Order stress testing method, device, electronic device and storage medium

Stress testing e-commerce platforms using derived order copies allows simultaneous processing, maintaining normal operations and enhancing system stability during promotions.

CN113807909BActive Publication Date: 2024-12-03BEIJING WODONG TIANJUN INFORMATION TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110040284.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-01-13
Publication Date
2024-12-03
Estimated Expiration
2041-01-13

AI Technical Summary

Technical Problem

Current stress testing methods for e-commerce platforms during high-intensity operating conditions, such as e-commerce promotions, often disrupt normal order processing and delay real-time order display, affecting customer experience and increasing operational costs.

Method used

Perform stress testing using derived stress testing order copies that are processed separately from normal orders, allowing simultaneous scheduled processing without interference.

Benefits of technology

Ensures normal order processing continues uninterrupted while achieving effective stress testing results, improving system stability and reducing customer experience impact.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113807909B_ABST
    Figure CN113807909B_ABST
Patent Text Reader

Abstract

The present invention discloses an order stress testing method, device, electronic device and storage medium, the method comprising receiving a rated number of stress testing orders; deriving a stress testing order copy according to a predetermined derivation method based on the stress testing order; performing subsequent predetermined processing on the stress testing order, and stress testing the stress testing order copy according to the predetermined stress testing method to obtain a stress testing result. Stress testing is performed on the derived stress testing order copy, and the stress testing order is subjected to subsequent predetermined processing, so as to help solve the technical problem in the prior art that other processing cannot be performed normally during order stress testing. So as to help solve the technical problem in the prior art that different types of test programs cannot be efficiently tested.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of computers, and in particular to an order stress testing method, device, electronic equipment and storage medium. Background Art

[0002] At present, many systems need to be stress-tested, that is, to test whether the system can still operate normally through high-intensity operating conditions. For example, e-commerce platform systems such as JD.com will regularly perform stress tests under high-intensity operating conditions. In addition, other data needs to be used at the same time during the stress test, so there will be a contradiction between the two. E-commerce platforms often conduct off-site traffic diversion and promotion, and the promotion methods are very diverse. CPS promotion is based on the order transaction model and is favored by a large number of promoters, which is similar to the currently popular live content promotion.

[0003] The CPS promotion commission calculation method has high requirements for the real-time and accuracy of the promotion order display of the application system. If the order is displayed with a delay, it will directly affect the customer experience, and the customer site owner will mistakenly believe that the customer has not promoted successfully. On the other hand, in order to test the stability of the online system, especially the system performance before e-commerce promotions (such as Double Eleven), it is inevitable to conduct full-link stress testing of the system. At present, the usual method for full-link stress testing is to send an announcement to the customer site owner, suspend the service and accumulate online order traffic for stress testing, which will affect the customer's query of real-time promotion orders, at least affect the delayed display of online orders by 4 hours, and the operating costs of the CPS alliance will also increase accordingly.

[0004] Therefore, there is an urgent need for a stress testing method that can perform stress testing without affecting the current normal order processing operation, so as to help solve the technical problem in the prior art that other processing cannot be performed normally during order stress testing. Summary of the invention

[0005] The present application provides an order stress testing method, the purpose of which is to perform stress testing through a derived stress testing order copy, and the stress testing order performs subsequent scheduled processing, so as to help solve the technical problem in the prior art that other processing cannot be performed normally during order stress testing.

[0006] The method comprises:

[0007] Receive a specified number of stress testing orders;

[0008] Deriving a stress testing order copy according to the stress testing order in a predetermined derivation method;

[0009] The stress test order is subsequently scheduled for processing, and the stress test order copy is stress tested according to a predetermined stress test method to obtain a stress test result.

[0010] In another optional embodiment, receiving a rated quantity of stress testing orders includes:

[0011] Apply for topic queue;

[0012] Receive a specified number of orders and enter them into the topic queue;

[0013] The order is marked to obtain a stress testing order.

[0014] In another optional embodiment, dynamic configuration control is used to open or close the reception of a rated number of stress testing orders to enter the topic queue.

