Commissioning system for ventilaton system

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Inadequate training of installers leads to sub-optimal or incorrect configuration of ventilation systems during initial commissioning, resulting in inefficient air flow and potential issues like stale air and mold, especially in modern buildings with improved seals where balanced ventilation systems are necessary.

Innovation Solution

A ventilation system control unit that requires a setup program to be completed successfully before operation, guiding the installer through a specific sequence of setting fan speeds from boost to trickle, ensuring optimal configuration and preventing the system from reverting to default settings.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Loss of time

If default settings are used for ventilation system configuration, then installation time is reduced, but system performance and reliability deteriorate due to incorrect or sub-optimal configuration

Engineering Contradiction:
Improveinstallation timeVSAvoidsystem configuration reliability
Core Design Contradiction:
Loss of timeVSReliability

Solution Approach 1:

The system performs preliminary configuration actions by blocking operation until a setup program is completed. This forces the installer to perform necessary configuration steps (measuring airflows, setting fan speeds, adjusting valves) before the system can operate, ensuring proper commissioning without requiring additional time after installation.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

A control unit acts as an intermediary between the installer and the ventilation system operation. It mediates by requiring completion of a setup program that guides the installer through proper configuration steps, serving as a gatekeeper that prevents operation until correct setup is achieved.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Reliability

If installer training is improved to ensure proper configuration, then system performance improves, but installation time and cost increase

Engineering Contradiction:
Improveconfiguration accuracyVSAvoidinstallation time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The ventilation system performs self-verification by automatically detecting whether proper commissioning has been completed. The control unit monitors setup completion and automatically blocks operation if configuration is insufficient, eliminating the need for external verification and reducing reliance on installer expertise.

Inventive Principle:
Principle #25Self-service

3Ease of operation

If the system allows operation with default settings, then ease of operation improves, but harmful effects increase due to stale air and mold growth

Engineering Contradiction:
Improvesystem operabilityVSAvoidstale air and mold
Core Design Contradiction:
Ease of operationVSObject-generated harmful factors

Solution Approach 1:

The system applies preliminary anti-action by preventing operation before harmful conditions can develop. The control unit blocks system operation until proper configuration is completed, stopping the potential generation of harmful effects (stale air, mold) before they can occur during system use.

Inventive Principle:
Principle #9Preliminary anti-action

4Reliability

If a setup program is required before operation, then configuration reliability improves, but device complexity increases

Engineering Contradiction:
Improvecommissioning reliabilityVSAvoidsystem setup complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

A control unit acts as an intermediary between the installer and the ventilation system operation. It mediates by requiring completion of a setup program that guides the installer through proper configuration steps, serving as a gatekeeper that prevents operation until correct setup is achieved.

Inventive Principle:
Principle #24Intermediary (Mediator)

Data Source

PatentEP2962045B1Commissioning system for ventilaton system
Publication Date: 2021.08.11 ZEHNDER GRP UK
  • EP2962045B1 patent drawingFigure 1
  • EP2962045B1 patent drawingFigure 2-1
  • EP2962045B1 patent drawingFigure 2-2

AI summary

A ventilation system comprises a control unit for controlling extraction and/or supply of air within a building, wherein said control unit is arranged such that it will not operate to supply and/or extract air until after a setup program has been successfully completed. Requiring execution of the setup program before permitting operation of the system ensures that the commissioning process is duly followed and that the system is not left operating on non-optimal default values. There is also provided a ventilation system comprising a control unit for controlling extraction and/or supply of air within a building, wherein said unit is capable of switching at least one fan between a trickle speed and a boost speed, wherein said control unit is provided with a setup program, and wherein said setup program requires a user to set the boost fan speed before setting the trickle fan speed. This facilitates use of the optimal setup process according to best practice and helps to ensure correct setup as well as reducing the time taken to achieve the optimal settings.