Wind Turbine Tower Segment Pre-Attachment Method

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

The installation of wind turbines is time-consuming and requires a large weather window, especially for offshore turbines, due to the need for individual lifting and placement of secondary components using cranes.

Innovation Solution

A method where secondary components are pre-attached to tower segments before lifting, allowing the components and tower segments to be lifted together in a single step, and then moved to their final positions after the tower is erected.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Manufacturing precision

If secondary components are installed individually using a crane after tower erection, then each component can be precisely placed, but the installation time increases significantly and weather window requirements expand

Engineering Contradiction:
Improvecomponent placement precisionVSAvoidinstallation time
Core Design Contradiction:
Manufacturing precisionVSLoss of time

Solution Approach 1:

The patent applies preliminary action by pre-attaching secondary components to tower segments before the lifting operation. This allows components to be positioned in advance on the tower segment at the manufacturing site or preparation area, so that when the tower segment is lifted as a complete assembly, components are already in their correct relative positions, eliminating time-consuming on-site installation operations.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent merges the tower segment with secondary components into a single integrated assembly. By attaching components directly to the tower segment structure before lifting, the components become part of the load being lifted by the crane. This combining approach allows simultaneous transport of multiple components with the tower segment, reducing the number of separate lifting operations required.

Inventive Principle:
Principle #5Merging (Combining)

2Manufacturing precision

If multiple individual lifting operations are performed for tower segments and components, then precise placement is achieved, but the number of operations increases and installation efficiency decreases

Engineering Contradiction:
Improvecomponent placement precisionVSAvoidinstallation efficiency
Core Design Contradiction:
Manufacturing precisionVSProductivity

Solution Approach 1:

The patent merges the tower segment with secondary components into a single integrated assembly. By attaching components directly to the tower segment structure before lifting, the components become part of the load being lifted by the crane. This combining approach allows simultaneous transport of multiple components with the tower segment, reducing the number of separate lifting operations required.

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The patent applies preliminary action by pre-attaching secondary components to tower segments before the lifting operation. This allows components to be positioned in advance on the tower segment at the manufacturing site or preparation area, so that when the tower segment is lifted as a complete assembly, components are already in their correct relative positions, eliminating time-consuming on-site installation operations.

Inventive Principle:
Principle #10Preliminary action

3Loss of time

If components are pre-assembled with tower segments onshore, then offshore installation time is reduced, but additional handling and transportation logistics are required

Engineering Contradiction:
Improveoffshore installation timeVSAvoidhandling logistics
Core Design Contradiction:
Loss of timeVSDevice complexity

Solution Approach 1:

The patent applies preliminary action by pre-attaching secondary components to tower segments before the lifting operation. This allows components to be positioned in advance on the tower segment at the manufacturing site or preparation area, so that when the tower segment is lifted as a complete assembly, components are already in their correct relative positions, eliminating time-consuming on-site installation operations.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentEP4402366B1Method for the arrangement of at least one component during the installation of a wind turbine
Publication Date: 2025.06.04 SIEMENS GAMESA RENEWABLE ENERGY AS
  • EP4402366B1 patent drawingFigure 1
  • EP4402366B1 patent drawingFigure 2
  • EP4402366B1 patent drawingFigure 3

AI summary

Method for the arrangement of at least one component (9) during the installation of a wind turbine (1), wherein the component (9) is releasably attached to a tower segment (2) prior to a coupling of the tower segment (2) to a tower segment support structure (3), wherein the tower segment (2) forms at least a section of a tower of the wind turbine (1) to be installed and wherein the component (9) is attached to an attachment area (13, 21) at the outer surface (12) of the tower segment (2), wherein the component (9) is moved from the attachment area (13) to an arrangement position (15, 30) after coupling of the tower segment (2) to the tower segment support structure (3).