Wind Farm Black Start Control Using Converter Reactive Power Absorption

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing methods for black start of offshore wind farms face oversizing issues with diesel generators, underutilization of external generators, reactive power overshoot, lengthy completion cycles, and excessive fuel consumption for auxiliary load supply.

Innovation Solution

A method for coordinating control of wind farms during black start by selecting conductors for connecting external generators to wind turbine converters, optimizing reactive power absorption, and operating within power limit curves to fully utilize generator capacity, reducing fuel consumption, and stabilizing voltage and frequency.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If diesel generator sets are used to supply auxiliary loads during black start, then emergency power supply is ensured, but the diesel generator becomes oversized due to needing to absorb charging power from cable array

Engineering Contradiction:
Improveemergency power supplyVSAvoiddiesel generator capacity
Core Design Contradiction:
ReliabilityVSQuantity of substance

Solution Approach 1:

The patent divides the reactive power absorption function between two components: the diesel generator handles active power supply to auxiliary loads, while wind turbine converters handle reactive power absorption from the cable array. This segmentation allows each component to be properly sized for its specific function, eliminating the oversizing problem.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The wind turbine converters are made multi-functional by having them perform both their normal power conversion function and the additional function of absorbing reactive power from the cable array during black start, thereby eliminating the need for the diesel generator to be oversized for reactive power absorption.

Inventive Principle:
Principle #6Universality (Multi-functionality)

2Quantity of substance

If wind turbine converters are used to absorb reactive power from cable system, then diesel generator sizing is optimized, but the black start completion cycle becomes relatively long

Engineering Contradiction:
Improvediesel generator capacityVSAvoidblack start completion time
Core Design Contradiction:
Quantity of substanceVSLoss of time

Solution Approach 1:

The patent applies preliminary action by pre-charging the cable array through the wind turbine converter before connecting to the diesel generator. This preliminary charging action prepares the system in advance, enabling faster synchronization and reducing the overall black start completion time.

Inventive Principle:
Principle #10Preliminary action

3Reliability

If external generator supplies active power to auxiliary load, then power supply is ensured, but fuel consumption increases

Engineering Contradiction:
Improvepower supplyVSAvoidfuel consumption
Core Design Contradiction:
ReliabilityVSLoss of energy

Solution Approach 1:

The patent changes the operating parameters of the external generator by operating it in the operation region around the power limit curve rather than at fixed ratings. This parameter optimization allows the generator to supply the same active power to auxiliary loads while minimizing fuel consumption through more efficient operating points.

Inventive Principle:
Principle #35Parameter changes

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

Ensures full utilization of external generator capacity, prevents reactive power overshoot, reduces completion time, and minimizes fuel consumption while maintaining system stability.

Implementation Method 1

the charging power (capacitive reactive power) from the cable array still needs to be absorbed by the diesel generator

Methodology Applied
Scientific EffectReactive power absorption: Capacitance

Data Source

PatentEP3215735B1Method for coordinating control of wind farm during a black start of an islanding operation
Publication Date: 2025.07.02 HITACHI ENERGY LTD
  • EP3215735B1 patent drawingFigure 1
  • EP3215735B1 patent drawingFigure 2
  • EP3215735B1 patent drawingFigure 3

AI summary

A method for coordinating control of a wind farm (1) during black start of islanding operation, including: selecting a conductor in the wind farm (1) via which the external generator (9) is electrically connectable to auxiliary equipment of at least one wind turbine(10-15, 20-25, 30-35) of the wind farm (1) to deliver the active power to the auxiliary equipment of the wind turbine (10-15, 20-25, 30-35), wherein the selected conductor is electrically connectable to a converter (101-151, 201-251, 301-351) of the wind turbine (10-15, 20-25, 30-35); and choosing at least one of the wind turbines (10-15, 20-25, 30-35), wherein a converter (101-151, 201-251, 301-351) of the chosen wind turbine (10) can absorb a portion of an amount of reactive power generated by the selected conductor when voltage is applied between at least two parts of the selected conductor; operating an external generator (9) in an operation region around power limit curve to output energy; electrically connecting the output of the external generator (9) and the auxiliary equipment of the wind turbine (10-15, 20-25, 30-35) via the selected conductor; electrically connecting the output of the external generator (9) and the chosen wind turbine (10-15, 20-25, 30-35) converter via the selected conductor; and absorbing by the external generator (9) and the chosen wind turbine (10-15, 20-25, 30-35) converter (101-151, 201-251, 301-351) the reactive power generated by the selected conductor so that an operation point of the external generator (9) is kept within the operation region around the power limit curve. By having the method,the external generator's available capacity can be fully utilized.