[0015] In another optional embodiment, deriving a stress testing order copy according to the stress testing order in a predetermined derivation manner includes:

[0016] Storing the stress testing order in a preset database;

[0017] A stress testing order copy is derived according to the stress testing order, wherein the stress testing order has a first order number, and the stress testing order copy has a second order number different from the first order number.

[0018] In another optional embodiment, the subsequent scheduled processing of the stress testing order includes:

[0019] The advertising amount is calculated according to the predetermined amount calculation method based on the stress test order, the advertising promoter ID and the advertising operator ID corresponding to the advertising amount are reset, and the stress test order copy is set to clean invalid orders.

[0020] In another optional embodiment, performing stress testing on the stress testing order copy according to a predetermined stress testing method to obtain a stress testing result includes:

[0021] Call the link used for stress testing;

[0022] A stress test is performed according to the link according to the stress test order copy to obtain a stress test result.

[0023] In another optional embodiment, after the stress testing order is subjected to subsequent predetermined processing and a stress testing result is obtained by stress testing the stress testing order copy in a predetermined stress testing manner, the method further includes:

[0024] Delete the stress testing order copy.

[0025] The present application also provides an order stress testing device, which includes:

[0026] The receiving module is used to receive a specified number of stress testing orders;

[0027] A generation module, used for deriving a stress testing order copy according to the stress testing order in a predetermined derivation method;

[0028] The stress testing processing module is used to perform subsequent scheduled processing on the stress testing order, and to perform stress testing on the stress testing order copy according to a predetermined stress testing method to obtain a stress testing result.

[0029] The present application also provides an electronic device, the electronic device comprising: a processor and a memory;

[0030] The memory stores an application program executable by the processor, which is used to enable the processor to perform the steps of the order stress testing method.

[0031] The present application also provides a computer-readable storage medium on which a computer program is stored, and when the program is executed by a processor, the steps of the order stress testing method are implemented.

[0032] As can be seen above, based on the above embodiment, stress testing is performed through the derived stress testing order copy, and the stress testing order is subsequently processed as scheduled, so as to help solve the technical problem in the prior art that other processing cannot be performed normally during order stress testing. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 A schematic diagram of a process 100 of an order stress testing method according to an embodiment of the present invention;

[0034] Figure 2 A schematic diagram of a process 200 of an order stress testing method according to an embodiment of the present invention;

[0035] Figure 3 It is a schematic diagram of a process 300 of an order stress testing method in one embodiment of the present invention;

[0036] Figure 4 A schematic diagram of a process 400 of an order stress testing method according to an embodiment of the present invention;

[0037] Figure 5 Schematic diagram of the architecture of an order stress testing device in one embodiment of the present invention. DETAILED DESCRIPTION

[0038] At present, e-commerce platform systems need to perform data stress testing on the entire chain of orders before major e-commerce promotions (such as Double Eleven), which can be understood as performing order stress testing on multiple links such as payment, warehousing logistics, and distribution after users place orders. During the full-chain order stress testing, a large number of orders with a specified number within a certain period of time will be intercepted, but during the interception process, the intercepted order data still needs to undergo a lot of other processing, such as the subsequent reservation processing of CPS promotion commission during the stress testing. CPS promotion commission can be understood as the webmaster being the manager and letting the promoter promote the product. After the user places an order to purchase the product from the promoter, the webmaster settles the promoter's promotion fee to the promoter based on the order in the promoter's hands. It can also be understood as a payment of advertising fees to the promoter. The current live streaming is one of the more typical methods. Before each full-link order stress test, it is necessary to synchronize the announcement on the operation side and synchronize the alliance pusher webmaster, because in this process, the pusher cannot view the promotion order in real time, and the full-link order stress test often takes more than 4 to 5 hours. During this period, the pusher cannot query the orders they promote normally, nor can they calculate their income normally. It takes a delay to query the orders and calculate the income, which greatly affects the pusher experience. On the contrary, if the order is not intercepted and the real-time order volume is used, although the impact on the pusher is not great, the order stress test effect will be very poor because the order volume has not accumulated to a certain scale and the high-pressure state cannot be truly simulated. In addition, since the entire order stress test link is long, it may include multiple links such as payment, warehousing, and logistics. If there is a problem in any link, the quasi-real-time completion of the order stress test process cannot be guaranteed, and the normal query of the pusher and the progress of the promotion fee settlement may continue to be delayed. It should be pointed out that the above application scenarios of CPS promotion commission calculation are only for better explanation of this application, and are not specific limitations on all embodiments of this application.

