A geothermal well group intelligent reinjection control method

By setting up an intelligent recirculation control system in the geothermal well system and using the controller to adjust the operating frequency and quantity of the pumps, the problem of reduced recirculation volume due to clogging of the geothermal well is solved, and the stability and efficiency of the system are improved.

CN112378107BActive Publication Date: 2024-10-15CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202011080048.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-10-10
Publication Date
2024-10-15
Estimated Expiration
2040-10-10

AI Technical Summary

Technical Problem

In the geothermal well system, some geothermal wells have reduced recirculation volume due to blockage or other reasons, which increases system pump consumption and affects the operational stability of the entire geothermal well group.

Method used

Design an intelligent recharge control system for geothermal well groups. By setting up multiple geothermal wells, water collectors, plate heat exchangers, water distributors and heat pump hosts, each geothermal well is equipped with a water intake pump and a recharge pump, using a controller. Adjust the operating frequency and quantity of pumps based on energy load and real-time flow, pressure, and conductivity data to ensure effective recharge of geothermal water.

Benefits of technology

It achieves accurate detection and adjustment of the water output of geothermal wells, saves system pump consumption, and improves the operating efficiency and stability of the geothermal well group.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112378107B_ABST
    Figure CN112378107B_ABST
Patent Text Reader

Abstract

The present invention provides an intelligent reinjection control method for a geothermal well group, comprising a plurality of geothermal wells, a water collector, a plate heat exchanger, a water distributor and a heat pump main unit, wherein a water intake pump is arranged in each geothermal well, the water outlet ends of the plurality of water intake pumps are respectively connected with the water inlet end of the water collector through pipelines, the water outlet end of the water collector is connected with the water inlet end of the water distributor through a plate heat exchanger, and the plate heat exchanger is connected with the heat pump main unit; a plurality of reinjection pumps are arranged at the water outlet end of the water distributor, the reinjection pumps are arranged in one-to-one correspondence with the plurality of geothermal wells, and a balancing pipe is arranged between the water distributor and the water collector; the water outlet end of each reinjection pump is connected with the corresponding geothermal well through a pipeline; the water outlet end of each water intake pump is provided with a first flowmeter and a conductivity meter; the water outlet end of each reinjection pump is provided with a pressure gauge and a second flowmeter; and a third flowmeter is arranged on the balancing pipe.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of geothermal energy utilization in a ground source heat pump system, and in particular relates to an intelligent reinjection control method for a geothermal well group. Background Art

[0002] The ground source heat pump system is a geothermal energy system that transfers low-grade heat energy to high-grade heat energy by inputting a small amount of high-grade energy (such as electricity). Geothermal energy is a pollution-free, renewable clean energy. Rivers, lakes and seas belong to the category of shallow geothermal energy. Compared with traditional fossil energy such as coal, oil and natural gas, it has the advantages of huge quantity, renewable, low carbon, environmental protection and local use. Geothermal energy has now been widely used in many fields such as heating, power generation, refrigeration, drying, chemical industry, planting and breeding, real estate development, tourism, convalescence and health care, and has shown an increasingly broad application prospect. It has been included in the national medium- and long-term development plan for renewable energy.

[0003] In the current design of geothermal well systems, water intake pumps with reinjection functions are mostly used. During the operation of the geothermal well group, if the reinjection volume of some geothermal wells decreases due to blockage or other reasons, the system pump consumption will increase, and ultimately affect the operational stability of the entire geothermal well group system. Summary of the invention

[0004] The purpose of the present invention is to solve the deficiencies of the above-mentioned background technology and to provide a method for intelligent reinjection control of a geothermal well group.

[0005] The technical solution adopted by the present invention is: an intelligent reinjection control system for a geothermal well group, characterized in that it includes multiple geothermal wells, a water collector, a plate heat exchanger, a water distributor and a heat pump host, each geothermal well is provided with a water intake pump, the water outlet ends of the multiple water intake pumps are respectively connected to the water inlet end of the water collector through pipelines, the water outlet end of the water collector is connected to the water inlet end of the water distributor through a plate heat exchanger, and the plate heat exchanger is connected to the heat pump host; the water outlet end of the water distributor is provided with multiple reinjection pumps, the reinjection pumps are arranged one-to-one with the multiple geothermal wells, and the water outlet end of each reinjection pump is connected to the corresponding geothermal well through a pipeline; the water distributor and the water collector are connected to the water outlet end of the water distributor. A balancing pipe is arranged in between; the geothermal water outlets of each water intake pump are respectively collected in the water collector, and the geothermal water entering the water collector is heat exchanged through the plate heat exchanger to provide cold and heat sources for the heat pump main unit, and the geothermal water after heat exchange enters the water distributor and is recharged to the corresponding geothermal wells by the reinjection pumps; the water outlet end of each water intake pump is provided with a first flow meter and a conductivity meter; the water outlet end of each reinjection pump is provided with a pressure gauge and a second flow meter; a third flow meter is arranged on the balancing pipe; the controller drives the working state of each water intake pump and each reinjection pump according to the required water intake and the measurement data of the first flow meter, the conductivity meter pressure gauge, the second flow meter and the third flow meter.

