Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

12007results about "Shaft lining" patented technology

Tunnel grouting method and device

The embodiment of the invention provides a tunnel grouting method and device, and a grouting balance prediction system is constructed by combining a machine learning model and a numerical manifold method. By analyzing critical value characteristics of a pressure-volume curve and combining grouting flow and rock mass displacement data, model training is performed, and accurate prediction of the grouting state is realized. The system adopts a Bingham fluid model and a fluid-solid coupling model to calculate optimal grouting parameters, correction is carried out through a zero-thickness cohesion unit model, and automatic regulation and control of a grouting pump are achieved. According to the method, the defects of the traditional technology in parameter optimization and process control are effectively overcome, a scientific basis is provided for grouting construction of tunnel engineering, and the grouting quality and efficiency are remarkably improved.
Owner:BEIJING HENGDA WEIDI CONSTRUCTION ENGINEERING CO LTD

Three-layer overlapping assembly type underground station assembling trolley equipment

The invention relates to the technical field of construction trolley equipment, in particular to three-layer overlapping assembly type underground station assembling trolley equipment which comprises a movable pedestal, a movable platform, a movable platform, a movable platform, a movable platform and a movable platform, wherein the movable pedestal is provided with a shear-type lifting platform which ascends and descends in the vertical direction; the fixed frame seat is fixedly mounted on the shear type lifting platform; the side wall assembling assembly comprises a horizontal connecting plate which is horizontally and movably mounted on one side of the fixing frame base and an L-shaped supporting plate which is mounted at the outer end of the horizontal connecting plate; the moving block is horizontally and movably mounted on the other side of the fixing frame base through a driving source, and a longitudinal beam supporting plate and a clamping jaw are mounted on the moving block; the arranged movable pedestal is matched with the fixed frame seat, so that a lifting function and a mounting site are provided, and the device can be suitable for splicing operation of a three-layer overlapping assembly type underground station; the equipment has mobility, the structure is stable and reliable in the construction process, and the requirement for gravity bearing of the prefabricated part can be met; quick positioning and assembling of the assembling position of the prefabricated part can be achieved, then the construction procedure is simplified, and the construction efficiency is improved.
Owner:CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD

Intelligent regulation and control shield segment crack minimally invasive repair method

The invention relates to the technical field of tunnel engineering, and discloses an intelligent regulation and control shield segment crack minimally invasive repair method, which comprises the following operation steps: intelligently identifying a crack, comprehensively scanning a shield segment by using high-definition camera equipment, obtaining a high-definition image of the surface of the segment, and obtaining a high-definition image of the surface of the segment by applying an image processing technology and a deep learning algorithm. The image is analyzed and processed, key parameters such as the position, the width, the length and the depth of the crack are automatically identified, a crack three-dimensional model is constructed, and accurate data support is provided for subsequent minimally invasive repair; and making a minimally invasive repair scheme, and combining factors such as a segment material and a stress condition according to a crack identification result. According to the intelligent regulation and control shield segment crack minimally invasive repair method, accurate recognition, minimally invasive treatment and effect evaluation of shield segment cracks are achieved, and the purposes of improving the repair efficiency, reducing the construction risk and ensuring the safety and stability of a tunnel structure are achieved.
Owner:ARMY ENG UNIV OF PLA

Construction method of high and large formwork engineering supporting system

The invention discloses a high and large formwork engineering supporting system construction method, and belongs to the technical field of building engineering. Comprising the following steps: step 1, arranging intelligent nodes in a high and large template support system to realize information sharing and group cooperative regulation and control among the nodes; step 2, dividing the support system into a plurality of mutually associated load control areas, and setting differentiated load control parameters; step 3, automatically optimizing a pouring path; 4, when the concrete strength reaches a preset threshold value, the supporting rigidity or the reserved deformation amount is automatically adjusted according to a preset program, and the concrete structure bears the dead weight step by step; 5, the temporary load is automatically compensated, when the load exceeds a safety threshold value, a load redistribution mechanism and a reinforcing device are triggered, meanwhile, an alarm is started, and abnormal data are pushed; and step 6, continuously optimizing control parameters, accumulating construction data, constructing a digital construction record and a knowledge base, and realizing intelligent iterative upgrading of the construction method.
Owner:SHENZHEN PENINSULA ENG MANAGEMENT CO LTD

