Multi-Level Waste Transfer Facility with Active Screening

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Waste transfer facilities face issues such as increased traffic, noise, odors, wildlife attraction, litter, and environmental concerns due to the handling and storage of waste, as well as inefficiencies in waste management and the presence of non-compliant materials.

Innovation Solution

A waste transfer facility design that includes separate levels for different types of waste, with a system for active screening and removal of non-compliant materials during transfer, reducing waste residency time and utilizing a layout that minimizes environmental impact by consolidating loads onto larger vehicles and directing waste directly to receptacles for efficient removal.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Device complexity

If waste is transferred using traditional single-level facilities, then the transfer process is simple, but traffic congestion, noise, and wildlife attraction increase

Engineering Contradiction:
Improvefacility structureVSAvoidtraffic congestion, noise, wildlife attraction
Core Design Contradiction:
Device complexityVSObject-affected harmful factors

Solution Approach 1:

The waste transfer facility is divided into multiple levels with separate unloading areas for different waste types (municipal household waste on one level, construction and demolition waste on another). This segmentation allows simultaneous operation of different waste streams, reducing overall transfer time and vehicle turnover, thereby decreasing traffic congestion and noise while the elevated structure reduces wildlife attraction to ground-level waste

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The facility transitions from a traditional single-level horizontal layout to a multi-level vertical structure. Waste receptacles are positioned at different heights and locations, with municipal household waste receptacles at one elevation and construction and demolition waste receptacles at another. This vertical dimensionality change optimizes space utilization, enables parallel processing of different waste types, and reduces the footprint on ground level, thereby minimizing environmental impact while maintaining operational efficiency

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

2Measurement precision

If waste is stored and handled for extended periods, then sorting and screening can be performed, but odor and environmental impact increase

Engineering Contradiction:
Improvewaste screening accuracyVSAvoidodor, environmental impact
Core Design Contradiction:
Measurement precisionVSObject-generated harmful factors

Solution Approach 1:

The facility performs preliminary sorting and screening actions during the unloading process itself. As waste is being transferred from vehicles to receptacles, non-compliant materials are identified and removed in real-time rather than after complete storage. This preliminary action reduces the time waste remains on-site, minimizing odor generation and environmental impact while maintaining screening accuracy through active monitoring during the transfer operation

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system rapidly processes waste through the transfer and screening operation, minimizing residence time. Non-compliant materials are quickly identified and removed during unloading, and compliant waste is promptly transferred to receptacles for immediate removal. This rushed-through approach prevents waste from lingering in the facility, thereby reducing odor and environmental impact while maintaining effective screening through continuous active monitoring

Inventive Principle:
Principle #21Skipping (Rushing through)

3Productivity

If non-compliant materials are not screened out, then waste transfer is faster, but hazardous materials reach disposal sites

Engineering Contradiction:
Improvewaste transfer speedVSAvoidhazardous material removal
Core Design Contradiction:
ProductivityVSReliability

Solution Approach 1:

The waste transfer system incorporates self-service screening capabilities where the facility itself performs the screening function during the transfer process. As waste is unloaded into receptacles, the system actively screens for non-compliant materials through monitoring and detection mechanisms. This self-service approach integrates safety screening directly into the high-speed transfer operation, eliminating the need for separate screening stages and maintaining both productivity and reliability simultaneously

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The facility implements a feedback mechanism where the screening process provides real-time information about the composition of incoming waste loads. As waste is being transferred, the system continuously monitors for non-compliant materials and provides feedback that triggers immediate removal actions. This feedback loop enables the system to maintain high transfer speeds while ensuring hazardous materials are reliably identified and removed before waste leaves the facility

Inventive Principle:
Principle #23Feedback

4Manufacturing precision

If multiple waste types are handled separately, then contamination is reduced, but facility space and complexity increase

Engineering Contradiction:
Improvewaste separation purityVSAvoidfacility footprint
Core Design Contradiction:
Manufacturing precisionVSArea of stationary object

Solution Approach 1:

The facility handles multiple waste types by utilizing vertical space rather than horizontal expansion. Municipal household waste and construction and demolition waste are processed on different levels, with receptacles positioned at various heights. This vertical arrangement maintains complete separation between waste types, preventing contamination, while minimizing the ground footprint by efficiently using the third dimension for organization and storage

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

Data Source

PatentUS11613424B1Waste transfer facility
Publication Date: 2023.03.28 RAPTOR RECYCLE & TRANSFER LLC
  • US11613424B1 patent drawing
  • US11613424B1 patent drawing
  • US11613424B1 patent drawing

AI summary

This disclosure relates to a waste transfer facility. The waste transfer facility includes a first level, the first level positioned at a first height, the first level including a first side, and a second side. The waste transfer facility also includes a second level, the second level positioned at a second height different than the first height, the second level including a plurality of waste receptacles, the plurality of waste receptacles including a first waste receptacle positioned adjacent to the first side to receive waste, a second waste receptacle positioned adjacent to the second side to receive waste, and a non-compliant waste receptacle to receive non-compliant waste, the non-compliant waste to be removed from the waste.