Radial cement-soil pile structure system of shield tunnel and construction method
By adopting radial cement soil pile structure system and mattress layer reinforcement technology in shield tunnels, the problem of insufficient reinforcement depth and large construction disturbances in soft soil areas is solved, and efficient and uniform reinforcement effect is achieved, reducing the efficiency and uniform reinforcement effect. Operation and maintenance costs.
Patent Information
- Application Number
- CN202410964209.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-11-15
AI Technical Summary
Shield tunnels have problems such as load-bearing capacity failure, long-term settlement, differential settlement, structural damage, waterproof failure and reduced durability in soft soil areas, especially the grouting and reinforcement depth of long pipes outside the hole, difficulty in handling deep soft soil, construction The problems of large disturbances in the surrounding soil and uneven quality control of cement piles.
The radial cement soil pile structure system of shield tunnel is adopted to form a synchronous grouting body by synchronous propulsion outside the tunnel, and the radial cement soil pile is formed from the inside and out of the tunnel by using the TJS method or MJS method, and the mattress layer reinforcement is combined with dynamic adjustment. The slurry discharge volume and the pressure in the hole accurately control the cutting soil boundary to form a solid solid with reliable quality and uniform quality.
Effective reinforcement of deep soft soil layers is achieved, the impact of construction on the tunnel structure and surrounding environment is reduced, the reinforcement depth is large and the quality is uniform, the operation and maintenance costs are reduced, and the long-term service performance of the tunnel is improved.
Smart Images

Figure CN118959022A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of shield tunnel construction, and in particular to a shield tunnel radial cement soil pile structure system and a construction method. Background Art
[0002] Soft soils with high sensitivity, low shear strength, high water content and high compressibility are widely distributed in my country's coastal areas along the river. The main problems faced by shield tunnels in soft soil areas are failure of bearing capacity, long-term settlement, differential settlement, structural damage, waterproof failure, and reduced durability. Statistics on the maintenance and repair costs of subway tunnels in a certain city over the years show that the operation and maintenance costs increase exponentially by about 5 times with the maintenance period. Early settlement control treatment of shield tunnels can improve the settlement control effect of operating tunnels and reduce subsequent subway operation and maintenance costs.
[0003] At present, there is a lack of treatment methods for shield tunnel settlement diseases. Usually, the soil on the side or below the underlying tunnel is reinforced on the ground. Ground reinforcement is limited by ground conditions, and the reinforcement body cannot be close to the tunnel structure. For example, channel-cut cement soil continuous wall (TRD method), three-axis cement mixing piles, high-pressure rotary jet piles, etc. are extremely difficult to construct in the case of densely distributed municipal pipelines or ground buildings (structures); and the full-section grouting reinforcement measures are used to reinforce the strata between the ground and the bottom of the tunnel. The project volume is large and the economy is low; therefore, effective settlement control measures can be taken on the shield tunnel structure to achieve the purpose of improving the long-term service performance of the tunnel.
[0004] Among the measures taken to reinforce the shield tunnel structure, long-tube grouting outside the tunnel is currently the most important and effective reinforcement technology. For strata with thin underlying soft soil, long-tube grouting can easily penetrate the silty soil layer for grouting construction, forming a circular reinforcement body with a certain diameter and length, so it has certain construction advantages in such strata.
[0005] However, long-tube grouting outside the tunnel has the following problems: the reinforcement depth is small, and it is difficult to deal with the thick soft soil under the tunnel; the construction outside the tunnel causes a large disturbance to the surrounding soil, and there is a risk of deformation of the tunnel; the quality control of cement-soil piles is uneven, and the quality of the reinforcement body is difficult to control. Summary of the invention
[0006] The purpose of the present invention is to solve the problems that the reinforcement depth of long-tube grouting outside the tunnel is small, it is difficult to handle the thick soft soil under the tunnel; the construction outside the tunnel causes great disturbance to the surrounding soil, and there is a risk of deformation of the tunnel; the quality control of cement soil piles is uneven, and the quality of the reinforcement body is difficult to control, and the like. A radial cement soil pile structure system and construction method for a shield tunnel are provided, which is suitable for the foundation reinforcement structure system for the construction inside the shield tunnel in soft soil areas, can meet the construction requirements in the thick soft soil layer, can dynamically adjust the slurry discharge and the pressure in the hole, accurately control the boundary of the cut soil, reduce the impact of the construction on the tunnel structure and the surrounding environment, effectively control the deformation of the tunnel, and have reliable and uniform quality, a large reinforcement depth, and reduce costs and increase efficiency.
[0007] The technical solution adopted by the present invention to achieve the first invention object is: a radial cement soil pile structure system of a shield tunnel, comprising: Shield tunnel, a main body of the system assembled from segments constructed using the shield method; Synchronous grouting body, which is constructed synchronously with the shield tunnel to form an additional body outside the shield tunnel and connected to the shield tunnel as a whole; Radial cement soil piles are formed from the inside of the shield tunnel to the outside using the TJS method or the MJS method, and the top of the foundation is connected to the synchronous grouting body; The cushion layer is a circumferential reinforcement body of the foundation located on the top of the radial cement soil pile and connected to the synchronous grouting body.