[0006] In the above technical solution, the total amount of water intake is calculated according to the energy load, so as to select the number of water intake pumps to be started; and the number of recharging pumps to be started is selected according to the total amount of water intake.

[0007] In the above technical scheme, there are n geothermal wells, n water intake pumps, and n recharging pumps, and the geothermal wells, water intake pumps, and recharging pumps are all arranged in a one-to-one correspondence; if the 1st to i-th water intake pumps are selected to be turned on according to the total amount of water intake to extract geothermal water in the 1st to i-th geothermal wells, then the i+1st to k-th recharging pumps are selected to be turned on to recharge the geothermal water to the j+1st to k-th geothermal wells respectively; wherein n, j, and k are all integers greater than 0, and j, k <n。

[0008] In the above technical solution, the controller determines the total water intake on the ground source side according to the running energy load, and calculates the number of water intake pumps and the number of recharging pumps that need to be operated in the initial state according to the total water intake; calculates the number of water intake pumps and the number of recharging pumps that need to be operated in the initial state; obtains the initial flow rate and actual flow rate of the outlet pipe of the i-th running water intake pump and recharging pump, and the operating frequency of the corresponding i-th running water intake pump and recharging pump; Get the actual value, minimum value and maximum value of the operating frequency of the ith water intake pump and recharge pump in operation; set the delay time after the outlet pressure of the ith recharge pump exceeds the set value, the delay time after the operating frequency is too high or too low, and the delay time after the total flow of the outlet pipes of each running water intake pump and recharge pump is lower than the total water intake flow; get the set value and actual value of the initial conductivity of the outlet pipe of the ith water intake pump, and the set value and actual value of the initial pressure of the outlet pipe of the ith recharge pump; calculate the flow rate that needs to be increased by other running water intake pumps or recharge pumps due to the jth water intake pump running at a reduced frequency due to excessive cement sand content in the geothermal well or the recharge pump running at a reduced frequency due to well blockage, and get the initial flow rate and actual flow rate of the outlet pipe of the jth water intake pump and recharge pump.

[0009] A control method based on a geothermal well group intelligent recharge control system, characterized by comprising the following steps:

[0010] a. The controller determines that the conductivity of the outlet pipe of the jth operating water intake pump is low and the pressure of the outlet pipe of the recharging pump is too high, and alarms;

[0011] b. The controller determines whether the actual value of the initial conductivity of the outlet pipe of the i-th water intake pump is less than or equal to the set value and the delay time after the outlet pressure of the i-th water intake pump exceeds the set value;

[0012] c. If the controller determines in step b that it is yes, then the operating frequency of the i-th water intake pump is adjusted according to the actual value and the set value of the initial conductivity of the outlet pipe of the i-th water intake pump, and based on the actual operating frequency of the i-th water intake pump and the actual total flow of the running water intake pump, whether to deactivate the i-th water intake pump and start the standby water intake pump is selected;

[0013] d. If the controller determines in step b that it is no, then the operating frequency of the i-th water intake pump is adjusted according to the actual value of the initial flow rate of the outlet pipe of the i-th water intake pump and the initial flow rate and actual flow rate of the outlet pipe of the j-th water intake pump, and based on the actual operating frequency of the i-th water intake pump and the actual total flow rate of the running water intake pump, whether to enable the maximum frequency state of the i-th water intake pump and start the standby water intake pump is selected;

[0014] e. The controller determines whether the actual value of the initial pressure of the outlet pipe of the i-th recharging pump is greater than the set value and the delay time after the outlet pressure of the i-th recharging pump exceeds the set value;

[0015] f. If the controller determines in step e that it is yes, it adjusts the operating frequency of the i-th recharging pump according to the actual value and the set value of the initial pressure of the outlet pipe of the i-th recharging pump, and selects whether to deactivate the i-th recharging pump and start the standby recharging pump based on the actual operating frequency of the i-th recharging pump and the actual total flow of the running water intake pump;

[0016] g. If the controller judges as no in step e, the operating frequency of the i-th recharge pump is adjusted according to the initial flow rate of the outlet pipe of the i-th recharge pump and the initial flow rate and actual flow rate of the outlet pipe of the j-th recharge pump, and based on the actual operating frequency of the i-th recharge pump and the actual total flow rate of the running water intake pump, whether to enable the maximum frequency state of the i-th recharge pump and start the standby recharge pump is selected.

