A through power supply system for electrified railway
By using insulating joints and damping resistors in the through power supply system of electrified railways, combined with the control methods of circuit breakers and current transformers, the problem of arcing hazards and fault expansion during contact network faults has been solved, enabling rapid isolation and accurate identification, and improving power supply reliability and equipment lifespan.
Patent Information
- Application Number
- CN202110607237.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-06-01
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2041-06-01
AI Technical Summary
In electrified railways, when the overhead contact line fails after power supply is connected from both sides, the train may enter the powerless area, causing arcing hazards. Moreover, existing technologies are not able to effectively identify and isolate the fault, leading to an expansion of the power outage area and affecting the reliability of power supply and the lifespan of equipment.
By employing an insulated joint and damping resistor design, and through the control of circuit breakers and load switches, the fault section can be quickly isolated and the arc of damped current can be extinguished. Combined with the current transformer to determine the nature of the fault, appropriate reclosing operations can be performed to protect the equipment and reduce the generation of electric arcs.
It effectively limits overvoltage when trains enter de-energized areas, reduces arc generation, accurately identifies the nature of faults, shortens arc duration, prevents secondary impacts on equipment, and improves power supply reliability and equipment lifespan.
Smart Images

Figure CN113135125B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of AC electrified railway traction power supply. Background Art
[0002] In the current electrified railways, in order to distribute the single-phase traction load as evenly as possible in the three-phase power system, the traction network adopts a scheme of rotating phase sequence and phase-divided power supply. Insulating devices or insulating anchor sections are used to divide adjacent power supply areas at the phase-divided and divided areas to form electrical phase separation, also known as phase separation. Electrical phase separation is usually set at the exit of the traction substation and at the partition between two adjacent traction substations. Electrical phase separation is the weakest link and power supply bottleneck of the traction network. Electric trains passing through electrical phase separation are most likely to cause accidents, threatening power supply and driving safety.
[0003] There are two situations to cancel the phase separation of electricity: one is to adopt the same-phase power supply technology to cancel the phase separation at the outlet of the traction substation. The key is to effectively control the negative sequence current so that the three-phase voltage imbalance meets the national standard requirements; the second is to connect two adjacent traction substations and implement bilateral power supply to cancel the phase separation of the partition. At this time, the traction network and the power system are usually connected in parallel. The key is to reduce the balancing current (shunt, through power) generated in the traction network under this parallel mode to the allowed level.
[0004] Electrified railways use bilateral through-power supply, which can increase the distance between power supply arms, eliminate the need for phase separation, reduce power separation and no-power areas, and avoid train power loss and speed reduction caused by excessive phase separation, which is beneficial to ensuring the operating efficiency of the railway and can highlight the power supply capacity and technical advantages.
[0005] After adopting bilateral through-power supply, in order to ensure that the scope of power outage after the contact network fault is small and to facilitate the rapid detection and repair of the fault, the contact network needs to be divided into multiple sections to achieve segmented removal of traction network faults, so as to achieve the purpose of improving power supply reliability and flexibility. However, when a train enters the fault section from the non-fault section, its pantograph short-circuits the contact network of the non-fault section with the contact network of the fault section, causing the new train to enter the power-free area with load, resulting in arcing hazards. Summary of the invention
[0006] The object of the present invention is to provide an electrified railway through-power supply system, which can effectively solve the technical problems of limiting the overvoltage of trains entering the power-free zone and reducing the generation of arcs when a fault occurs in the contact network.
[0007] Another object of the present invention is to provide a control method for an electrified railway through-power supply system, which can effectively solve the technical problem of achieving segmented tripping and reducing arc generation through damping resistor operation when a fault occurs in the contact network.