Deep water-rich weak-impact coal seam surrounding rock control method based on rapid tunneling

The invention discloses a deep water-rich weak-impact coal seam surrounding rock control method based on rapid tunneling, and relates to the technical field of surrounding rock control. The method comprises the steps that S1, a high-risk area is identified through address detection, a waterproof curtain is constructed, and the tunneling disturbance risk is reduced; s2, rapid tunneling and instant supporting are conducted, the surrounding rock exposure time is shortened, tunneling and supporting are completed synchronously, and deformation development is restrained; s3, sensing a surrounding rock-support response in real time, optimizing parameters and early warning risks, and realizing dynamic monitoring and feedback regulation and control; s4, later-stage continuous reinforcement maintenance is conducted, so that the roadway adapts to the rheological characteristics of deep surrounding rock, and the service cycle of the roadway is prolonged; according to the method, a high-risk area is identified through various detection technologies, and instant supporting is achieved through cutting process optimization and digging and supporting collaborative operation; real-time monitoring and dynamic feedback are achieved, and automatic optimization of supporting parameters is achieved; and later reinforcement and periodic maintenance are adopted to ensure that the surrounding rock supporting system can adapt to the rheological characteristics of deep surrounding rock for a long time.
Owner:CHINA COAL NO 3 CONSTR (GRP) CORP LTD

Construction method for karst tunnel to extend through karst cave

PCT designated stage expiredWO2025043970A1Mining devicesUnderground chambersEcological environmentKarst
Provided in the present invention is a construction method for a karst tunnel to extend through a karst cave. The construction method comprises the following steps: (1) excavation expansion and support for a karst cave; (2) dredging of the base of the karst cave, and backfilling; (3) inverted-arch and filling construction; (4) water-stop wall construction, and concrete backfilling on two sides; (5) initial support construction; (6) initial-support top backfilling and waterproof-layer construction; (7) secondary-lining waterproofing and drainage construction; (8) mounting and debugging of a water pressure monitoring system; and (9) implementation of a monitoring and early-warning scheme. The construction method is suitable for engineering in unfavorable geological conditions, for example, a water-rich karst tunnel extending through large underground karst caves, karst troughs and underground rivers. In the construction method, the operation difficulty of the steps is relatively low, the construction quality is controllable, there are few construction blind areas, and the safety of construction is relatively high; the initial runoff balance of karst cave underground water can be maintained, and thus the surrounding ecological environment can be protected to the maximum extent.
Owner:CCCC FIRST HIGHWAY XIAMEN ENGINEERING CO LTD

Longitudinal dynamic floating prediction method for segment in shield tunnel construction period

The invention provides a shield tunnel construction period segment longitudinal dynamic floating prediction method, and relates to the field of shield tunnel segment floating prediction.The method comprises the steps that the static upward floating force and the dynamic upward floating force of a shield tunnel are calculated by considering the timeliness of slurry, and the characteristic of nonlinear change of the rigidity of a circular seam connector is considered; the method comprises the following steps: dividing bending-resistant and shearing-resistant deformation modes of a circular seam joint, further deducing bending rigidity and shearing rigidity of a tenon-type joint in each deformation stage, deducing a shield tail segment longitudinal floating prediction model of the circular seam joint in the shield tunnel construction period, and constructing a nonlinear iterative algorithm of shield tunnel longitudinal deformation according to the theories; and acquiring parameter data of actual engineering, and inputting the parameter data into the duct piece floating prediction model to obtain a duct piece floating value. By means of the method, accurate prediction of floating deformation of the shield tail segment in large shield tunneling can be achieved, an effective scientific basis is provided for large-diameter shield tunneling construction, the problems that parameter decision of shield tunneling machine operators is difficult, and the segment floating control effect is poor are solved, and structural diseases caused by too large floating of the shield tail segment are eliminated.
Owner:ZHENGZHOU UNIV

Regional high-stress discrete curing roadway supporting process

The invention relates to the field of coal mine underground roadway supporting processes, and discloses a roadway supporting process for regional high-stress discrete solidification. The method comprises the steps of geological exploration and stress testing, roadway support processing, support sorting, parameter determination and real-time monitoring and feedback, in the roadway support processing, a stress data processing module is constructed, stress data around a roadway are discretized into a plurality of area units, support sorting is conducted on the area units, and the roadway support processing module is constructed; and the high-stress area and the secondary high-stress area are sequentially subjected to supporting construction, parameters of anchor rods and anchor cables are determined before supporting construction, and the supporting effect is ensured. According to the roadway supporting method suitable for regional high-stress discrete solidification, the stability of the roadway is enhanced, the service life is prolonged, and the safety is improved by perfecting the supporting process.
Owner:SUNCUN COAL MINE OF XINWEN MINING GRP CO LTD +1