[0017] In the above technical solution, step c specifically includes the following steps:

[0018] C1: The controller adjusts the actual operating frequency of the i-th water intake pump according to the difference between the set value and the actual value of the initial conductivity of the outlet pipe of the i-th water intake pump, and receives in real time the actual value of the initial conductivity of the outlet pipe of the i-th water intake pump after adjustment;

[0019] C2: If the actual value of the operating frequency of the ith water pump is less than or equal to the minimum operating frequency of the ith water pump and the delay time after the operating frequency of the ith water pump is too high or too low, stop the ith water pump; if the above conditions are not met, continue to repeat step C1;

[0020] C3: After stopping the i-th water intake pump, determine whether the actual total flow rate of the running water intake pumps is less than the total water intake on the ground source side and delay the total flow rate of the outlet pipes of each running water intake pump to be lower than the total water intake flow rate; if it is judged to be yes, start a spare water intake pump, if it is judged to be no, end the control process.

[0021] In the above technical solution, step d specifically includes the following steps:

[0022] D1: The controller adjusts the actual operating frequency of the i-th water intake pump according to the set value and real-time detection value of the initial flow rate of the outlet pipe of the i-th water intake pump and the increased flow rate of other running water intake pumps due to the failure of the j-th water intake pump, and receives the real-time detection value of the flow rate of the outlet pipe of the i-th water intake pump after adjustment in real time;

[0023] D2: If the actual value of the operating frequency of the i-th water pump is greater than or equal to the maximum operating frequency of the i-th water pump and the delay time after the operating frequency of the i-th water pump is too high or too low, the i-th water pump is operated at maximum power; if the above conditions are not met, continue to repeat step D1;

[0024] D3: After running the i-th water pump at maximum power, determine whether the actual total flow of the running water pumps is less than the total water intake on the ground source side and delay the total flow of the outlet pipes of each running water pump to be lower than the total water intake flow; if it is judged to be yes, start a spare water pump, if it is judged to be no, end the control process.

[0025] In the above technical solution, step f specifically includes the following steps:

[0026] F1: The controller adjusts the actual operating frequency of the i-th recharging pump according to the difference between the set value and the actual value of the initial pressure of the outlet pipe of the i-th recharging pump, and receives in real time the actual value of the initial pressure of the outlet pipe of the i-th recharging pump after adjustment;

[0027] F2: If the actual value of the operating frequency of the i-th recharge pump is less than or equal to the minimum operating frequency of the i-th recharge pump and the operating frequency of the i-th recharge pump is too high or too low, the i-th recharge pump is stopped after the delay time; if the above conditions are not met, step F1 is repeated;

[0028] F3: After stopping the i-th recharge pump, determine whether the actual total flow of the running recharge pumps is less than the total water intake on the ground source side and delay the total flow of the outlet pipes of each running recharge pump to be lower than the total recharge flow; if it is judged to be yes, start a spare recharge pump, if it is judged to be no, end the control process.

[0029] In the above technical solution, step g specifically includes the following steps:

[0030] G1: The controller adjusts the actual operating frequency of the i-th recharging pump according to the set value and real-time detection value of the initial flow rate of the outlet pipe of the i-th recharging pump and the flow rate of other recharging pumps required to be increased due to the failure of the j-th recharging pump, and receives the real-time detection value of the flow rate of the outlet pipe of the i-th recharging pump after adjustment in real time;

[0031] G2: If the actual value of the operating frequency of the i-th recharge pump is greater than or equal to the maximum operating frequency of the i-th recharge pump and the delay time after the i-th recharge pump operating frequency is too high or too low, the i-th recharge pump is operated at maximum power; if the above conditions are not met, continue to repeat step G1;

[0032] G3: After running the i-th recharge pump at maximum power, determine whether the actual total flow of the running recharge pump is less than the total water intake on the ground source side and delay the total flow of the outlet pipes of each running recharge pump to be lower than the total recharge flow; if it is judged to be yes, start a spare recharge pump, if it is judged to be no, end the control process.

[0033] The beneficial effects of the present invention are that the water intake pump and the recharge pump are independently arranged, the water intake pump outlet is provided with a flow meter and a conductivity meter, and the recharge pump outlet is provided with a pressure sensor and a flow meter, which can detect the water intake and recharge status in real time, so as to accurately adjust the water output of the geothermal well according to the water output parameters, and automatically set the appropriate recharge water volume according to the recharge capacity of each recharge well, thereby saving system pump consumption and achieving high efficiency and energy saving. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 It is a structural schematic diagram of the present invention.

[0035] Among them, 1: water distributor; 2: water collector; 3: plate heat exchanger; 4.1~4.i: reinjection pump; 5.1~5.i: first flow meter; 6.1~6.i: geothermal well; 7.1~7.i: conductivity meter; 8.1~8.i: water intake pump; 9.1~9.i: pressure gauge; 10.1~10.i: second flow meter; 11: balance pipe; 12: third flow meter.