[0008] The present invention solves the technical problem, and the technical solution adopted is: an electrified railway through-power supply system, including two adjacent same-phase power supply substations SS1 and SS2, which supply power to the contact wire T and the rail Rail respectively, and insulating joints FD1, FD2, FD4 are arranged in sections in the line to divide the contact wire T into three sections, which are recorded as contact wire T1, contact wire T2, and contact wire T3, forming three power supply sections Sect1, power supply section Sect2, and power supply section Sect3; at the position of the insulating joint FD2, the lower side of the circuit breaker DK21 is connected to the right end of the contact wire T1, the upper side of the circuit breaker DK21 is connected to the upper side of the circuit breaker DK22, and the lower side of DK22 is connected to the left end of the contact wire T2; during normal operation, the circuit breakers DK21 and DK22 are both closed, and the contact wire T1 is connected on the line. It is connected to the contact line T2 to form a short-circuited insulating joint FD2 branch; the left side of the load switch FK2 is connected to the lower side of the circuit breaker DK21, the right side of the load switch FK2 is connected to the left side of the damping resistor R2, and the right side of the damping resistor R2 is connected to the lower side of the circuit breaker DK22. During normal operation, the load switch FK2 is closed to form a damping branch, and the current transformer LH2 detects the damping branch current; the connection method of the short-circuited insulating joint branches and damping branches at the insulating joints FD1, FD3, and FD4 is the same as that at the insulating joint FD2; the upper side of the circuit breaker DK11 at the insulating joint FD1 is connected in parallel with the upper side of the circuit breaker DK12, and then connected to the power line a1 of the same-phase power supply substation SS1; the upper side of the circuit breaker DK41 at the insulating joint FD4 is connected in parallel with the upper side of the circuit breaker DK42, and then connected to the power line a2 of the same-phase power supply substation SS2.
[0009] The same-phase power supply substation SS1 and the same-phase power supply substation SS2 realize through power supply. When operating normally, the running train draws current from both sides of the two substations at the same time; when a short circuit fault occurs in a power supply section, the fault is removed in sections.
[0010] During normal operation, if the train runs from left to right and is at the end of the contact wire T1, if a short circuit fault occurs in the power supply section Sect2, the circuit breaker DK22 and the circuit breaker DK31 are disconnected, causing the contact wire T2 to be de-energized.
[0011] Another object of the present invention is achieved through the following technical solutions: A control method for an electrified railway through-power supply system, in which, when a short circuit fault occurs in power supply section Sect2, after circuit breakers DK22 and DK31 are disconnected, after the fault arc extinguishing time tx set by the time limit is reached, if the current I1 detected by current transformers LH2 and LH3 is less than 10A, it can be considered that the fault in power supply section Sect2 is a transient fault, and reclosing can be performed to reclose circuit breakers DK22 and DK31. DK31 is reclosed to restore power supply to contact line T2; on the contrary, when a short circuit occurs in power supply section Sect2, circuit breakers DK22 and DK31 are disconnected, and after the fault arc extinguishing time tx set within the time limit is reached, if the current I2 detected by current transformers LH2 and LH3 is greater than the set current Iset, the fault in power supply section Sect2 is considered to be a permanent fault, and reclosing is not performed. The fault arc extinguishing time tx is set in advance according to the line conditions, and the set current Iset is calculated based on the selection of the damping resistor.
[0012] The power supply section Sect2 has a permanent fault, and the circuit breakers DK22 and DK31 have been disconnected. If the current detected by the transformers LH2 and LH3 of the damping branches on both sides of the power supply section Sect2 is less than 10A on one side and greater than the set current Iset on the other side, it is considered that the contact line has a broken wire fault, a short circuit fault occurs on the side with large current, and a broken wire occurs on the side with small current.
[0013] It is determined that a permanent fault has occurred in the power supply section and has been reported to the dispatcher. In order to protect the damping resistor and repair the contact network, the load switch of the damping branch is disconnected.
[0014] The working principle of the present invention is: during normal operation, two adjacent same-phase power supply substations realize through power supply, and the running train draws current from both sides of the two substations at the same time; when a short-circuit fault occurs in a certain section, the fault is cut off in sections. For example, when the short-circuit fault k occurs in the power supply section Sect2, the circuit breaker DK22 and the circuit breaker DK31 are disconnected, causing the contact line T2 to be out of power, thereby minimizing the scope of the fault power outage.