Sprayed concrete suitable for high geothermal tunnel environment and preparation method thereof

The invention discloses sprayed concrete suitable for a high geothermal tunnel environment and a preparation method of the sprayed concrete. The sprayed concrete is prepared from cement, hollow glass beads, modified hydrophobic aerogel, coarse aggregate, fine aggregate, water, an additive, silica mortar, a high-temperature applicable accelerator and the like. The high-strength hollow glass beads and the aerogel are introduced as thermal insulation aggregates, the hollow glass beads are graded and optimized by adopting three particle sizes, and the aerogel is hydrophobically modified by adopting a co-precursor method, so that the heat conductivity coefficient of the sprayed concrete can be greatly reduced and the thermal insulation performance of the sprayed concrete can be improved by introducing the high-strength hollow glass beads and the aerogel; the silicon mortar and the high-temperature applicable accelerator are introduced, so that the working performance of the sprayed concrete can be improved, and the high-temperature stability of a hydration product is guaranteed. The application of the sprayed concrete can effectively reduce the cavern temperature in a high-ground-temperature tunnel and weaken the influence of a high-temperature environment on the long-term performance of the sprayed concrete, so that the service life of the sprayed concrete in the high-temperature environment is effectively prolonged.
Owner:RAILWAY CONSTR RES INST OF CHINA ACAD OF RAILWAY SCI CO LTD +2

Intelligent trolley monitoring method and system based on cloud platform

The invention relates to an intelligent trolley monitoring method and system based on a cloud platform, and the method comprises the steps: collecting multi-source data of a trolley in a construction process, and the multi-source data comprises sensor data and video monitoring data; preprocessing the multi-dimensional data through edge computing equipment, and uploading the preprocessed data to a cloud platform for centralized processing and storage; the preprocessed data are analyzed, the construction state of the trolley is recognized, the construction state analysis result of the trolley is generated, and the construction state comprises the trolley operation state, the concrete pouring state and the lining quality; and dynamically adjusting construction parameters of the trolley according to a construction state analysis result of the trolley. The construction method has the effect of improving the construction quality.
Owner:CHINA RAILWAY TUNNEL GROUP CO LTD +1

Intelligent safety and stability assessment method, system and equipment for underground cavern and storage medium

The invention provides an intelligent safety and stability assessment method, system and device for an underground cavern and a medium, and the method comprises the following steps: S1, building a three-dimensional geological model of the underground cavern according to initial geological exploration data; s2, multiple monitoring instruments are pre-buried in key parts of the underground cavern, and monitoring data are collected in real time; s3, constructing an underground cavern safety and stability evaluation model based on a deep learning algorithm; s4, inputting real-time monitoring data into an evaluation model, combining historical monitoring data and geological model information, analyzing and comparing with a three-dimensional numerical calculation result, adjusting geological parameters, performing reconstruction evaluation, and outputting a safety and stability level; and S5, according to an evaluation result, automatically generating early warning information and processing suggestions. According to the method, the problems of poor real-time performance and low data utilization rate of traditional evaluation under complex geological conditions are solved, and the intelligent level of construction safety monitoring of underground cavern groups such as hydropower stations and pumped storage projects can be effectively improved.
Owner:POWERCHINA HUADONG ENG CORP LTD

Intelligent maintenance method and system driven by sensing of temperature and humidity fields in concrete

The invention discloses an intelligent curing method and system driven by sensing of an internal temperature and humidity field of concrete. The intelligent curing method comprises the following steps that the surface tensile strength and the elastic modulus of the concrete of the same concrete mix proportion and different ages are obtained; according to the concrete maturity theory and the concrete surface tensile strength of different ages, a fitting function of the concrete surface tensile strength is obtained; predicting a fitting function through the elastic moduli of different ages and the elastic moduli; obtaining the inner surface control temperature difference of the concrete at different ages by utilizing the relationship between the concrete surface tensile strength and the concrete surface tensile stress and combining the fitting function of the concrete surface tensile strength and the elastic modulus prediction fitting function; and the concrete curing environment temperature and humidity are intelligently controlled according to the inner surface control temperature difference of the concrete of different ages. By dynamically determining the concrete curing temperature control index and combining with the humidity requirement, the on-off of the curing equipment is controlled, and the temperature and humidity of the concrete curing environment are intelligently controlled.
Owner:CCCC WUHAN HARBOR ENG DESIGN & RES +1

