Visual Task Assignment System for Multi-Resource Project Planning
Find Innovative SolutionsGenerate Solutions
Solution Overview
Problem
Project planning systems lack the ability to visually depict and interactively manage tasks assigned to multiple resources and milestone tasks within a project plan timeline, making it difficult to display resource allocation percentages and distinguish milestone tasks effectively, while also failing to provide dynamic monitoring and resource allocation for irregular work flows.
Innovation Solution
A visual task assignment system that allows users to assign tasks and milestone tasks to multiple resources within a project plan timeline, displaying resource allocation percentages and enabling dynamic resource allocation by dragging and dropping task indicators between resource channels, and converting milestone tasks between different types for clear visualization.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Ease of manufacture
If a milestone task is displayed as a diamond shape to distinguish it from conventional tasks, then the milestone task becomes visually identifiable, but the display space is significantly reduced and other tasks cannot be displayed in the same vicinity
Solution Approach 1:
The patent applies color changes by displaying milestone tasks with different colors or shading patterns compared to conventional tasks. This allows milestone tasks to be visually distinguished without requiring large diamond shapes, thus maintaining adequate display space for other tasks in the vicinity.
Solution Approach 2:
The patent transitions from using shape (2D visual form) to using color/shading (visual property dimension) to distinguish milestone tasks. This dimensional change allows for effective visual identification while preserving layout flexibility and display space.
2Adaptability or versatility
If a project plan timeline allows interactive assignment of tasks to multiple resources with individual resource allocation percentages, then resource management capability is improved, but the system complexity increases
Solution Approach 1:
The patent segments the task indicator into multiple portions, with each portion corresponding to a different resource assignment. This segmentation allows the system to handle multiple resource assignments independently while maintaining a unified visual representation, thereby managing complexity through structured division.
Solution Approach 2:
The project plan timeline view is enhanced to serve multiple functions: displaying task assignments to multiple resources, showing individual resource allocation percentages, and enabling interactive modification of these assignments. This multi-functionality is achieved by integrating resource management capabilities directly into the timeline view without requiring separate interfaces.
3Loss of information
If the project plan timeline displays detailed information about task assignments and resource allocations, then information completeness is improved, but the visual clarity and ease of interaction are reduced
Solution Approach 1:
The task indicator is segmented into multiple portions displayed within the project plan timeline, where each portion represents a specific resource assignment. This segmentation allows detailed information to be distributed across the timeline view in a structured manner, maintaining visual clarity while providing complete assignment information.
Solution Approach 2:
The patent creates visual copies or representations of task assignment information directly within the project plan timeline view. Instead of requiring users to navigate to separate detail views, the system displays condensed representations of task assignments and resource allocations inline, providing information completeness while maintaining ease of operation.
Data Source
AI summary
A system is provided that visualizes task assignments. The system displays a project plan timeline within a user interface. The system further displays a first resource indicator and a second resource indicator within the project plan timeline. The system further displays a task indicator within the first resource indicator. The system further defines a side-area region of the task indicator, where the defining the side-area region designates the task as a multi-resource enabled task. The system further assigns the task to the second resource in response to a drag of the side-area region of the task indicator and a drop within the second resource indicator, where the task is assigned to both the first resource and the second resource. The system further displays a first task part indicator and a second task part indicator within the project plan timeline in place of the display of the task indicator. The first task part indicator is displayed within the first resource indicator and the second task part indicator is displayed within the second resource indicator.