[0039] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0040] Figure 1 FIG. 1 is a schematic diagram of a process 100 of an order stress testing method according to an embodiment of the present invention. Figure 1 As shown, in one embodiment, the present application provides an order stress testing method, including:

[0041] S101, receiving a rated quantity of stress testing orders.

[0042] In this step, a specific step of receiving a rated number of stress testing orders is provided. The stress testing orders intercepted in this step are used for order stress testing. The rated number is set according to a pre-configured configuration, such as 10 million stress testing orders. Through such a large number of orders, it is mainly to provide a high-pressure environment for order stress testing to ensure the quality and effect of stress testing.

[0043] S102: derive a stress testing order copy according to the stress testing order in a predetermined derivation method.

[0044] In this step, a specific step is provided for deriving the stress testing order copy from the stress testing order. The stress testing order will continue to be processed according to the process of the original system, and the stress testing order copy will be used for stress testing to avoid mutual interference between the two. It should be pointed out that the stress testing order will generate the stress testing order copy one by one, so it can be understood that each stress testing order derives the corresponding stress testing order copy.

[0045] S103, performing subsequent scheduled processing on the stress testing order, and performing stress testing on the stress testing order copy according to a predetermined stress testing method to obtain a stress testing result.

[0046] In this step, a specific step is provided for performing subsequent scheduled processing on the stress testing order and performing stress testing on the stress testing order copy at the same time, so that the two do not interfere with each other. The scheduled processing here can be any processing after the stress testing order, and the stress testing order copy is used for the subsequent stress testing process.

[0047] In this embodiment, a specific implementation method of an order stress testing method is provided. First, this application is based on order stress testing of an e-commerce platform. During the order stress testing process, a portion of the orders needs to be processed normally on the one hand, and this portion of the orders needs to be used for the stress testing process. Therefore, the system first receives a rated number of the stress testing orders. The stress testing orders are also orders circulating in the normal system, so the normally circulating orders can be intercepted. After intercepting the rated number of orders as the stress testing orders, a stress testing order copy is derived according to the stress testing order in a predetermined derivation method. The order is actually some data, including order number, product information, logistics information, etc., and its data load is not very large, so even if the stress testing order copy is derived according to the stress testing order, the computing power requirement will not be very large. Finally, the stress testing order is subsequently processed in a predetermined manner, and the stress testing order copy is stress tested in a predetermined stress testing manner to obtain the stress testing result. When there are the rated number of stress test orders and stress test order copies, the stress test order will be processed normally according to the subsequent scheduled processing that should have been performed, and the stress test order copy will be independently stored, stress tested, etc. Because this embodiment adopts the method of normal processing of one stress test order and stress testing of another stress test order copy, the two are run separately without interference, and finally the scheduled processing side cannot perceive the stress testing process, which improves its experience and also improves the stress testing quality of the entire system, so it helps to solve the technical problem that other processing cannot be performed normally during order stress testing in the prior art.

[0048] Figure 2 FIG. 2 is a schematic diagram of a process 200 of an order stress testing method according to an embodiment of the present invention. Figure 2 As shown, in an optional embodiment, receiving a rated quantity of stress testing orders includes:

[0049] S201, apply for topic queue.

[0050] In this step, a specific method for intercepting the stress test order is provided. In this step, a topic queue is applied from MQ for entering the order in the following step. MQ: Message queue is a communication method between applications. Applications achieve communication by writing and checking messages in the queue without the need for direct connection of applications, which achieves the purpose of decoupling applications and enables one party to produce and multiple parties to consume at the same time.

[0051] S202, receiving a rated number of orders and entering them into the topic queue.

[0052] In this step, a specific step of entering a rated number of orders into the topic queue is provided, which is essentially to select the orders for stress testing.