Collaborative segmented supporting method for matching stiffness of multiple rock stratums of crossing roadway

The invention relates to the technical field of mine safety, and provides a cross-layer roadway multi-rock-stratum rigidity matching collaborative segmented supporting method which comprises the steps that plastic zone ranges of different rock stratum areas in a cross-layer roadway are determined, and rock stratum joint fissure zones and weak intercalated layers are identified; monitoring the elastic zone rigidity and the plastic zone weakening rate of the surrounding rock, constructing a surrounding rock mechanical model, obtaining the supporting structure rigidity for inhibiting the expansion of the plastic zone through the surrounding rock mechanical model, and constructing a supporting structure according to the supporting rigidity; and the reinforcing material is sprayed to the surface of the surrounding rock through high-pressure jet flow to form a protective layer. Through the cooperative control thought of weak layer control, rigidity adjustment and resistance transfer, breakthrough transformation of crossing roadway support from passive defense to active control is achieved, according to a scientific surrounding rock mechanical model, the rigidity of the support structure can effectively inhibit expansion of a plastic zone, the stability of a system is maintained, and the stability of the system is improved. And finally, an ultrahigh strength performance and gradient spraying layer structure technology is adopted, so that the compression strength and the shear strength of the surrounding rock are remarkably improved.
Owner:GUIZHOU INST OF TECH

Inorganic two-component grouting material for mine as well as preparation method and application of inorganic two-component grouting material

The invention discloses an inorganic two-component grouting material for a mine and a preparation method and application thereof, and belongs to the technical field of inorganic grouting materials. The weight ratio of the component A to the component B is (0.3-1.2): 1, and the component A comprises superfine Portland cement, silicon powder, an expanding agent, a water reducing agent, a retarder, lithium carbonate, cellulose ether, a defoaming agent and latex powder; the component B comprises sulphoaluminate cement, slag, an expanding agent, a water reducing agent, lithium carbonate, cellulose ether, a defoaming agent, latex powder and a retarder; the weight ratio of the slag to the sulphoaluminate cement is (3.5-5.6): 1, and the weight ratio of the superfine Portland cement to the sulphoaluminate cement is (2.5-4): 1. The inorganic double-component grouting material for the mine can be rapidly solidified and has the functions of water plugging and reinforcement.
Owner:SHANDONG DONGHUA TECH CO LTD

Crack-resistant ultra-high performance concrete for underground engineering in water-rich strata, preparation method, and application thereof

The present invention discloses a crack-resistant ultra-high performance concrete (UHPC) for underground engineering in water-rich strata, preparation method, and application thereof, belonging to the technical field of building materials. The concrete is prepared from the following raw materials in parts by weight: 550-650 parts of cement, 140-180 parts of fly ash, 120-150 parts of silica fume, 200-300 parts of calcined shield tunnel slag, 30-50 parts of micron-scale magnesium oxide, 30-50 parts of nano-scale magnesium oxide, 30-50 parts of rheology-modifying material, 800-1000 parts of lightweight aggregate, 4-8 parts of water reducer, and 50-200 parts of water. The rheology-modifying material has a fluidity ratio of 106%. The present invention incorporates calcined shield tunnel slag, micron / nano-scale magnesium oxide, and lightweight aggregate into the UHPC, which effectively suppresses shrinkage and reduces crack formation.
Owner:SHANDONG UNIV