[0036] Figure 2 This is the flow chart of water pump control;

[0037] Figure 3 This is the block diagram of water pump control logic 1;

[0038] Figure 4 This is the block diagram of water pump control logic 2;

[0039] Among them, F 总 is the total water intake from the ground source side (m 3 / h);

[0040] F q额 is the rated flow rate of the water intake pump (m 3 / h);

[0041] F h额 is the rated flow rate of the recharging pump (m 3 / h);

[0042] F qyxis the actual total flow rate of the running water intake pump (m 3 / h);

[0043] F hyx is the actual total flow rate of the recharging pump in operation (m 3 / h);

[0044] F qi0 is the initial flow rate of the outlet pipe of the i-th water intake pump (m 3 / h);

[0045] F qi is the actual flow rate of the outlet pipe of the i-th water intake pump (m 3 / h);

[0046] △F qj is the flow rate (m) required for other running water intake pumps to increase after the j-th water intake pump is reduced in frequency due to excessive sediment 3 / h); F hi0 is the initial flow rate of the outlet pipe of the i-th reinjection pump (m 3 / h);

[0047] F hi is the actual flow rate of the outlet pipe of the i-th recharging pump (m 3 / h);

[0048] △F hj is the additional flow rate (m) required by other recharging pumps after the jth recharging pump is operated at a reduced frequency due to well blockage 3 / h);

[0049] F hj0 is the initial flow rate of the outlet pipe of the jth reinjection pump (m 3 / h);

[0050] F hj is the actual flow rate of the outlet pipe of the jth recharging pump (m 3 / h);

[0051] P hi0 is the initial pressure setting value of the outlet pipe of the i-th reinjection pump (MPa);

[0052] P hi is the actual value of the initial pressure of the outlet pipe of the i-th reinjection pump (MPa);

[0053] f himin is the minimum operating frequency of the i-th recharging pump (Hz);

[0054] f himax is the maximum operating frequency of the i-th recharging pump (Hz);

[0055] f hiis the actual value of the operating frequency of the i-th recharging pump (Hz);

[0056] f qimin is the minimum operating frequency of the i-th water intake pump (Hz);

[0057] f qimax is the maximum operating frequency of the i-th water intake pump (Hz);

[0058] f qi is the actual value of the operating frequency of the i-th water intake pump (Hz);

[0059] σ qi0 is the initial conductivity setting value of the outlet pipe of the i-th water intake pump (S / m);

[0060] σ qi is the actual value of the initial conductivity of the outlet pipe of the i-th water intake pump (S / m);

[0061] t hi0 is the delay time (s) after the outlet pressure of the i-th recharging pump exceeds the set value;

[0062] t hi1 is the delay time (s) after the operating frequency of the i-th recharging pump is too high or too low;

[0063] t hi 2 is the delay time after the total flow rate of the outlet pipe of each operating recharging pump is lower than the total water intake flow rate (s);

[0064] t qi0 is the delay time (s) after the outlet pressure of the i-th water intake pump exceeds the set value;

[0065] t qi1 is the delay time (s) after the operating frequency of the i-th water intake pump is too high or too low;

[0066] t qi2 It is the delay time (s) after the total flow rate of the outlet pipe of each operating water intake pump is lower than the total water intake flow rate;

[0067] Roundup is the round-up function;

[0068] n is the total number of water intake pumps and reinjection pumps respectively. DETAILED DESCRIPTION

[0069] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments to facilitate a clear understanding of the present invention, but they do not constitute a limitation on the present invention.

[0070] like Figure 1As shown, the present invention provides a geothermal well group intelligent reinjection control system, characterized in that it includes multiple geothermal wells 6, a water collector 2, a plate heat exchanger 3, a water distributor 1 and a heat pump host, each geothermal well 6 is provided with a water intake pump, the water outlet ends of multiple water intake pumps 9 are respectively connected to the water inlet end of the water collector 2 through pipelines, the water outlet end of the water collector 2 is connected to the water inlet end of the water distributor 1 through the plate heat exchanger 3, and the plate heat exchanger 3 is connected to the heat pump host; the water outlet end of the water distributor 1 is provided with multiple reinjection pumps 4, the reinjection pumps 4 are arranged one-to-one with the multiple geothermal wells 6, and the water outlet end of each reinjection pump 4 is connected to the corresponding geothermal well 6 through a pipeline; the water distributor 1 and the water collector 2 are connected to each other. A balance pipe 11 is provided; the geothermal water outlets of each water intake pump 9 are respectively collected in the water collector 2, and the geothermal water entering the water collector 2 is heat exchanged through the plate heat exchanger 3 to provide a cold and hot source for the heat pump main unit, and the geothermal water after heat exchange enters the water distributor 1 and is respectively recharged to the corresponding geothermal well 6 by the recharge pump 4; the water outlet end of each water intake pump 9 is provided with a first flow meter 5 and a conductivity meter 7; the water outlet end of each recharge pump 4 is provided with a pressure gauge 9 and a second flow meter 10; a third flow meter 12 is provided on the balance pipe 11; the controller drives the working state of each water intake pump and each recharge pump according to the required water intake and the measurement data of the first flow meter, the conductivity meter, the pressure gauge, the second flow meter and the third flow meter

