Unified Project Interface for Cross-Platform Content Linking

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing project management software applications are complex, difficult to use, and require multiple tools for managing tasks, documents, schedules, and communications, making them burdensome and time-consuming for users.

Innovation Solution

A content management system that uses project identifiers to manage data and people, allowing for easy access to project items through a graphical user interface, and automatically suggests affiliations based on user behavior, reducing the need for multiple software applications by linking content items across different locations and platforms.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Adaptability or versatility

If multiple software applications are used to manage tasks, documents, schedules, and communications, then functional completeness is improved, but system complexity and ease of operation deteriorate

Engineering Contradiction:
Improvefunctional completenessVSAvoidsystem complexity
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

The patent combines multiple project management functions (tasks, documents, schedules, communications, and files) into a single unified software application. The system provides a centralized interface where users can manage all project-related activities without needing to switch between multiple applications, thereby reducing system complexity while maintaining functional completeness.

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The software application is designed to perform multiple project management functions within a single platform. It can handle task management, document storage, scheduling, communications, and file management simultaneously, making the system universal and eliminating the need for multiple specialized applications.

Inventive Principle:
Principle #6Universality (Multi-functionality)

2Adaptability or versatility

If multiple software applications are used to manage various project activities, then functional completeness is improved, but ease of operation deteriorates

Engineering Contradiction:
Improvefunctional completenessVSAvoidease of operation
Core Design Contradiction:
Adaptability or versatilityVSEase of operation

Solution Approach 1:

By merging all project management functions into a single application with a unified interface, the system eliminates the need for users to learn and switch between multiple different software tools. The consistent interface and centralized access to all project elements significantly improve ease of operation.

Inventive Principle:
Principle #5Merging (Combining)

3Adaptability or versatility

If multiple software applications are used to manage project activities, then functional completeness is improved, but time consumption increases

Engineering Contradiction:
Improvefunctional completenessVSAvoidtime consumption
Core Design Contradiction:
Adaptability or versatilityVSLoss of time

Solution Approach 1:

The unified application allows users to access and manage all project-related activities (tasks, documents, schedules, communications, and files) from a single interface, eliminating the time required to switch between multiple applications and reducing overall time consumption for project management.

Inventive Principle:
Principle #5Merging (Combining)

4Adaptability or versatility

If content items are stored in different locations, then storage flexibility is improved, but system complexity increases

Engineering Contradiction:
Improvestorage flexibilityVSAvoidsystem complexity
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

The system introduces a centralized project identifier as an intermediary that links to content items stored in different locations. This project identifier acts as a mediator that provides unified access to content items regardless of their physical storage location, maintaining storage flexibility while simplifying the user interface and reducing system complexity.

Inventive Principle:
Principle #24Intermediary (Mediator)

Data Source

PatentUS10970656B2Automatically suggesting project affiliations
Publication Date: 2021.04.06 DROPBOX INC
  • US10970656B2 patent drawing
  • US10970656B2 patent drawing
  • US10970656B2 patent drawing

AI summary

Disclosed are systems, methods, and non-transitory computer-readable storage media for managing projects using references between the project and project items. Project items can be, for example, synchronized content items, collaborative content items, other projects, folders, tasks, user accounts, etc. The content management system can create a project identifier for managing data and/or people associated with a project. In various implementations, the content management system can store references between the project and project items in one or more folders associated with the project, in a database, in content item metadata, etc. In some implementations, the storage location of a content item does not affect whether it is associated with the project. When a project is selected by a user, the content management system can generate project view that presents various project items associated with the project in a convenient and easy to access graphical user interface.