Outgoing line vertical shaft slip form lining construction method

The invention discloses an outgoing line shaft slip-form lining construction method, which belongs to the field of building construction, and comprises the following steps: construction preparation, completion of survey lofting of a shaft construction area, power supply, arrangement of a water supply and communication system, and slip-form manufacturing, installation and debugging. A lifting frame, a supporting frame, a vertical back ridge, a hydraulic jack, a supporting rod, a material distribution platform, a central rotary material distribution mechanism and a chute device are sequentially installed, and debugging and sliding and lifting testing of a hydraulic system are completed; slip form sliding and lifting and concrete pouring are conducted, construction is conducted in the three stages of initial sliding, normal sliding and lifting and sliding and lifting completion, and the concrete quality is ensured through layered pouring and accurate vibration; the construction precision of the slip form is controlled, deviation is monitored in real time through a laser swinger, a limiting and leveling device and a vertical monitoring system, and deviation correction measures are taken when the deviation exceeds 1.5 cm; and the sliding formwork is dismantled, specifically, the formwork is dismantled step by step after sliding formwork construction is completed. By optimizing the construction process and accurately controlling the technology, the construction efficiency and the concrete quality are remarkably improved.
Owner:CHINA RAILWAY SHISIJU GROUP CORP +1

Reamer bit and concrete repairing method

The invention relates to the field of constructional engineering concrete detection, in particular to a reamer bit and a concrete repairing method.The reamer bit comprises a mounting base, at least two drill arms and at least two supporting rods; one end of the drill arm is hinged with the mounting seat, a fixing pipe is arranged between the hinge points of the drill arm and the mounting seat, the fixing pipe is connected with a positioning rod in a sliding manner, one end of the supporting rod is hinged with the positioning rod, and the other end of the supporting rod is hinged with the drill arm. When the reamer bit is used, the angle of the drill arm can be flexibly adjusted by pressing the positioning rod, the hole diameter of a reaming hole can be accurately controlled according to actual repairing requirements, and the reamer bit is suitable for repairing scenes of coring holes of different sizes and depths; the formed horn mouth with the wide inside and the narrow outside can be embedded into original concrete like a tenon after concrete is poured, the combining capacity of new concrete and old concrete is greatly improved, and it is guaranteed that a repaired area is not prone to separation.
Owner:SICHUAN CHENGZHENG ENG TESTING TECH CO LTD

Multi-dimensional supporting leg structure for lightweight steel ring splicing equipment

The invention provides a multi-dimensional supporting leg structure for lightweight steel ring splicing equipment, and relates to the field of tunnel engineering. The mounting base is fixedly connected with the frame, the telescopic driving mechanism is arranged between the mounting base and the supporting leg assembly, the angle adjusting mechanism is arranged between the cylinder barrel and the mounting base, and the self-locking mechanism is used for locking the cylinder barrel and the piston rod when the driving unit fails. The telescopic driving mechanism is composed of a cylinder barrel, a piston rod and a driving unit, the angle adjusting mechanism is driven through a first rotating shaft and a second rotating shaft which are perpendicular to each other and corresponding rotation, so that the cylinder barrel achieves double-shaft swing adjustment, the self-locking mechanism is composed of a locking rack, a movable tooth claw, a reset spring, an electromagnet and a permanent magnet, and power-on unlocking and power-off self-locking are achieved. According to the structure, the supporting polygon is obviously enlarged under the complex basic condition, the anti-overturning stability of equipment is improved, reliable supporting is kept when a hydraulic system fails, and the safety and adaptability of steel ring splicing operation in a tunnel are improved.
Owner:WUHAN JINGSUI TECHNOLOGY CO LTD

Low-carbon high-performance self-sensing geopolymer composite material as well as preparation method and application thereof

The invention discloses a self-sensing geopolymer composite material, and belongs to the technical field of intelligent cement base material preparation. The raw materials comprise an alkaline exciting agent, standard sand, iron tailing sand, a silicon-aluminum mineral cementing material, short carbon fibers, water, a water reducing agent and a dispersing agent. The self-sensing geopolymer composite material has multiple conductive phases which can generate a composite effect which is not possessed by a single conductive phase when being used together, multiple conductive channels can generate a synergistic or multi-scale effect (long and short range synergistic conduction), the sensing stability (repeatability) is good, the noise is low, and the self-sensing geopolymer composite material has good application prospects. The requirement for the carbon fiber mixing amount when the conductive seepage threshold value is reached and the threshold value are optimized to a certain degree, and the cost can be saved. When the device is applied to tunnel engineering reinforcement of lining segments and sprayed concrete, a tunnel supporting effect can be achieved, damage of a tunnel structure can be sensed, sensing performance is achieved without additional sensing materials / devices, nondestructive testing of the structure is achieved, and therefore the safety of the structure is improved, and the service life of the structure is prolonged.
Owner:NORTH CHINA ELECTRIC POWER UNIV