[0071] The water intake pumps 8.1~8.i are variable frequency water pumps. The total amount of water intake is calculated according to the energy load, so the number of water intake pumps 8.1~8.i to be turned on is selected, and the water intake pumps 8.1-8.j are selected for operation. The water outlet is collected in the water collector 2. The water in the water collector 5 is heat exchanged through the plate heat exchanger 3 to provide a cold and heat source for the heat pump host. The geothermal water after heat exchange enters the water distributor 1. The outlet of the water distributor 1 is provided with a reinjection pump 4.1~4.i, and the reinjection pumps 4.1~4.i are variable frequency water pumps. The number of reinjection pumps 4.1~4.i to be turned on is selected according to the total amount of water intake, and 4.(J+1)~4.k is selected to ensure 100% reinjection. The geothermal water in the water collector 5 is reinjected into the corresponding geothermal wells 6.(J+1)~6.k by the reinjection pumps 4.(J+1)~4.k.

[0072] First, the controller determines the total water intake F on the ground source side according to the number of running hosts. 总 Then, use formula (1) and (2) to calculate the number of water pumps K that need to be operated in the initial state. q and the number of recharging pumps K h ,

[0073]

[0074] Among them, F q额 is the rated flow rate of the water intake pump (m 3 / h); F h额 is the rated flow rate of the recharging pump (m3 / h); Roundup is the rounding up function.

[0075] According to the obtained K q , K h , using formula (3) (4) can be calculated to obtain the initial flow setting value of the outlet pipe of the i-th running water intake pump and recharging pump (and should be adjusted in real time according to the operating status of other water pumps), the corresponding operating frequency of the i-th running water intake pump and recharging pump is:

[0076]

[0077] The flow balance adjustment algorithm module of the water intake pump and the recharging pump mainly uses formula (5) (6), △F qj is the flow rate (m) required for other running water intake pumps to increase after the j-th water intake pump is reduced in frequency due to excessive sediment 3 / h); △F hj is the additional flow rate (m) required by other recharging pumps after the jth recharging pump is operated at a reduced frequency due to well blockage 3 / h); F qi is the actual flow rate of the outlet pipe of the i-th (i=1,2,3…) water intake pump (m 3 / h); F hi is the actual flow rate of the outlet pipe of the i-th (i=1,2,3…) reinjection pump (m 3 / h); the actual flow rate of the outlet pipe of the water intake pump and the recharging pump is measured by the flow meter:

[0078]

[0079] The actual total flow rate of the water intake pump and the recharging pump currently in operation is (the number of pumps currently in operation, k = K q -1):

[0080]

[0081] Take the i-th (i≠j, i≤n, j≤n) normally operating water intake pump and reinjection pump as an example (refer to the control logic of this pump for other normally operating pumps). At the same time, assume that the conductivity of the outlet pipe of the i-th operating water intake pump is low and the pressure of the outlet pipe of the reinjection pump is too high and an alarm is issued (if other pumps have the same alarm signal, refer to the control logic of this pump).

[0082] A control method for a geothermal well group intelligent recharge control system, characterized by comprising the following steps:

[0083] a. The controller determines that the conductivity of the outlet pipe of the j-th running water intake pump is low and the pressure of the outlet pipe of the recharging pump is too high, and an alarm is sounded; after data initialization, the controller calculates and obtains the initial state information, rated state information and delayed state information of the water intake pump and the recharging pump.

[0084] b. The controller determines whether the actual value of the initial conductivity of the outlet pipe of the i-th water intake pump is less than or equal to the set value and the delay time t after the outlet pressure of the i-th water intake pump exceeds the set value qi0 ;

[0085] c. If the controller determines in step b that it is yes, the water intake pump operates according to control logic 1 based on the conductivity setting value. The operating frequency of the i-th water intake pump is adjusted according to the actual value and setting value of the initial conductivity of the outlet pipe of the i-th water intake pump, and based on the actual operating frequency of the i-th water intake pump and the actual total flow of the running water intake pump, it is selected whether to deactivate the i-th water intake pump and start the standby water intake pump;

[0086] d. If the controller determines in step b that it is no, the water intake pump operates according to control logic 2 based on the flow setting value. The operating frequency of the i-th water intake pump is adjusted according to the actual value of the initial flow of the outlet pipe of the i-th water intake pump and the initial flow and actual flow of the outlet pipe of the j-th water intake pump, and based on the actual operating frequency of the i-th water intake pump and the actual total flow of the running water intake pump, whether to enable the maximum frequency state of the i-th water intake pump and start the standby water intake pump is selected;

[0087] e. The controller determines whether the actual value of the initial pressure of the outlet pipe of the i-th recharging pump is greater than the set value and the delay time t after the outlet pressure of the i-th recharging pump exceeds the set value qi1 ;

[0088] f. If the controller determines in step e that it is yes, the recharging pump operates according to control logic 1 based on the pressure setting value, adjusts the operating frequency of the i-th recharging pump according to the actual value and setting value of the initial pressure of the outlet pipe of the i-th recharging pump, and selects whether to stop the i-th recharging pump and start the standby recharging pump based on the actual operating frequency of the i-th recharging pump and the actual total flow of the running water intake pump;

[0089] g. If the controller judges as no in step e, the recharge pump operates according to control logic 2 based on the flow setting value, and adjusts the operating frequency of the i-th recharge pump according to the initial flow of the outlet pipe of the i-th recharge pump and the initial flow and actual flow of the outlet pipe of the j-th recharge pump. Based on the actual operating frequency of the i-th recharge pump and the actual total flow of the running water intake pump, choose whether to enable the maximum frequency state of the i-th recharge pump and start the standby recharge pump.