[0015] When the train runs from left to right and is at the end of the contact wire T1, a short circuit fault occurs in the power supply section Sect2, and the circuit breakers DK22 and DK31 are disconnected, causing the contact wire T2 to lose power. At this time, the train is likely to carry load from the contact wire T1 in the energized area to the contact wire T2 in the de-energized area, generating an arc on the insulating joint FD2 and burning the contact wire. Due to the effect of the damping resistor R2, the overvoltage of the train entering the de-energized area will be greatly limited, reducing the possibility of arc generation; if an arc is generated, due to the shunting of the damping resistor R2 and the consumption of the arc power, the arc maintenance time will be greatly shortened, protecting the insulating joint FD2 and the contact wires T1 and T2.
[0016] When a short circuit fault occurs in the power supply section Sect2, after the circuit breaker DK22 and the contact wire DK31 are disconnected, after the time limit set fault arc extinguishing time tx, if the current I1 detected by the current transformer LH2 and the current transformer LH3 is very small (less than 10A), the fault in the power supply section Sect2 is considered to be a transient fault, and reclosing is performed to reclose the circuit breakers DK22 and DK31 to restore the power supply to the contact wire T2. Conversely, when a short circuit fault occurs in the power supply section Sect2, after the circuit breaker DK22 and the circuit breaker DK31 are disconnected, after the time limit set fault arc extinguishing time tx, if the current I2 detected by the current transformer LH2 and the current transformer LH3 is greater than the set current Iset, the fault in the power supply section Sect2 is considered to be a permanent fault, and reclosing is not performed, thereby reducing the secondary impact of the fault current on the circuit breaker, rails and contact wires, extending the service life of the equipment and preventing the expansion of the fault. The fault arc extinguishing time tx is set in advance according to the line conditions, and the set current Iset is calculated according to the selection of the damping resistor.
[0017] It is determined that a permanent fault has occurred in the power supply section Sect2 and the circuit breakers DK22 and DK31 have been disconnected. If the current transformers LH2 and LH3 on the damping branches on both sides of the power supply section Sect2 detect a very small current on one side and a current greater than the set current Iset on the other side, it is considered that the contact line has a broken wire fault, a short circuit fault has occurred on the side with large current, and a broken wire has occurred on the side with small current.
[0018] According to the above method, it is determined that a permanent fault has occurred in the section and has been reported to the dispatcher. In order to protect the damping resistor and repair the contact network, the load switch of the damping branch is disconnected. For example, if there is a permanent fault in the power supply section Sect2, the load switch FK2 at the insulating joint FD2 and the load switch FK3 at the insulating joint FD3 will be disconnected according to the remote dispatch command.
[0019] Compared with the prior art, the present invention has the following beneficial effects:
[0020] 1. Reduce the hidden danger of arcing caused by trains entering power-free areas with load, and avoid arcing, burning, or even burning of the contact network to cause accidents.
[0021] Second, it can timely and accurately discover, distinguish and isolate various contact network faults, while ensuring that fault-free sections continue to supply power and operate, thereby minimizing the scope of power outages, avoiding the expansion of the impact of faults, and further improving the reliability of traction network power supply.
[0022] 3. It can determine whether the fault is a permanent fault. In the case of a permanent fault, reclosing will not be performed, which can reduce the secondary impact of the fault current on the circuit breaker, rails and contact wires, extend the service life of the equipment and prevent the fault from expanding.
[0023] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 is a schematic diagram of an embodiment of the present invention.
