Wellsite Performance System Dynamic Adjustment

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current well planning processes face challenges in dynamically adjusting drilling operations based on real-time data and changing subsurface conditions, leading to inefficiencies and potential risks during the drilling of wells.

Innovation Solution

A system and method that utilize a wellsite system with processors, network interfaces, and memory to receive metrics, analyze options for well planning, implement adjustments based on real-time information, and dynamically adjust drilling operations to optimize well trajectory and resource management.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Adaptability or versatility

If traditional well planning processes are used, then initial well plans can be established, but they cannot dynamically adjust to real-time data and changing subsurface conditions

Engineering Contradiction:
Improveability to adjust well planVSAvoidresponse time to changing conditions
Core Design Contradiction:
Adaptability or versatilityVSLoss of time

Solution Approach 1:

The system transitions from static well planning to dynamic adaptive planning by continuously receiving real-time metrics from wellsite systems and automatically adjusting well plan options based on current subsurface conditions and operational data

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

The system implements closed-loop feedback by receiving real-time information from wellsite systems during option implementation, evaluating the effectiveness of current plans, and automatically generating adjusted options based on the feedback to continuously optimize drilling operations

Inventive Principle:
Principle #23Feedback

2Productivity

If real-time adjustments are implemented, then drilling efficiency and safety improve, but system complexity increases

Engineering Contradiction:
Improvedrilling efficiencyVSAvoidsystem complexity
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The system integrates multiple functions into a unified platform that combines metric reception, option analysis, plan adjustment, and performance evaluation capabilities, allowing a single system to handle diverse drilling operations and decision-making processes

Inventive Principle:
Principle #6Universality (Multi-functionality)

Solution Approach 2:

The system performs automatic analysis and adjustment of well plan options based on received metrics and real-time data, reducing the need for manual intervention and expert analysis while maintaining high-level decision-making capabilities

Inventive Principle:
Principle #25Self-service

Data Source

PatentUS10626714B2Wellsite performance system
Publication Date: 2020.04.21 SCHLUMBERGER TECH CORP
  • US10626714B2 patent drawing
  • US10626714B2 patent drawing
  • US10626714B2 patent drawing

AI summary

A method can include receiving at least one metric; analyzing options associated with implementation of at least a portion of a well plan with respect to the at least one metric; implementing one of the options; receiving information via a wellsite system during implementation of the one of the options; adjusting the one of the options based at least in part on the information to provide an adjusted option; and implementing the adjusted option.