[0090] In the above technical solution, step c specifically includes the following steps:

[0091] C1: The PID controller adjusts the actual operating frequency of the ith water intake pump according to the difference between the set value and the actual value of the initial conductivity of the outlet pipe of the ith water intake pump, and receives the actual value of the initial conductivity of the outlet pipe of the ith water intake pump after adjustment in real time, forming a closed-loop control process, such as Figure 3 As shown;

[0092] C2: If the actual value of the operating frequency of the ith water pump is less than or equal to the minimum value of the operating frequency of the ith water pump and the delay time after the operating frequency of the ith water pump is too high or too low, then stop the ith water pump; if the above conditions are not met, continue to repeat step C1;

[0093] C3: After stopping the i-th water intake pump, determine whether the actual total flow rate of the running water intake pumps is less than the total water intake on the ground source side and delay the total flow rate of the outlet pipes of each running water intake pump to be lower than the total water intake flow rate; if it is judged to be yes, start a spare water intake pump, if it is judged to be no, end the control process.

[0094] In the above technical solution, step d specifically includes the following steps:

[0095] D1: The controller adjusts the actual operating frequency of the i-th water intake pump according to the set value and real-time detection value of the initial flow of the outlet pipe of the i-th water intake pump and the increased flow of other running water intake pumps due to the failure of the j-th water intake pump (calculated by the flow balance adjustment algorithm, i.e., Formula 5), ​​and receives the real-time detection value of the flow of the outlet pipe of the i-th water intake pump after adjustment in real time, forming a closed-loop control process, such as Figure 4 As shown;

[0096] D2: If the actual value of the operating frequency of the i-th water pump is greater than or equal to the maximum operating frequency of the i-th water pump and the delay time after the operating frequency of the i-th water pump is too high or too low, the i-th water pump is operated at maximum power; if the above conditions are not met, continue to repeat step D1;

[0097] D3: After running the i-th water pump at maximum power, determine whether the actual total flow of the running water pumps is less than the total water intake on the ground source side and delay the total flow of the outlet pipes of each running water pump to be lower than the total water intake flow; if it is judged to be yes, start a spare water pump, if it is judged to be no, end the control process.

[0098] In the above technical solution, step f specifically includes the following steps:

[0099] F1: The controller adjusts the actual operating frequency of the i-th recharging pump according to the difference between the set value and the actual value of the initial pressure of the outlet pipe of the i-th recharging pump, and receives the actual value of the initial pressure of the outlet pipe of the i-th recharging pump after adjustment in real time, forming a closed-loop control process;

[0100] F2: If the actual value of the operating frequency of the i-th recharge pump is less than or equal to the minimum value of the operating frequency of the i-th recharge pump and the delay time after the operating frequency of the i-th recharge pump is too high or too low, the i-th recharge pump is stopped; if the above conditions are not met, step F1 is repeated;

[0101] F3: After stopping the i-th recharge pump, determine whether the actual total flow of the running recharge pump is less than the total water intake on the ground source side and delay the total flow of the outlet pipes of each running recharge pump to be lower than the total recharge flow; if it is judged to be yes, start a spare recharge pump, if it is judged to be no, end the control process.

[0102] In the above technical solution, step g specifically includes the following steps:

[0103] G1: The controller adjusts the actual operating frequency of the i-th recharging pump according to the set value and real-time detection value of the initial flow rate of the outlet pipe of the i-th recharging pump and the increased flow rate of other recharging pumps due to the failure of the j-th recharging pump (calculated by the flow balance adjustment algorithm, i.e., formula 6), and receives the real-time detection value of the flow rate of the outlet pipe of the i-th recharging pump after adjustment in real time, forming a closed-loop control process;

[0104] G2: If the actual value of the operating frequency of the i-th recharge pump is greater than or equal to the maximum operating frequency of the i-th recharge pump and the delay time after the i-th recharge pump operating frequency is too high or too low, the i-th recharge pump is operated at maximum power; if the above conditions are not met, continue to repeat step G1;

[0105] G3: After running the i-th recharging pump at maximum power, determine whether the actual total flow of the running recharging pump is less than the total water intake on the ground source side and delay the total flow of the outlet pipes of each running recharging pump to be lower than the total recharging flow; if it is judged to be yes, start a spare recharging pump, if it is judged to be no, end the control process

[0106] The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.

