Weatherproofed Electrical Modules for Early Rough-In Installation

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Traditional construction methods for multi-unit buildings face significant delays and increased costs due to the logistical challenges of electrical system installation, which cannot begin until the building is 'dried in', leading to prolonged labor costs and inconsistent installations.

Innovation Solution

The development of prefabricated electrical modules that are weatherproofed and can be installed before the building envelope is complete, allowing for early electrical installation and reducing on-site labor costs and time delays through prefabrication and standardized module assembly.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If traditional construction methods are used where electrical installation waits for the building to be dried in, then moisture protection is ensured, but construction time is significantly extended and labor costs increase

Engineering Contradiction:
Improvemoisture protectionVSAvoidconstruction time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The electrical installation system is segmented into modular units that can be independently weatherproofed and installed in different phases. This allows the building envelope to be completed in sections while electrical modules are installed in other sections, eliminating the need to wait for the entire building to be dried in before starting electrical work.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

Electrical modules are pre-assembled and weatherproofed in advance at a fabrication facility before being transported to the construction site. This preliminary preparation allows electrical installation to occur concurrently with building envelope completion rather than sequentially, significantly reducing overall construction time while maintaining moisture protection.

Inventive Principle:
Principle #10Preliminary action

2Reliability

If electrical installation waits for complete building envelope completion, then proper inspection conditions are met, but labor costs and project duration increase

Engineering Contradiction:
Improveinspection qualityVSAvoidinstallation efficiency
Core Design Contradiction:
ReliabilityVSProductivity

Solution Approach 1:

Electrical modules are pre-assembled with all necessary components and connections before being installed in the building. This preliminary assembly allows for quality control and inspection to occur during manufacturing rather than waiting until the building is complete, enabling continuous construction progress without compromising inspection quality.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The electrical system is divided into discrete, inspectable modules that can be individually verified for quality before installation. This segmentation allows inspectors to check each module independently as it is installed, rather than waiting for the entire electrical system to be complete, thereby maintaining inspection rigor while improving overall productivity.

Inventive Principle:
Principle #1Segmentation

3Adaptability or versatility

If on-site electrical assembly is performed after building completion, then flexibility is maintained, but labor costs increase and installation consistency decreases

Engineering Contradiction:
Improveinstallation flexibilityVSAvoidinstallation consistency
Core Design Contradiction:
Adaptability or versatilityVSManufacturing precision

Solution Approach 1:

Electrical modules are pre-assembled in a controlled fabrication environment where precision and consistency can be ensured through standardized processes and equipment. This preliminary assembly maintains high manufacturing precision while the modular design preserves flexibility for adaptation to different building configurations during installation.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The electrical modules are designed with standardized dimensions, connection points, and mounting configurations that maintain consistency across all installations. These fixed parameters ensure uniform quality while the modular nature allows flexibility in placement and configuration to adapt to different building layouts and requirements.

Inventive Principle:
Principle #35Parameter changes

Data Source

PatentUS11923665B2Prefabricated electrical modules and system with fabrication and construction methods
Publication Date: 2024.03.05 RODNICK LLC
  • US11923665B2 patent drawing
  • US11923665B2 patent drawing
  • US11923665B2 patent drawing

AI summary

Prefabricated electrical modules and system along with fabrication and construction methods are provided. The prefabricated electrical system includes multiple framed, prefabricated electrical modules of one or more types. The prefabricated electrical module disclosed may comprise one or more of a main service electrical module, a low-voltage module, a switch component module, and a receptacle component module. The casing of the interior components of the modules is weatherproofed and/or weatherized. Each of the modules includes a module exterior frame that accommodates the specialized elements of that particular module. Methods for fabrication of the modules are disclosed. Construction methods for installing the assemblies are also disclosed.