[0025] Figure 2 It is a permanent fault identification flow chart of the present invention. DETAILED DESCRIPTION
[0026] Figure 1It is shown that a specific implementation of the present invention is: a through power supply system in which two adjacent same-phase power supply substations SS1 and SS2 supply power to the contact line T and the rail Rail, and insulating joints FD1, FD2, FD3 and FD4 are set on the contact line to divide the contact line T into three sections, which are recorded as contact line T1, contact line T2 and contact line T3, forming three power supply sections Sect1, Sect2 and Sect3. At the position of the insulating joint FD2, the lower side of the circuit breaker DK21 is connected to the right end of the contact line T1, the upper side of the circuit breaker DK21 is connected to the upper side of the circuit breaker DK22, and the lower side of the circuit breaker DK22 is connected to the left end of the contact line T2; during normal operation, the circuit breakers DK21 and DK22 are both closed, and the contact line T1 and the contact line T2 are connected in the circuit to form a short-circuited insulating joint FD2 branch. The left side of load switch FK2 is connected to the lower side of circuit breaker DK21, the right side of load switch FK2 is connected to the left side of damping resistor R2, and the right side of damping resistor R2 is connected to the lower side of circuit breaker DK22. During normal operation, load switch FK2 is closed to form a damping branch; current transformer LH2 and current transformer LH3 detect the current of the damping branch. The connection method of the short-circuited insulating joint branch and the damping branch at the insulating joint FD1, insulating joint FD3, and insulating joint FD4 is exactly the same as that at the insulating joint FD2. The upper side of circuit breaker DK11 at the insulating joint FD1 is connected in parallel with the upper side of circuit breaker DK12, and then connected to the power line a1 of the same-phase power supply substation SS1; the upper side of circuit breaker DK41 at the insulating joint FD4 is connected in parallel with the upper side of circuit breaker DK42, and then connected to the power line a2 of the same-phase power supply substation SS2.
[0027] During normal operation, two substations supplying the same phase realize through-power supply, and the running train draws current from both substations at the same time; when a short-circuit fault occurs in a certain section, the fault is cut off in sections. For example, when the short-circuit fault k occurs in the power supply section Sect2, the circuit breakers DK22 and DK31 are disconnected, causing the contact line T2 to be out of power, thereby minimizing the scope of the fault power outage.
[0028] When the train runs from left to right and is at the end of the contact wire T1, a short circuit fault occurs in the power supply section Sect2, and the circuit breakers DK22 and DK31 are disconnected, causing the contact wire T2 to lose power. At this time, the train is likely to carry load from the contact wire T1 in the energized area to the contact wire T2 in the de-energized area, generating an arc on the insulating joint FD2 and burning the contact wire. Due to the effect of the damping resistor R2, the overvoltage of the train entering the de-energized area will be greatly limited, reducing the possibility of arc generation; if an arc is generated, due to the shunting of the damping resistor R2 and the consumption of the arc power, the arc maintenance time will be greatly shortened, protecting the insulating joint FD2 and the contact wires T1 and T2.
[0029] Figure 2The permanent fault identification flow chart of the present invention is shown. When a short circuit fault occurs in the power supply section Sect2, after the circuit breakers DK22 and DK31 are disconnected, after the fault arc extinguishing time tx (tx = 200ms) set by the time limit is reached, if the current I1 detected by the current transformer LH2 and the current transformer LH3 is very small (less than 10A), it is considered that the fault in the power supply section Sect2 is a transient fault, and reclosing can be performed to reclose the circuit breakers DK22 and DK31 to restore the power supply to the contact line T2. On the contrary, when a short circuit fault occurs in the power supply section Sect2, after the circuit breakers DK22 and DK31 are disconnected, after the fault arc extinguishing time tx (tx = 200ms) set by the time limit is reached, if the current I2 detected by the current transformer LH2 and the current transformer LH3 is greater than the set current Iset (greater than 100A), the fault in the power supply section Sect2 is considered to be a permanent fault, and reclosing is not performed, reducing the secondary impact of the fault current on the circuit breaker, rails and contact wires, extending the service life of the equipment and preventing the expansion of the fault. The fault arc extinguishing time tx can be set in advance according to the line conditions, and the set current Iset can be calculated according to the selection of the damping resistor.
[0030] It is determined that a permanent fault has occurred in the power supply section Sect2, and the circuit breakers DK22 and DK31 have been disconnected. If the current detected by the damping branch current transformers LH2 and LH3 on both sides of the power supply section Sect2 is very small on one side (less than 10A), but greater than the set current Iset (greater than 100A) on the other side, it can be considered that the contact line has a broken wire fault, a short circuit fault has occurred on the side with large current, and a broken wire has occurred on the side with small current.
