Window Frame Element Tracking System for Vinyl Manufacturing

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

The manufacturing of vinyl window frames is hindered by idle time, defects during welding, and employee absenteeism, particularly due to the complexity of handling and aligning extrusions in tight spaces and the dependence on employee presence across multiple workstations.

Innovation Solution

A computerized system that tracks and manages the sequence, placement, and presentation of window frame elements using a cart with boxes associated with a database, generating machine and operator instructions for cutting, machining, and welding, allowing for efficient handling and minimizing human error, and enabling independent operation of workstations.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If manual handling and alignment of extrusions is used in tight spaces, then flexibility in operation is maintained, but idle time increases and productivity decreases

Engineering Contradiction:
Improveproduction outputVSAvoididle time
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The patent replaces manual mechanical handling and alignment operations with an automated computerized system that tracks frame elements and provides real-time instructions to machines and operators. This substitution eliminates idle time associated with manual searching, measuring, and aligning of extrusions in tight spaces, thereby increasing productivity without sacrificing operational flexibility.

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

Solution Approach 2:

The system enables self-service by providing automated tracking and instruction generation for each frame element. The computer system automatically monitors the location and status of extrusions, generates appropriate machine instructions, and guides operators through the machining process, reducing dependence on employee presence and minimizing idle time between operations.

Inventive Principle:
Principle #25Self-service

2Manufacturing precision

If frequent measurements and extensive knowledge are required for quality verification, then manufacturing precision is maintained, but operation complexity increases

Engineering Contradiction:
Improvedimensional accuracyVSAvoidprocess complexity
Core Design Contradiction:
Manufacturing precisionVSDevice complexity

Solution Approach 1:

The patent implements a feedback mechanism where the computer system continuously tracks frame elements and provides real-time instructions for quality verification. The system automatically generates instructions based on the current state of each element, reducing the need for operators to perform frequent manual measurements while maintaining precision through automated guidance and monitoring.

Inventive Principle:
Principle #23Feedback

Solution Approach 2:

The computerized tracking and instruction system acts as an intermediary between the complex requirements for precision manufacturing and the operators. It translates dimensional specifications and quality requirements into simple, step-by-step instructions, reducing the operational complexity while maintaining the necessary manufacturing precision through automated calculation and guidance.

Inventive Principle:
Principle #24Intermediary (Mediator)

3Adaptability or versatility

If twin head welding machines are used without considering melt factors, then equipment versatility is maintained, but welding quality deteriorates

Engineering Contradiction:
Improvemachine capabilityVSAvoidjoint squareness
Core Design Contradiction:
Adaptability or versatilityVSManufacturing precision

Solution Approach 1:

The patent applies local quality by tailoring welding parameters to each specific joint and extrusion size. The computer system tracks each frame element and generates welding instructions that account for the specific melt factors of that element, ensuring optimal welding quality for each local condition while using the same twin head welding machine. This allows the machine to handle various extrusion sizes (versatility) while maintaining precise joint quality for each specific case.

Inventive Principle:
Principle #3Local quality

4Ease of operation

If workers search for and transport frame elements manually, then operational flexibility is maintained, but loss of time increases

Engineering Contradiction:
Improvehandling convenienceVSAvoidwalking time
Core Design Contradiction:
Ease of operationVSLoss of time

Solution Approach 1:

The patent replaces manual searching and transporting of frame elements with an automated computerized tracking system. The system automatically locates required elements and provides navigation instructions to operators, eliminating the time workers spend walking and searching while maintaining ease of operation through simplified, instruction-based handling procedures.

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

Data Source

PatentUS9342633B2System and method for manufacturing window frames
Publication Date: 2016.05.17 HACHE JOSEPH FRANCOIS
  • US9342633B2 patent drawing
  • US9342633B2 patent drawing
  • US9342633B2 patent drawing

AI summary

An array of boxes in one or more carts is closely associated with addresses in a database of a computer. This computer-box association is used to keep track of the sequence, placement and presentation of each window frame element to each workstation. This association is maintained until these frame elements are assembled into rectangular window frames. Then, individual window frames are tracked into other workstations using bar code labels. Temporary storage of frame elements between workstations constitute work banks to each workstation. In another aspect, the lengths of frame elements are adjusted to compensate for the melt factor of the specific welding head in which a joint will be made.