Problem

Conventional asset maintenance protocols for utility poles and power lines fail to accurately predict vegetation-driven outages, leading to inefficient resource allocation and increased outage rates due to cyclical trimming schedules that do not account for varying vegetation risks across different areas.

Innovation Solution

The use of vegetation images, geospatial analysis, machine learning models, and linear programming to determine failure probabilities and optimize maintenance protocols, allowing for risk-based scheduling that prioritizes high-risk areas and optimizes resource utilization.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of operation

If cyclical trimming schedules are used for vegetation maintenance, then maintenance operations are simple and methodical, but vegetation-driven outages increase in high-risk areas

Engineering Contradiction:
Improvemaintenance operation simplicityVSAvoidoutage prevention reliability
Core Design Contradiction:
Ease of operationVSReliability

Solution Approach 1:

The system segments the service area into multiple zones based on vegetation risk assessment, with each zone having customized maintenance protocols. High-risk areas receive more frequent and intensive trimming, while low-risk areas receive less frequent maintenance, replacing the uniform cyclical schedule with differentiated zone-based schedules.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The maintenance schedule transitions from static cyclical timing to dynamic risk-based scheduling. The system continuously monitors vegetation growth, weather conditions, and historical outage data to adjust maintenance frequency and intensity in real-time, making the schedule adaptive rather than fixed.

Inventive Principle:
Principle #15Dynamics

2Area of stationary object

If cyclical trimming schedules cover all areas uniformly, then maintenance coverage is comprehensive, but resource allocation becomes inefficient

Engineering Contradiction:
Improvemaintenance coverage areaVSAvoidmaintenance resource efficiency
Core Design Contradiction:
Area of stationary objectVSProductivity

Solution Approach 1:

The system applies different maintenance qualities and intensities to different locations based on local vegetation risk characteristics. High-risk areas receive aggressive, frequent trimming with higher resource allocation, while low-risk areas receive minimal maintenance, optimizing resource distribution according to local needs rather than uniform coverage.

Inventive Principle:
Principle #3Local quality

Solution Approach 2:

The system changes key maintenance parameters (frequency, intensity, timing) based on vegetation risk assessment results. Maintenance protocols are adjusted dynamically according to parameters such as vegetation growth rate, proximity to power lines, and historical outage data, replacing fixed cyclical parameters with adaptive ones.

Inventive Principle:
Principle #35Parameter changes

3Ease of manufacture

If conventional trimming methods are used, then maintenance processes are straightforward, but prediction accuracy of vegetation-driven outages remains poor

Engineering Contradiction:
Improvemaintenance process simplicityVSAvoidoutage prediction accuracy
Core Design Contradiction:
Ease of manufactureVSMeasurement precision

Solution Approach 1:

The system implements feedback loops where actual outage data, vegetation growth measurements, and weather conditions are continuously monitored and fed back into the risk assessment model. This feedback refines prediction accuracy over time while maintaining relatively simple maintenance execution processes based on the refined predictions.

Inventive Principle:
Principle #23Feedback

Solution Approach 2:

The system replaces simple calendar-based cyclical scheduling mechanics with sophisticated predictive analytics using machine learning models, geospatial analysis, and vegetation monitoring data. This substitution dramatically improves prediction accuracy while the actual maintenance execution remains straightforward based on the enhanced predictions.

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

Data Source

PatentUS11908186B2Systems and methods for optimizing asset maintenance protocols by predicting vegetation-driven outages
Publication Date: 2024.02.20 MCKINSEY & CO INC
  • US11908186B2 patent drawing
  • US11908186B2 patent drawing
  • US11908186B2 patent drawing

AI summary

Systems and methods for optimizing asset maintenance protocols by predicting vegetation-driven outages are disclosed. An example method includes determining, by one or more processors, a failure probability for each asset in a set of assets within a designated area. The example method further includes defining, by the one or more processors, an asset risk for each asset in the set of assets based on the failure probability, and clustering, by the one or more processors, vegetation within the designated area to determine a predicted vegetation-driven outage. The example method further includes optimizing, by the one or more processors, a set of asset maintenance protocols corresponding to the set of assets based on the asset risk and the predicted vegetation-driven outage.