[0053] S203: Mark the order to obtain a stress test order.

[0054] In this step, a specific step of marking the order is provided. After marking the order, it is determined that the marked orders are the stress test orders, and the stress test orders are used for the subsequent stress test. The marking here is equivalent to putting an identification code on the order, and the stress test order will be monitored by union_robot.

[0055] In this embodiment, a specific implementation method is provided for applying for a new topic queue in MQ for entering the order. The order in the topic queue is marked and monitored by union_robot. In this embodiment, the intercepted order is converted into the stress test order for stress testing.

[0056] In an optional embodiment, dynamic configuration control is used to open or close the reception of a rated number of stress testing orders to enter the topic queue.

[0057] In this embodiment, a specific implementation method of controlling the number of stress testing orders through the dynamic configuration control is provided. The dynamic configuration control can be understood as a switch, which can freely adjust the interception number of the stress testing order according to specific needs, that is, control the rated number. In addition, the system also needs to adjust the number of stress testing orders according to the specific computing power and actual conditions, and can open or close the interception at any time, so a dynamic control method can be formed through the control of the dynamic configuration control.

[0058] Figure 3 FIG. 3 is a schematic diagram of a process 300 of an order stress testing method according to an embodiment of the present invention. Figure 3 As shown, in an optional embodiment, deriving a stress testing order copy according to the stress testing order in a predetermined derivation manner includes:

[0059] S301, storing the stress testing order in a preset database.

[0060] In this step, a specific step of storing the stress test order in the database is provided. It should be noted that the stress test order is stored in the online order library table.

[0061] S302: derive a stress testing order copy according to the stress testing order, wherein the stress testing order has a first order number, and the stress testing order copy has a second order number different from the first order number.

[0062] In this step, a specific step of generating the stress testing order copy is provided. It should be noted that the stress testing order will have a first order number, which is the real order number of the stress testing order, and the second order number of the stress testing order copy is a virtual order number, the purpose of which is to prevent the personnel who normally participate in the subsequent interaction from seeing that the order he processes is used for stress testing. In addition, the second order number can be generated by adding a fixed value to the first order number, for example, the first order number is 00001 and the fixed value 0025 is added, and the final second order number is 000010025.

[0063] In an optional embodiment, the subsequent scheduled processing of the stress testing order includes:

[0064] The advertising amount is calculated according to the predetermined amount calculation method based on the stress test order, the advertising promoter ID and the advertising operator ID corresponding to the advertising amount are reset, and the stress test order copy is set to clean invalid orders.

[0065] In this embodiment, the subsequent pre-processing side is carried out normally. For example, the alliance needs to continue to calculate the commission. The commission here is actually a kind of advertising expenditure, that is, the advertising amount. The advertising promoter ID (adownerId, that is, the advertiser ID, the merchant or supplier who needs to promote the product through CPS alliance advertising, that is, the user on the delivery end.) and the advertising operator ID (unionId, that is, the webmaster ID, the promoter who promotes the CPS alliance, receives the promotion link to promote the product, and finally obtains the promotion commission based on the order.) will also be reset and changed, and its purpose is also to cut off the interaction between the normal processing side and the stress testing side. In addition, the stress testing order copy can also be set to clean invalid orders. After setting it to clean invalid orders, the personnel on the normal pre-processing side cannot see the stress testing order copy, which is equivalent to providing a double insurance. In this embodiment, calculating the advertising amount is equivalent to a follow-up operation, that is, the CPS alliance click attribution operation, analyzing the click information before the order is generated, and obtaining the optimal click and promoter information according to the priority, which is used as the basis for subsequent CPS alliance commission calculation. In addition, it should be pointed out that not all of the stress test orders that are intercepted are orders that are promoted by Tuike, that is, not all of them participate in CPS promotion commission calculation. The calculation here is only for the stress test orders that need to calculate the advertising amount.

[0066] Figure 4 FIG. 4 is a schematic diagram of a process 400 of an order stress testing method according to an embodiment of the present invention. Figure 4 As shown, in an optional embodiment, performing stress testing on the stress testing order copy according to a predetermined stress testing method to obtain a stress testing result includes:

[0067] S401, calling the link for stress testing.