Intelligent control system of deep well mining equipment

The invention belongs to the technical field of equipment control systems, and discloses a deep well mining equipment intelligent control system which comprises a multi-source data sensing module, a decision module and an equipment cooperative control module. The multi-source data sensing module comprises a distributed Internet of Things sensing unit, an InSAR remote sensing detection unit and a data fusion gateway unit. The decision-making module receives the multi-source signal and comprises a prediction unit, an optimization unit and a regulation and control unit, the prediction unit processes the multi-source signal and outputs a height prediction signal and an aquifer penetration risk signal, and the optimization unit processes the multi-source signal and the height prediction signal to obtain an optimal grouting signal; and the regulation and control unit defines a water retention constraint condition according to the multi-source signal and outputs a safe mining threshold value. According to the intelligent control system of the deep well mining equipment, the problems of water resource loss and pollution caused by traditional deep well mining operation can be solved.
Owner:BACKFILL ENGINEERING LABORATORY SHANDONG GOLD MINING TECHNOLOGY CO LTD +1

Method for treating shield tunnel diseases through trenchless perturbation external prestressing

The invention relates to a method for treating shield tunnel diseases through trenchless perturbation external prestressing, and belongs to the field of tunnel structures.The method comprises the steps that the spatial position of a tunnel structure is determined, and a first vertical shaft, a second vertical shaft and a vertical shaft supporting structure are constructed; constructing a first vertical hole, and pushing the prestressed stranded wire to the bottom of the first vertical hole; the stratum is locally reinforced, then a first operation opening and a second operation opening are formed through excavation, a telescopic rod is adopted to transversely penetrate through the stratum from the second operation opening to the first operation opening, and the prestress stranded wire is pulled back to the second operation opening; the stratum is locally reinforced and excavated to form a third operation opening, then a second vertical hole is formed, and the prestress stranded wire is pulled to the third operation opening from the second operation opening; the stratum is locally reinforced and excavated to form a tensioning operation opening, a telescopic rod is adopted to transversely penetrate through the stratum from the tensioning operation opening to a third operation opening, and the prestress stranded wire is pulled back to the tensioning operation opening; and the two ends of the prestress stranded wire penetrate into the anchoring system and are tensioned, so that external prestress is applied to the tunnel structure.
Owner:BEIJING URBAN CONSTRUCTION DESIGN & DEVELOPMENT GROUP CO LIMITED

Visualization grouting device for coal and rock fissures and test method

Disclosed are a visualization grouting device for coal and rock fissures and a test method, a test device including a visualization fissure grouting box body, a box body bracket, a grouting device and a monitoring device. A bottom plate is divided into four identical areas, rubber cushion blocks with different specifications are arranged to simulate different fissure widths and tortuosity, artificial protolith thin film is pasted inside, and a grouting hole and a plurality of pressure measuring holes are arranged in the center of the upper top plate. In the present disclosure, the grouting process of fissures under different grouting conditions, such as different fissure widths, roughness, grouting resistance and tortuosity of pore channels can be simulated, the grouting under different fissure conditions can be simultaneously simulated, and the differences of different grouting diffusion forms can be clearly and intuitively analyzed and compared through the visualization box body.
Owner:HENAN POLYTECHNIC UNIV

Gantry type integrated operation workstation capable of adapting to different underground cavern sections

The invention discloses a portal type integrated operation workstation capable of adapting to different underground cavern sections. The portal type integrated operation workstation comprises a frame supporting system, an intelligent control room, a moving walking system, an electrical system and a functional arm system. The frame supporting system comprises first longitudinal beams which are arranged in a left-right spaced mode, and a plurality of transverse telescopic joints are installed between the left first longitudinal beam and the right first longitudinal beam. A plurality of longitudinal shrinkage joints are mounted at the lower end of each first longitudinal beam, the lower ends of the longitudinal shrinkage joints are connected with a high-strength supporting frame, and a movable walking system is mounted at the bottom of the high-strength supporting frame; the functional arm system comprises a concrete spraying-arch mounting arm, an anchor rod mounting arm and a drilling arm which are arranged in a layered mode from top to bottom. According to the portal type integrated operation workstation capable of adapting to different underground cavern sections, the functions of drilling, anchor rod construction, grouting, net hanging, arch frame installation, spraying and mixing and the like are integrated, and meanwhile the size of equipment can be freely adjusted so that the portal type integrated operation workstation can adapt to the extra-large sections of different sizes.
Owner:CHINA GEZHOUBA GRP THREE GORGES CONSTR ENG CO LTD +1

