The invention discloses a foundation settlement
observation method. The foundation settlement
observation method is characterized by observing the whole
ballast bed region by adopting a mode that a stack loading mode is combined with a settlement observation plate and a multi-point displacement meter; an embedding method of the multi-point displacement meter comprises the following steps: drilling and embedding after carrying out accurate survey setting out in a survey point position; placing a PVC (
Polyvinyl Chloride)
pipe, a PVC joint and a single-point settlement unit in the opening of a hole in sequence according to an installation sequence, and threading a pulling
rope; installing the PVC
pipe, the PVC joint and the single-point settlement unit through which the pulling
rope is threaded in the hole in sequence, and firmly connecting by using screws. According to the foundation settlement
observation method disclosed by the invention, the whole
ballast bed region is observed by adopting a mode that the stack loading mode is combined with the settlement observation plate and the multi-point displacement meter, curve-fitting prediction post-construction settlement is carried out according to an earth filling height-time-settlement
volume curve graph, the settlement volumes of different earth filling regions can be determined, the observation is accurate, the foundation settlement observation method is used for guiding the design and the construction, so that reasonable
engineering measures are ensured, and the investment is economical.