Universal Project Management Framework for Enterprise Resource Optimization

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current project management methods and technologies fail to consistently deliver projects on time, within budget, and to specification, particularly in the IT sector, due to inadequate training of project managers and ineffective use of commercial-off-the-shelf technologies and project management standards.

Innovation Solution

A universal framework for project management is implemented on a server computer, utilizing a standardized set of process-related assets and technological tools to manage projects, including human resource selection, assignment, development, certification, and management, integrated with a project management methodology that organizes assets by project phases, dimensions, and knowledge areas.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If project management standards and processes are implemented, then project quality and compliance are improved, but implementation effectiveness deteriorates due to lack of enforcement and adaptability to diverse projects

Engineering Contradiction:
Improveproject qualityVSAvoidimplementation effectiveness
Core Design Contradiction:
ReliabilityVSProductivity

Solution Approach 1:

The patent creates a universal project management framework that integrates standards, processes, tools, and training into a single multi-functional system. This framework can be adapted to diverse projects while maintaining core compliance requirements, resolving the contradiction between standardized quality and adaptive effectiveness.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Solution Approach 2:

The system introduces an intermediary project management platform that connects standards to actual project execution. This intermediary enforces compliance through automated checkpoints and provides adaptability through configurable parameters, bridging the gap between rigid standards and diverse project needs.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Extent of automation

If commercial-off-the-shelf technologies are used, then automation capability is improved, but system integration and coordination deteriorate due to ad hoc usage

Engineering Contradiction:
Improveautomation capabilityVSAvoidsystem integration
Core Design Contradiction:
Extent of automationVSDevice complexity

Solution Approach 1:

The patent merges multiple commercial-off-the-shelf project management tools into a unified integrated system. By combining scheduling, resource management, budgeting, and compliance tracking into a single platform, it maintains high automation capability while reducing the integration complexity of using multiple separate tools.

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The integrated system provides multi-functional capabilities that replace multiple separate COTS tools. A single platform performs scheduling, resource allocation, budget tracking, and compliance monitoring, reducing system integration complexity while maintaining comprehensive automation.

Inventive Principle:
Principle #6Universality (Multi-functionality)

3Reliability

If project managers are trained with task-specific knowledge, then individual competence is improved, but overall project management capability deteriorates due to difficulty in managing at project level

Engineering Contradiction:
Improveindividual competenceVSAvoidmanagement coordination
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The patent segments project management training and capability into hierarchical levels: individual task-specific competencies, project-level coordination skills, and organizational management capabilities. This segmentation allows targeted training at each level while providing integrated support across all levels through the system framework.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The system acts as an intermediary that connects individually trained project managers with organizational goals. It provides standardized processes and tools that translate individual task competencies into coordinated project-level execution, reducing the complexity of managing individual capabilities at the project level.

Inventive Principle:
Principle #24Intermediary (Mediator)

Data Source

PatentUS8407078B1Method of and system for managing projects, programs and portfolios throughout the project lifecycle
Publication Date: 2013.03.26 PEROT SYSTEMS CORP
  • US8407078B1 patent drawing
  • US8407078B1 patent drawing
  • US8407078B1 patent drawing

AI summary

In one embodiment, a project-management method includes implementing, on a server computer having a processor and memory, a universal framework for engaging projects within an enterprise. The project-management method further includes optimizing, via the server computer, at least one project via an integration of a standardized set of process-related project-management assets, a standardized set of project-management assets related to at least one of selecting, assigning, developing, certifying, and managing human resources involved in project management, and a standardized set of project-management assets comprising a plurality of technological tools.