Worksite Information Management System with Segmented Task Interfaces

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing worksite information management systems face challenges in effectively communicating and updating task information across different user interfaces, such as worker, trade, and builder interfaces, leading to inefficiencies in scheduling and tracking of jobs and inspections.

Innovation Solution

A worksite information management system that includes a server application capable of receiving and updating task blocks, generating updated tasks, and presenting them to various interfaces, enabling real-time reporting, automated scheduling, and seamless connectivity among entities, with features like just-in-time material delivery and integrated alerts.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Adaptability or versatility

If a worksite information management system tracks and processes information about worksites, tasks, and milestones, then the system provides comprehensive project management capabilities, but the system faces challenges in effectively communicating relevant information to different types of users (workers, supervisors, builders, inspectors)

Engineering Contradiction:
Improveinformation communication adaptabilityVSAvoidsystem complexity
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

The system divides information communication into separate, specialized interfaces for different user roles (worker interface, supervisor interface, builder interface, inspector interface). Each interface is segmented to display only the specific task information and controls relevant to that user type, resolving the contradiction by adapting information presentation to each user group while maintaining a unified underlying task management system.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The task management system serves multiple user types and functions through a universal core architecture. The same task database and management logic serve workers, supervisors, builders, and inspectors, each accessing through their specialized interface. This universal core reduces overall system complexity while maintaining high adaptability to different user needs.

Inventive Principle:
Principle #6Universality (Multi-functionality)

2Productivity

If the system creates, schedules, and tracks tasks and milestones across multiple interfaces, then the system provides comprehensive project management, but inefficiencies occur in scheduling and tracking of jobs and inspections

Engineering Contradiction:
Improvescheduling and tracking efficiencyVSAvoidtime for scheduling and tracking
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The system performs preliminary actions by automatically generating task blocks from selected tasks and milestones before user execution. When a user selects a task block, the system pre-configures the task details, scheduling parameters, and tracking structures in advance, eliminating the need for manual setup during execution and significantly improving scheduling and tracking efficiency.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system implements self-service scheduling and tracking through automated task block generation and update propagation. Once a task is created or updated in one interface, the system automatically updates the task block and propagates changes to all relevant interfaces without requiring manual intervention from supervisors or coordinators, reducing time loss while maintaining comprehensive project management.

Inventive Principle:
Principle #25Self-service

Data Source

PatentUS11481702B1Worksite information management system
Publication Date: 2022.10.25 MIVIEW INTEGRATED SOLUTIONS LLC
  • US11481702B1 patent drawing
  • US11481702B1 patent drawing
  • US11481702B1 patent drawing

AI summary

A method implements a worksite information management system. A selection that includes a task block is received. A task corresponding to a worksite is updated to include the task block. The task is presented to one of a worker interface, a trade interface, and a builder interface. An update to the task block is received. The task is updated using the update to generate an updated task. The updated task is presented to one of the trade interface and the builder interface.