[0068] This step provides a step for calling the links used in stress testing. For example, in the stress testing process, the payment process, the warehousing process, and the distribution process in the system need to be stress tested, but the subsequent downstream processes do not need to be stress tested. In this case, the links that will be stress tested will be called first in this step.

[0069] S402: Perform stress testing on the link according to the stress testing order copy to obtain stress testing results.

[0070] In this step, specific steps are provided for performing stress testing on the link called in the previous step to finally obtain the stress testing result.

[0071] In this embodiment, a method of calling the link is provided, and then stress testing is performed through the link according to the stress testing order, and finally the stress testing result is obtained. The system can implement the function of this embodiment by issuing the stress testing order with the newly added mark in the index MQ part, and not issuing the order status change MQ for the stress testing order, so as to effectively avoid the stress testing order affecting the downstream. In addition, the order query consumes the heterogeneous order data of the index MQ to the index table, and the index table is for the marked stress testing order. In addition, according to the stress testing result, a stress testing report can be produced to summarize and analyze the problems of the system and break through the bottleneck.

[0072] In an optional embodiment, after the stress testing order is subjected to subsequent predetermined processing and a stress testing result is obtained by stress testing the stress testing order copy in a predetermined stress testing manner, the method further includes:

[0073] Delete the stress testing order copy.

[0074] In this embodiment, a specific implementation method after obtaining the stress testing result is provided. The stress testing order copy needs to be deleted after the stress testing, or the stress testing order can be selected according to whether it is marked, and then the corresponding stress testing order copy will be selected. In addition to deleting the stress testing order copy, the order table and index table stress testing order data of the stress testing order copy can also be physically deleted.

[0075] Figure 5 FIG. 1 is a schematic diagram of the architecture of an order stress testing device in one embodiment of the present invention. Figure 5 As shown, in another optional embodiment, the present application provides an order stress testing device, the device comprising:

[0076] A receiving module 101 is used to receive a rated number of stress testing orders;

[0077] A generating module 102, configured to derive a stress testing order copy according to the stress testing order in a predetermined derivation manner;

[0078] The stress testing processing module 103 is used to perform subsequent scheduled processing on the stress testing order, and perform stress testing on the stress testing order copy according to a predetermined stress testing method to obtain a stress testing result.

[0079] In another optional embodiment, an electronic device is characterized in that the electronic device includes: a processor and a memory;

[0080] The memory stores an application program executable by the processor, which is used to enable the processor to perform the steps of the order stress testing method.

[0081] In another optional embodiment, a computer-readable storage medium stores a computer program thereon, characterized in that when the program is executed by a processor, the steps of the order stress testing method are implemented.

[0082] In addition, the method steps described in this application can be implemented by hardware in addition to being implemented by a data processing program, for example, by logic gates, switches, application-specific integrated circuits (ASICs), programmable logic controllers, and embedded microcontrollers, etc. Therefore, such hardware that can implement the method described in this application can also constitute this application.

[0083] The flow chart and block diagram in the accompanying drawings of the present application show the possible architecture, function and operation of the system, method and computer program product according to the various embodiments disclosed in the present application. In this regard, each box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the above-mentioned module, program segment or a part of a code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some implementations as replacements, the functions marked in the box can also occur in the order of the standards in different figures. For example, the boxes represented by two connections can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram or flow chart, and the combination of the boxes in the block diagram or flow chart can be implemented with a dedicated hardware-based system that performs the specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0084] Those skilled in the art will appreciate that the features described in the various embodiments and / or claims of the present disclosure may be combined and / or combined in a variety of ways, even if such combinations or combinations are not explicitly described in the present application. In particular, without departing from the spirit and teachings of the present application, the features described in the various embodiments and / or claims of the present application may be combined and / or combined in a variety of ways, and all of these combinations and / or combinations fall within the scope disclosed in the present application.