Method for reducing concrete spraying rebound rate and concrete wet spraying equipment

The invention relates to the technical field of concrete construction, and discloses a method for reducing the concrete spraying rebound rate and a concrete wet spraying device.The method comprises the following steps that a fluid control model based on historical guniting data is established, the model is used for performing parameter matching on the concrete guniting volume and the spraying speed, the spraying pressure and the spraying temperature of the high-speed fluid; the real-time guniting volume of the concrete wet spraying equipment is collected; and according to the guniting volume and the control model, generating fluid jet control parameters matched with the guniting volume and the control model. And through an accurate fluid control model and a real-time feedback mechanism, the concrete spraying rebound rate is effectively reduced. And an automatic spraying parameter adjusting mechanism is adopted, so that the pressure, the angle and the spraying amount of the sprayed fluid are accurately adjusted according to real-time monitoring data, and the construction efficiency and the spraying consistency are improved. And through a high-precision rebound rate monitoring system, rebound data are automatically calculated and fed back, the spraying process is optimized, concrete waste is reduced, and the resource utilization rate is increased.
Owner:中交西安筑路机械有限公司

Modified coal gangue-based large-flow-state grouting and water plugging material and preparation method thereof

The invention provides a modified coal gangue-based large-flow-state grouting and water plugging material and a preparation method thereof. Comprising 80-90 parts of a coal gangue sample, 1-5 parts of Portland cement, 1-5 parts of sulphoaluminate cement, 0.51-3 parts of a polycarboxylic acid water reducing agent, 1-4 parts of cellulose ether with the viscosity of 200w, 0.1-5 parts of a calcium oxide expanding agent, 0.5-5 parts of a plastic expanding agent, 0.5-1 part of redispersible latex powder, 0.5-5 parts of polyacrylamide with the molecular weight of 1000 and water, and the water-material ratio is 0.4. According to the modified coal gangue-based large-flow-state grouting and water plugging material and the preparation method thereof, the cement consumption can be remarkably reduced, the cost is reduced, the utilization rate of solid wastes (such as coal gangue) is increased, and the material has good flow-state performance and adjustable setting time; the method is suitable for deep and large shaft surrounding rock water seepage treatment in coal mining and other mine engineering.
Owner:SHAANXI TONGREN APPLIED MATERIAL CO LTD

Underground gas storage chamber and construction method thereof

The invention belongs to the technical field of compressed air energy storage facilities, and particularly discloses an underground gas storage chamber and a construction method thereof.The underground gas storage chamber comprises a surrounding rock structure and a gas storage structure, the surrounding rock structure is provided with a storage space, and the gas storage structure is located in the storage space; the structure comprises a primary support, a lining layer, a sealing layer, a sliding layer and a lining layer which are sequentially arranged from outside to inside, a pressure reduction layer is arranged in the lining layer, the lining layer is divided into a first lining layer and a second lining layer by the pressure reduction layer, and the pressure reduction layer is made of a deformable material. A traditional single-layer lining layer is replaced by the double-layer lining layer, the pressure reduction layer is arranged between the double-layer lining layer and the double-layer lining layer, and dynamic loads caused by fluctuation of internal pressure of the gas storage are relieved through telescopic deformation of the pressure reduction layer, so that the risk that the lining layers crack is reduced, the service life of the underground gas storage chamber is prolonged, the advantages of reducing pressure and improving heat transfer are achieved, and the service life of the underground gas storage chamber is prolonged. And requirements of design on geology are reduced, and popularization and application are facilitated.
Owner:SHENZHEN RESEARCH INSTITUTE OF CHINA UNIVERSITY OF MINING & TECHNOLOGY

Mining receding energy absorption component and coal mine tunnel supporting structure and method

