Unified Gantt Chart for Visual Resource Allocation

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current project management tools, such as Gantt charts, lack a unified view of task duration and resource allocation, requiring frequent switching between views to effectively plan tasks and allocate resources, making it difficult for project managers to identify and eliminate critical paths.

Innovation Solution

A visual resource allocation system that displays a Gantt chart with task indicators segmented by resource allocation, allowing project managers to visually identify resource-heavy tasks and reallocate resources directly within the chart, thereby eliminating critical paths.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Measurement precision

If separate views are used for task duration and resource allocation, then each view can be optimized independently, but frequent switching between views is required making it difficult to identify and eliminate critical paths

Engineering Contradiction:
Improvetask duration measurementVSAvoidresource allocation operation
Core Design Contradiction:
Measurement precisionVSEase of operation

Solution Approach 1:

The patent combines task duration view and resource allocation view into a single unified Gantt chart interface. Task indicators are segmented to show both temporal information and resource allocation information simultaneously, eliminating the need to switch between separate views while maintaining measurement precision and ease of operation.

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The Gantt chart is designed to perform multiple functions: displaying task duration, showing resource allocation through segmented indicators, and enabling direct resource reallocation. This multi-functional design allows project managers to identify critical paths and reallocate resources within the same interface.

Inventive Principle:
Principle #6Universality (Multi-functionality)

2Loss of information

If detailed resource allocation information is displayed for each task, then resource-heavy tasks can be identified, but the chart becomes more complex making it harder to visualize overall project timeline

Engineering Contradiction:
Improveresource allocation informationVSAvoidchart complexity
Core Design Contradiction:
Loss of informationVSDevice complexity

Solution Approach 1:

Task indicators are segmented into multiple segments, where each segment represents a different resource allocated to that task. This segmentation allows detailed resource allocation information to be displayed while maintaining a clean visual structure that doesn't overwhelm the overall chart readability.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

Different parts of the task indicator serve different functions: the position along the timeline shows task duration, while the segmented structure shows resource allocation. This local differentiation of information density allows detailed resource information to be presented without increasing overall chart complexity.

Inventive Principle:
Principle #3Local quality

3Adaptability or versatility

If manual resource reallocation is performed outside the Gantt chart, then resource allocation can be adjusted, but project managers cannot quickly identify and eliminate critical paths

Engineering Contradiction:
Improveresource allocation flexibilityVSAvoidcritical path elimination efficiency
Core Design Contradiction:
Adaptability or versatilityVSProductivity

Solution Approach 1:

The Gantt chart enables direct resource reallocation through drag-and-drop interaction with task indicator segments. Project managers can reallocate resources by dragging segments between tasks, and the system automatically updates task durations and identifies critical paths, eliminating the need to switch to separate resource allocation tools.

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The system provides immediate visual feedback when resources are reallocated: task durations are automatically updated, critical paths are reidentified, and the Gantt chart refreshes to show the new project timeline. This real-time feedback loop enables project managers to quickly eliminate critical paths by making informed reallocation decisions.

Inventive Principle:
Principle #23Feedback

Data Source

PatentUS9818076B2Visual resource allocation system
Publication Date: 2017.11.14 ORACLE INT CORP
  • US9818076B2 patent drawing
  • US9818076B2 patent drawing
  • US9818076B2 patent drawing

AI summary

A system is provided that visualizes an allocation of resources. The system displays a chart, where the chart includes a list of tasks and a timeline including time units. The system further displays task indicators within the timeline of the chart, where a task indicator includes task indicator segments, and where an area of a task indicator segment is proportional to a work scope of a resource allocated to a corresponding task. The system further receives a user interaction that includes a movement of the task indicator segment from a first task indicator that corresponds to a first task to a second task indicator that corresponds to a second task. The system further allocates the resource from the first task to the second task. The system further modifies the display of at least one task indicator within the timeline of the chart based on the allocation of the resource.