Claims
1. A control method for an electrified railway through-power supply system, characterized in that The method comprises two adjacent same-phase power supply substations SS1 and SS2, which supply power to the contact wire T and the rail Rail respectively, and insulating joints FD1, FD2, FD4 are arranged in sections in the line to divide the contact wire T into three sections, which are recorded as contact wire T1, contact wire T2 and contact wire T3, forming three power supply sections Sect1, Sect2 and Sect3; the method is characterized in that: at the position of the insulating joint FD2, the lower side of the circuit breaker DK21 is connected to the right end of the contact wire T1, the upper side of the circuit breaker DK21 is connected to the upper side of the circuit breaker DK22, and the lower side of DK22 is connected to the left end of the contact wire T2; during normal operation, the circuit breakers DK21 and DK22 are both closed, and the contact wire T1 and the contact wire T2 are connected on the line to form a short-circuited insulating joint FD2 branch; the left side of the load switch FK2 is connected to the lower side of the circuit breaker DK21, and the right side of the load switch FK2 is connected to the damping circuit breaker DK22. The left side of the damping resistor R2 and the right side of the damping resistor R2 are connected to the lower side of the circuit breaker DK22. During normal operation, the load switch FK2 is closed to form a damping branch, and the current transformer LH2 detects the current of the damping branch. The short-circuited insulating joint branches and the damping branch connection method at the insulating joints FD1, FD3, and FD4 are the same as that at the insulating joint FD2. The upper side of the circuit breaker DK11 at the insulating joint FD1 is connected in parallel with the upper side of the circuit breaker DK12, and then connected to the power line a1 of the same-phase power supply substation SS1. Connect the upper side of the circuit breaker DK41 and the upper side of the circuit breaker DK42 at the insulating joint FD4 in parallel and then connect them to the power line a2 of the same-phase power supply substation SS2; when a short circuit occurs in the power supply section Sect2, after the circuit breakers DK22 and DK31 are disconnected, after the fault arc extinguishing time tx set by the time limit is reached, if the current I1 detected by the current transformer LH2 and the current transformer LH3 is very small, it can be considered that the fault in the power supply section Sect2 is a transient fault, and reclosing can be performed to reclose the circuit breakers DK22 and DK31. Reclosing restores the power supply to contact line T2; on the contrary, when a short circuit occurs in power supply section Sect2, after circuit breakers DK22 and DK31 are disconnected, after the fault arc extinguishing time tx set within the time limit is reached, if the current I2 detected by current transformer LH2 and current transformer LH3 is greater than the set current Iset, then the fault in power supply section Sect2 is considered to be a permanent fault, and reclosing is not performed. The fault arc extinguishing time tx is set in advance according to the line conditions, and the set current Iset is calculated based on the selection of the damping resistor.
2. The control method of the electrified railway through power supply system according to claim 1, characterized in that : The same-phase power supply substation SS1 and the same-phase power supply substation SS2 realize through power supply. When operating normally, the running train draws current from both sides of the two substations at the same time; when a short circuit fault occurs in a power supply section, the faulty section is removed.
3. The control method of the electrified railway through power supply system according to claim 2, characterized in that : During normal operation, if the train runs from left to right and is at the end of the contact wire T1, if a short circuit fault occurs in the power supply section Sect2, the circuit breaker DK22 and the circuit breaker DK31 are disconnected, causing the contact wire T2 to be de-energized.
4. The control method of the electrified railway through power supply system according to claim 1, characterized in that : A permanent fault occurs in the power supply section Sect2, and the circuit breakers DK22 and DK31 have been disconnected. If the current detected by the transformers LH2 and LH3 of the damping branches on both sides of the power supply section Sect2 is less than 10A on one side and greater than the set current Iset on the other side, it is considered that the contact line has a broken wire fault, a short circuit fault occurs on the side with large current, and a broken wire occurs on the side with small current.
5. The control method of the electrified railway through power supply system according to claim 1, characterized in that : It is determined that a permanent fault has occurred in the power supply section and has been reported to the dispatcher. In order to protect the damping resistor and repair the contact network, the load switch of the damping branch is disconnected.