The invention discloses a mining receding energy-absorbing component and a coal mine roadway supporting structure and method, relates to the field of coal mine roadway supporting structures in underground engineering, solves the problem that large deformation and high bearing capacity cannot be unified in the roadway supporting process in the prior art, and has the beneficial effects that energy is fully absorbed, and the bearing capacity is guaranteed. According to the specific scheme, the mining receding energy-absorbing component comprises at least two energy-absorbing surface layers, every two adjacent energy-absorbing surface layers are connected through a supporting connecting rod, the supporting connecting rods have set rigidity, the energy-absorbing surface layers are made of flexible deformable materials, each energy-absorbing surface layer comprises a plurality of unit cell units, and the unit cell units are arranged in multiple rows and multiple columns. Every two adjacent unit cell units in each row are connected, every two adjacent unit cell units in each column are connected, each unit cell unit comprises a plurality of arc-shaped pieces, the opening direction of the arc-shaped pieces is far away from the center of the unit cell unit, the arc-shaped pieces are sequentially connected clockwise to form the unit cell unit, and every two adjacent unit cell units of the same energy absorption surface layer are connected through the arc-shaped pieces.
Owner:CHINA UNIV OF MINING & TECH (BEIJING)

Environment-friendly multi-arch underground excavation tunnel structure suitable for river-near cliff and construction method of environment-friendly multi-arch underground excavation tunnel structure

The invention discloses an environment-friendly multi-arch underground excavation tunnel structure suitable for a river-near cliff, and relates to the technical field of tunnel engineering. The lining structure comprises a left hole composite lining, a middle semi-integral middle wall and a right hole through underground excavation composite lining, the left hole composite lining comprises a left hole secondary lining and a left hole primary support from inside to outside; the right hole through type underground excavation composite lining comprises a right hole secondary lining, a right hole primary support, a bottom plate, a top supporting beam, a bottom longitudinal beam and an inclined column. Aiming at the vertical river-adjacent terrain, a full-underground excavation transparent multi-arch tunnel scheme is provided for the first time, bias pressure is resisted by means of self-stability of surrounding rock, excavation is small, environment friendliness is achieved, and the construction concept of green roads is met. The invention further relates to a construction method of the environment-friendly multi-arch underground excavation tunnel structure suitable for the river-near cliff.
Owner:CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD

Multifunctional integrated unit

The invention discloses a multifunctional all-in-one unit which comprises a rack, a tunneling part, a vertical arch part, an arch spraying part and a rock drilling part. A slag discharging channel is formed in the lower portion or at least one side of the rack. The tunneling part is arranged at the front end of the rack and used for tunneling excavation. The arching part is arranged on at least one side of the rack in a sliding mode and used for being matched with the arching part to conduct arching operation, the arching part and the rock drilling part are arranged on the rack in a sliding mode, the arching part is used for guniting operation and being matched with the arching part to conduct arching operation, and the rock drilling part is used for drilling operation; according to the scheme, the integrated trolley is integrated with multiple functions of excavation, erection, bolt anchoring, guniting, pumping and the like, a slagging-off machine and a slag car are arranged for deslagging, full-process construction of the tunnel face is completed, parallel processes or seamless connection of the processes is achieved, the traditional technological method that all the processes are independent and not parallel and work in a multi-machine cooperation mode is changed, the construction progress is greatly accelerated, and the construction efficiency is improved. And more values are created for customers.
Owner:SICHUAN LANHAI ENG EQUIP MFG CO LTD

Earthquake and geology fusion-based mine water prevention and control risk early warning method and system

The invention provides a mine water prevention and control risk early warning method and system based on earthquake and geology fusion, and belongs to the field of soil layer or rock drilling, the method comprises the steps that real-time earthquake data of an earthquake monitoring module and geological exploration data of a geological exploration module are received, and the geological exploration module comprises a drilling detection module and a hydrogeological analysis module; based on the real-time seismic data, the geological exploration data and a preset water prevention and control risk early warning model, obtaining a risk level including a risk level and a corresponding water prevention and control execution measure; triggering target execution equipment such as drilling equipment to perform prevention and treatment according to execution measures; drilling a monitoring hole and arranging an optical fiber osmometer to collect osmotic pressure data at a first risk grade; at the second risk level, grouting plugging is conducted on the crack drilling grouting holes; constructing a water guide hole in the aquifer at the third risk level, and guiding underground water to a safe area through a drainage pump group. According to the method, multi-source data are fused to realize graded accurate early warning and prevention.
Owner:INNER MONGOLIA HUANGTAOLEGAI COAL CO LTD SHI LIN CHEM BRANCH