Claims

1. A method for intelligent reinjection control of geothermal well groups, Features ; Each geothermal well is provided with a water intake pump, and the water outlets of the multiple water intake pumps are connected to the water inlet of the water collector through pipelines. The water outlet of the water collector is connected to the water inlet of the water distributor through a plate heat exchanger, and the plate heat exchanger is connected to the heat pump host; the water outlet of the water distributor is provided with multiple reinjection pumps, and the reinjection pumps are arranged one-to-one with the multiple geothermal wells, and the water outlet of each reinjection pump is connected to the corresponding geothermal well through a pipeline; a balancing pipe is provided between the water distributor and the water collector; the geothermal water outlets of each water intake pump are respectively collected in the water collector, and the geothermal water entering the water collector is heat exchanged through the plate heat exchanger to provide a cold and heat source for the heat pump host, and the geothermal water after heat exchange enters the water distributor and is reinjected into the corresponding geothermal well by the reinjection pump; the water outlet of each water intake pump is provided with a first flow meter and a conductivity meter; a pressure gauge and a second flow meter are provided at the outlet end of each reinjection pump; a third flow meter is provided on the balance pipe; a controller drives the working state of each water intake pump and each reinjection pump according to the required water intake and the measurement data of the first flow meter, the conductivity meter pressure gauge, the second flow meter and the third flow meter; there are n geothermal wells, n water intake pumps and n reinjection pumps, and the geothermal wells, water intake pumps and reinjection pumps are all arranged in a one-to-one correspondence; if the 1st to i-th water intake pumps are selected to be turned on according to the total water intake amount to extract geothermal water from the 1st to i-th geothermal wells, then the i+1st to k-th reinjection pumps are selected to be turned on to reinject geothermal water to the j+1st to k-th geothermal wells respectively; wherein n, j, k are all integers greater than 0, and j, k <n; The controller determines the total water intake on the ground source side according to the operating energy load, and calculates the number of water intake pumps and the number of recharging pumps that need to be operated in the initial state according to the total water intake; calculates the number of water intake pumps and the number of recharging pumps that need to be operated in the initial state; obtains the initial flow rate and actual flow rate of the outlet pipe of the i-th operating water intake pump and recharging pump, as well as the operating frequency of the corresponding i-th operating water intake pump and recharging pump; Get the actual value, minimum value and maximum value of the operating frequency of the i-th water intake pump and recharging pump in operation; set the delay time after the outlet pressure of the i-th recharging pump exceeds the set value, the delay time after the operating frequency is too high or too low, and the delay time after the total flow of the outlet pipes of each running water intake pump and recharging pump is lower than the total water intake flow; get the initial conductivity setting value and actual value of the outlet pipe of the i-th water intake pump, and the initial pressure setting value and actual value of the outlet pipe of the i-th recharging pump; calculate the flow rate that needs to be increased by other running water intake pumps or recharging pumps after the j-th water intake pump is reduced in frequency due to excessive cement sand content in the geothermal well or the recharging pump is reduced in frequency due to well blockage, and get the initial flow rate and actual flow rate of the outlet pipe of the j-th water intake pump and recharging pump; The method comprises the following steps: a. The controller determines that the conductivity of the outlet pipe of the jth operating water intake pump is low and the pressure of the outlet pipe of the recharging pump is too high, and alarms; b. The controller determines whether the actual value of the initial conductivity of the outlet pipe of the i-th water intake pump is less than or equal to the set value and the delay time after the outlet pressure of the i-th water intake pump exceeds the set value; c. If the controller determines in step b that it is yes, then the operating frequency of the i-th water intake pump is adjusted according to the actual value and the set value of the initial conductivity of the outlet pipe of the i-th water intake pump, and based on the actual operating frequency of the i-th water intake pump and the actual total flow of the running water intake pump, whether to deactivate the i-th water intake pump and start the standby water intake pump is selected; d. If the controller determines in step b that it is no, then the operating frequency of the i-th water intake pump is adjusted according to the actual value of the initial flow rate of the outlet pipe of the i-th water intake pump and the initial flow rate and actual flow rate of the outlet pipe of the j-th water intake pump, and based on the actual operating frequency of the i-th water intake pump and the actual total flow rate of the running water intake pump, whether to enable the maximum frequency state of the i-th water intake pump and start the standby water intake pump is selected; e. The controller determines whether the actual value of the initial pressure of the outlet pipe of the i-th recharging pump is greater than the set value and the delay time after the outlet pressure of the i-th recharging pump exceeds the set value; f. If the controller determines in step e that it is yes, it adjusts the operating frequency of the i-th recharging pump according to the actual value and the set value of the initial pressure of the outlet pipe of the i-th recharging pump, and selects whether to deactivate the i-th recharging pump and start the standby recharging pump based on the actual operating frequency of the i-th recharging pump and the actual total flow of the running water intake pump; g. If the controller judges as no in step e, the operating frequency of the i-th recharge pump is adjusted according to the initial flow rate of the outlet pipe of the i-th recharge pump and the initial flow rate and actual flow rate of the outlet pipe of the j-th recharge pump, and based on the actual operating frequency of the i-th recharge pump and the actual total flow rate of the running water intake pump, whether to enable the maximum frequency state of the i-th recharge pump and start the standby recharge pump is selected.

