A shaft construction method
By applying advanced support at the wellhead section and applying the two-lift and middle partition method from the bottom of the well from bottom to bottom, the problems of low construction efficiency and poor stability of the vertical shaft under adverse geological conditions are solved, and stable and efficient construction under harsh conditions are achieved.
Patent Information
- Application Number
- CN202111474073.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-02
- Publication Date
- 2025-03-25
- Estimated Expiration
- 2041-12-02
AI Technical Summary
Under unhealthy geological conditions, it is difficult for the prior art to effectively construct vertical shafts, resulting in low construction efficiency and poor stability.
A vertical shaft construction method is adopted, including wellhead section construction, advance support, wellbody excavation, molded concrete forming wellbody first lining, horsehead door construction, and the use of split-flap mechanical integrated sliding form method from bottom to top to use the well body second lining and middle partition plate.
Through advanced support and composite lining structure, the stability and waterproofness during the well body excavation process are enhanced, construction efficiency and safety are improved, and vertical shafts can be successfully constructed under harsh natural conditions.