[0085] Specific embodiments are used herein to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core ideas, and is not used to limit the present application. For those skilled in the art, changes can be made in the specific implementation methods and application scopes according to the ideas, spirits and principles of the present invention, and any modifications, equivalent substitutions, improvements, etc. made therein should be included in the scope of protection of this application.

[0086] In practical applications, the computer-readable medium may be included in the device / apparatus / system described in the above embodiments, or may exist independently without being assembled into the device / apparatus / system. The computer-readable storage medium carries one or more programs, and when the one or more programs are executed, the data table partitioning device described above implements the data table partitioning method.

[0087] According to the embodiments disclosed in the present application, the computer-readable storage medium may be a non-volatile computer-readable storage medium, for example, it may include but is not limited to: a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof, but it is not used to limit the scope of protection of the present application. In the embodiments disclosed in the present application, the computer-readable storage medium may be any tangible medium containing or storing a program, which may be used by or in combination with an instruction execution system, apparatus, or device.

Claims

1. An order stress testing method, characterized in that: It is used in scenarios where the stress test is performed on the orders in the system and the subsequent reservation processing is performed on the orders related to CPS promotion commission calculation under stress test, including: Receive a rated quantity of stress testing orders in the order; A stress testing order copy is derived according to the stress testing order in a predetermined derivation method; the stress testing order generates the stress testing order copy one-to-one; the stress testing order has a first order number, and the stress testing order copy has a second order number different from the first order number; Perform subsequent scheduled processing on the orders in the stress test order that are related to the CPS promotion commission calculation, and set the stress test order copy to clean invalid orders; and perform stress testing on the stress test order copy according to the predetermined stress testing method to obtain the stress testing result; The subsequent reservation processing includes: calculating the advertising amount according to the stress test order in accordance with the predetermined amount calculation method, and resetting the advertising promoter ID and the advertising operator ID corresponding to the advertising amount.

2. The order stress testing method according to claim 1, characterized in that: Receiving a rated number of stress testing orders includes: Apply for topic queue; Receive a specified number of orders and enter them into the topic queue; The order is marked to obtain a stress testing order.

3. The order stress testing method according to claim 2, characterized in that: Through dynamic configuration control, open or close the reception of a rated number of stress testing orders and enter them into the topic queue.

4. The order stress testing method according to claim 1, characterized in that: The deriving a stress testing order copy according to the stress testing order in a predetermined derivation manner includes: Storing the stress testing order in a preset database; A stress testing order copy is derived according to the stress testing order.

5. The order stress testing method according to any one of claims 1 to 4, characterized in that: The performing stress testing on the stress testing order copy according to the predetermined stress testing method to obtain the stress testing result includes: Call the link used for stress testing; A stress test is performed according to the link according to the stress test order copy to obtain a stress test result.

6. The method according to claim 1, characterized in that After the step of performing stress testing on the stress testing order copy according to the predetermined stress testing method to obtain the stress testing result, the method further includes: Delete the stress testing order copy.

7. An order stress testing device, characterized in that: The device is applied to the scenario of performing subsequent scheduled processing on the orders related to CPS promotion commission calculation while stress testing the orders in the system. The device includes: A receiving module, used for receiving a rated quantity of stress testing orders in the order; A generation module, configured to derive a stress testing order copy according to the stress testing order in a predetermined derivation method; the stress testing order generates the stress testing order copy one-to-one; the stress testing order has a first order number, and the stress testing order copy has a second order number different from the first order number; The stress testing processing module is used to perform subsequent scheduled processing on the orders related to the CPS promotion commission in the stress testing order, set the stress testing order copy to clean invalid orders; and perform stress testing on the stress testing order copy according to the predetermined stress testing method to obtain the stress testing result; wherein, the subsequent scheduled processing includes: calculating the advertising amount according to the predetermined amount calculation method based on the stress testing order, and resetting the advertising promoter ID and advertising operator ID corresponding to the advertising amount.

8. An electronic device, characterized in that: The electronic device comprises: a processor and a memory; The memory stores an application program executable by the processor, which is used to enable the processor to execute the steps of the order stress testing method according to any one of claims 1 to 6.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steps of the order stress testing method described in any one of claims 1 to 6 are implemented.