2. According to claim 1, a geothermal well group intelligent reinjection control method, Features Step c specifically includes the following steps: C1: The controller adjusts the actual operating frequency of the i-th water intake pump according to the difference between the set value and the actual value of the initial conductivity of the outlet pipe of the i-th water intake pump, and receives in real time the actual value of the initial conductivity of the outlet pipe of the i-th water intake pump after adjustment; C2: If the actual value of the operating frequency of the ith water pump is less than or equal to the minimum operating frequency of the ith water pump and the delay time after the operating frequency of the ith water pump is too high or too low, stop the ith water pump; if the above conditions are not met, continue to repeat step C1; C3: After stopping the i-th water intake pump, determine whether the actual total flow rate of the running water intake pumps is less than the total water intake on the ground source side and delay the total flow rate of the outlet pipes of each running water intake pump to be lower than the total water intake flow rate; if it is judged to be yes, start a spare water intake pump, if it is judged to be no, end the control process.

3. According to claim 2, a geothermal well group intelligent reinjection control method, Features Step d specifically comprises the following steps: D1: The controller adjusts the actual operating frequency of the i-th water intake pump according to the set value and real-time detection value of the initial flow rate of the outlet pipe of the i-th water intake pump and the increased flow rate of other running water intake pumps due to the failure of the j-th water intake pump, and receives the real-time detection value of the flow rate of the outlet pipe of the i-th water intake pump after adjustment in real time; D2: If the actual value of the operating frequency of the i-th water pump is greater than or equal to the maximum operating frequency of the i-th water pump and the delay time after the operating frequency of the i-th water pump is too high or too low, the i-th water pump is operated at maximum power; if the above conditions are not met, continue to repeat step D1; D3: After running the i-th water pump at maximum power, determine whether the actual total flow of the running water pumps is less than the total water intake on the ground source side and delay the total flow of the outlet pipes of each running water pump to be lower than the total water intake flow; if it is judged to be yes, start a spare water pump, if it is judged to be no, end the control process.

4. A geothermal well group intelligent reinjection control method according to claim 3, Features Step f specifically comprises the following steps: F1: The controller adjusts the actual operating frequency of the i-th recharging pump according to the difference between the set value and the actual value of the initial pressure of the outlet pipe of the i-th recharging pump, and receives in real time the actual value of the initial pressure of the outlet pipe of the i-th recharging pump after adjustment; F2: If the actual value of the operating frequency of the i-th recharge pump is less than or equal to the minimum operating frequency of the i-th recharge pump and the operating frequency of the i-th recharge pump is too high or too low, the i-th recharge pump is stopped after the delay time; if the above conditions are not met, step F1 is repeated; F3: After stopping the i-th recharge pump, determine whether the actual total flow of the running recharge pumps is less than the total water intake on the ground source side and delay the total flow of the outlet pipes of each running recharge pump to be lower than the total recharge flow; if it is judged to be yes, start a spare recharge pump, if it is judged to be no, end the control process.

5. A geothermal well group intelligent reinjection control method according to claim 4, Features Step g specifically comprises the following steps: G1: The controller adjusts the actual operating frequency of the i-th recharging pump according to the set value and real-time detection value of the initial flow rate of the outlet pipe of the i-th recharging pump and the flow rate of other recharging pumps required to be increased due to the failure of the j-th recharging pump, and receives the real-time detection value of the flow rate of the outlet pipe of the i-th recharging pump after adjustment in real time; G2: If the actual value of the operating frequency of the i-th recharge pump is greater than or equal to the maximum operating frequency of the i-th recharge pump and the delay time after the i-th recharge pump operating frequency is too high or too low, the i-th recharge pump is operated at maximum power; if the above conditions are not met, continue to repeat step G1; G3: After running the i-th recharge pump at maximum power, determine whether the actual total flow of the running recharge pump is less than the total water intake on the ground source side and delay the total flow of the outlet pipes of each running recharge pump to be lower than the total recharge flow; if it is judged to be yes, start a spare recharge pump, if it is judged to be no, end the control process.

Citation Information

Patent Citations

  • Intelligent geothermal exploitation and reinjection system and method

    CN106123383A

  • Economic sandstone geothermal tail water recharging system

    CN203736974U

  • Full-closed vacuum negative pressure deep ground source heat pump system

    CN211424518U

  • Intelligent recharge control system for geothermal well group

    CN214172590U

  • Jet pump apparatus and methods for standing column well systems and deployment thereof

    US20200284475A1