre-configure resource grants and scheduling parameters, enabling the UE to switch between measurement and transmission/reception modes efficiently without requiring a spare RF chain, thus eliminating measurement gaps without increasing device complexity

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent introduces dynamic switching time parameters that allow the UE to flexibly transition between measurement and transmission/reception modes. By reporting these switching time parameters to the network, the system can dynamically adjust scheduling to accommodate measurement activities without requiring additional hardware resources, resolving the contradiction between measurement continuity and device complexity

Inventive Principle:
Principle #15Dynamics

2Productivity

If UE switches between measurement and transmission without known switching times, then resource allocation is simplified, but scheduling efficiency deteriorates and error rates increase

Engineering Contradiction:
Improvescheduling efficiencyVSAvoidswitching time information
Core Design Contradiction:
ProductivityVSLoss of information

Solution Approach 1:

The UE reports switching time parameters to the network entity, providing feedback about the time required to switch between measurement and transmission/reception modes. This feedback enables the network to accurately schedule resource grants, avoiding conflicts and optimizing scheduling efficiency, thereby resolving the contradiction between simplified resource allocation and scheduling efficiency

Inventive Principle:
Principle #23Feedback

Data Source

PatentUS20240284359A1Method for UE performing measurements without spare RF chain
Publication Date: 2024.08.22 NOKIA TECHNOLOGIES OY
  • US20240284359A1 patent drawing
  • US20240284359A1 patent drawing
  • US20240284359A1 patent drawing

AI summary

An apparatus may be configured to: determine at least one parameter associated with measurement of at least one synchronization signal block (SSB), wherein the at least one parameter comprises at least one of: an indication of a time period between measurements of SSBs, an indication of a minimum time period between measurements of SSBs, an indication of a first time period to switch from measurement of an SSB to transmission, an indication of a second time period to switch from reception to measurement of the SSB, an indication of a third time period to switch from measurement of the SSB to reception, or an indication of a fourth time period to switch from transmission to measurement of the SSB; and transmit, to a network entity, the at least one parameter related to a switching time between measurement and transmission or reception.