Photovoltaic ground pile nut welding equipment
By designing a nut welding equipment for photovoltaic floor piles, the problems of high labor intensity and nut vulnerability in the nut welding process in the prior art are solved, accurate positioning and efficient welding of photovoltaic floor piles are achieved, and the overall quality and automation of the product are improved.
Patent Information
- Application Number
- CN202510130109.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-05
- Publication Date
- 2025-04-08
AI Technical Summary
In the existing photovoltaic floor pile manufacturing process, the nut welding process has high labor intensity and low production efficiency, and the welded nuts are easily damaged during the subsequent processing, affecting the overall quality of the photovoltaic floor piles.
A photovoltaic floor pile nut welding equipment is designed, including a floor pile pipe loading unit, a nut feeding unit, a floor pile pipe positioning clamping unit and a nut welding unit. The floor pile pipe is accurately positioned and clamped through the positioning clamping unit, and the nut welding unit is used for ring welding to ensure the stability and welding quality of the nut.
The accurate positioning and nut welding of the formed pointed cone portion and drilled through holes is realized, reducing the possibility of nut deformation and loose welding points, and improving the overall quality and automation of photovoltaic floor piles.