Virtual Connectivity Change for IC Failure Analysis

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current focused ion beam (FIB) operations for integrated circuit failure analysis are time-consuming and costly, heavily dependent on user skill, and lack assurance of electrical connectivity before physical modifications, which can lead to costly mistakes and damage to circuits.

Innovation Solution

A method and computer program product for performing virtual connectivity changes between nets in an integrated circuit, allowing simulation of FIB cuts and deposits within a virtual environment to verify electrical connectivity before physical operations, reducing guesswork and potential damage.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If FIB operations are performed to repair failed portions of IC chip, then electrical connectivity can be restored, but the process is time-consuming and costly

Engineering Contradiction:
Improveelectrical connectivityVSAvoidFIB operation time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The patent performs preliminary actions by simulating FIB operations in a virtual environment before executing them on the actual IC chip. The system uses EDA tools to create a virtual model of the chip, allows users to plan and simulate connectivity changes, and verifies the effectiveness of proposed repairs virtually. This preliminary virtual execution prevents unnecessary physical FIB operations, thereby reducing time loss while ensuring reliable electrical connectivity restoration.

Inventive Principle:
Principle #10Preliminary action

2Measurement precision

If FIB operations are performed to locate failure, then failure location can be identified, but it is often a guess and heavily dependent on user skill

Engineering Contradiction:
Improvefailure location identificationVSAvoiduser skill dependency
Core Design Contradiction:
Measurement precisionVSEase of operation

Solution Approach 1:

The patent introduces an intermediary system consisting of EDA tools and virtual simulation environment that mediates between the user and the actual FIB operation. The system provides automated guidance through virtual models, allowing users to visualize and plan precise failure location identification without requiring extensive expertise. The intermediary virtual environment translates complex chip structures into intuitive graphical representations, reducing user skill dependency while improving measurement precision for failure location identification.

Inventive Principle:
Principle #24Intermediary (Mediator)

3Reliability

If physical FIB operations are performed on IC, then connectivity can be verified, but there is risk of damaging the circuit if operation is incorrect

Engineering Contradiction:
Improveconnectivity verificationVSAvoidcircuit damage risk
Core Design Contradiction:
ReliabilityVSObject-affected harmful factors

Solution Approach 1:

The patent applies preliminary anti-action by using virtual simulation to counteract potential harmful effects before they occur in physical operations. The system allows users to test and verify connectivity changes in a risk-free virtual environment, identify potential errors, and correct them before executing actual FIB operations. This preliminary counter-measurement prevents incorrect physical operations that could damage the circuit, while still ensuring reliable connectivity verification through the virtual model.

Inventive Principle:
Principle #9Preliminary anti-action

4Reliability

If multiple layers are involved in net connectivity, then complex electrical paths exist, but verifying connectivity becomes more difficult

Engineering Contradiction:
Improveelectrical connectivityVSAvoidconnectivity verification difficulty
Core Design Contradiction:
ReliabilityVSDifficulty of detecting and measuring

Solution Approach 1:

The patent transitions from two-dimensional planar views to three-dimensional virtual models to better visualize and verify connectivity across multiple layers. The EDA tools generate 3D representations of the chip structure, allowing users to navigate and inspect electrical paths through multiple layers from different angles and perspectives. This dimensional enhancement makes it easier to detect and measure connectivity relationships in complex multi-layer networks while maintaining reliable electrical connectivity verification.

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

Data Source

PatentUS10990077B2Electronic virtual layer
Publication Date: 2021.04.27 SYNOPSYS INC
  • US10990077B2 patent drawing
  • US10990077B2 patent drawing
  • US10990077B2 patent drawing

AI summary

A method of performing virtual connectivity change between first and second nets associated with an integrated circuit is presented. The method includes generating a first top view and a first perspective views of a layout of the integrated circuit when a computer is invoked to perform the virtual connectivity change. The method further includes defining layers associated with the first and second nets, and defining a boundary of the virtual connectivity change. The method further includes performing the virtual connectivity change between the first and second nets within the boundary, and generating a second top view and a second perspective view of the layout of the integrated circuit after the virtual connectivity change.