[0008] The radial cement soil pile structure system of the shield tunnel forms a synchronous grouting body by synchronously advancing outside the shield tunnel. The synchronous grouting body is formed between the shield tunnel and the foundation, so that the shield tunnel and the surrounding foundation are more tightly and firmly connected. In order to realize the reinforcement of the thick soft soil layer around the shield tunnel and increase the reinforcement depth, the high-pressure grouting system TJS method in the shield tunnel or the miniaturized MJS method in the tunnel is used to grout from the inside of the shield tunnel to the outside to form a number of radial cement soil piles. At the same time, a cushion layer is formed at the connection between the radial cement soil pile and the synchronous grouting body, so that the radial cement soil pile and the shield tunnel are effectively connected as a whole. A number of radial cement soil piles and annular cushions constitute the foundation reinforcement structure system of the shield tunnel. The cement soil piles formed by the TJS method or the MJS method can meet the construction requirements in deep soft soil layers. The radial cement soil piles formed are reliable, uniform in quality, and have a large reinforcement depth. The diameter and strength of the cement soil piles are basically consistent along the depth direction, which effectively solves the problem of insufficient reinforcement depth at the bottom of the tunnel. The TJS method or the MJS method can dynamically adjust the slurry discharge and the hole pressure, accurately control the boundary of the cut soil, reduce the impact of the construction on the tunnel structure and the surrounding environment, and realize micro-disturbance control throughout the process.
[0009] Preferably, the pile axis of the radial cement soil pile passes through the center of the shield tunnel. The pile water axis of the radial cement soil pile passes through the center of the shield tunnel, which can increase the pressure bearing strength and has a good reinforcement effect.
[0010] Preferably, the radial cement soil piles include vertical cement soil piles and inclined cement soil piles. The radial cement soil piles are divided into vertical cement soil piles and inclined cement soil piles according to the angle between the pile axis and the horizontal direction. The number, diameter and length of the vertical cement soil piles and the inclined cement soil piles are set according to design requirements to meet the requirements of different shield tunnel foundation reinforcement.
[0011] Preferably, the angle θ between the axis of the inclined cement soil pile and the horizontal direction is greater than or equal to 30°. By designing the angle θ between the axis of the inclined cement soil pile and the horizontal direction to be greater than or equal to 30°, the foundation of the shield tunnel can be better reinforced, the bearing capacity is strong, and the reinforcement effect is better.
[0012] Preferably, the radial cement soil piles are arranged in each ring, in every other ring, or in a plum blossom shape. The radial cement soil piles can be arranged in any manner as required, for example, in each ring, in every other ring, or in a plum blossom shape. The radial cement soil piles can be arranged in any direction of the shield tunnel circumference as required for reinforcement.
[0013] As a preferred embodiment, the cushion layer is a circumferential grouting body formed by synchronous grouting around the tunnel. As a preferred embodiment, the cushion layer can be a synchronous grouting body formed by synchronous grouting around the tunnel.
[0014] Preferably, the cushion layer is a circumferential grouting body formed by secondary grouting around the tunnel. As another preferred solution, the cushion layer can also be a secondary grouting body formed by secondary grouting around the tunnel.
[0015] Preferably, the cushion layer is an annular grouting body formed by TJS construction method. As a more preferred solution, the cushion layer is an annular grouting body formed outside the shield tunnel when grouting radial cement soil piles by TJS construction method of high pressure grouting system in shield tunnel, which can realize annular connection between multiple radial cement soil piles and effectively improve the overall quality and settlement control effect of radial cement soil piles in shield tunnel.
[0016] Preferably, the cushion layer is an annular grouting body formed by the MJS method. As a more preferred solution, the cushion layer is an annular grouting body formed on the outside of the shield tunnel when the radial cement soil piles are grouted by the miniaturized MJS method in the tunnel, which can realize the annular connection between multiple radial cement soil piles and effectively improve the overall quality and settlement control effect of the radial cement soil piles in the shield tunnel.
[0017] The technical solution adopted by the present invention to achieve the second invention object is: a construction method of a radial cement soil pile structure system of a shield tunnel, comprising the following steps: Step 1: Conduct theoretical design and verification of the foundation bearing capacity, foundation deformation, tunnel structure internal force and deformation, and structure of the radial cement soil pile structure system of the shield tunnel; Step 2: Design the radial cement soil pile distribution pattern of the shield tunnel; Step 3: assembling the segments by the shield method to form a shield tunnel, and synchronously advancing grouting construction with the shield tunnel 1 to form a synchronous grouting body; Step 4: According to the designed number and distribution of radial cement soil piles, reserve grouting holes on the shield tunnel segments; Step 5: Inside the shield tunnel, radial cement soil piles are formed through grouting holes by using TJS method or MJS method micro-disturbance control; Step 6: When the radial cement soil pile is grouted to the synchronous grouting body in step 5, a TJS method or an MJS method is used to form a circumferential cushion layer, or a synchronous grouting body or a secondary grouting body is used to form a cushion layer; Step 7: Complete the construction of radial cement soil piles and cushion layers on the outside of the entire shield tunnel in sequence, and finally form a radial cement soil pile structure system for the shield tunnel.
[0018] The construction method of the radial cement-soil pile structure system of the shield tunnel adopts the micro-disturbance control of the TJS method or the MJS method, and the micro-disturbance control is carried out throughout the construction process. The foundation reinforcement formed after the construction has a good settlement control effect, which reduces engineering waste and can meet the construction requirements in deep soft soil layers. The slurry discharge and the hole pressure can be dynamically adjusted according to the actual needs of the project, and the boundary of the cut soil can be accurately controlled to reduce the impact of the construction on the tunnel structure and the surrounding environment, effectively control the deformation of the tunnel, and have reliable and uniform quality, a large reinforcement depth, and reduce costs and increase efficiency.
[0019] The beneficial effects of the present invention are as follows: the radial cement soil pile structural system of the shield tunnel has a large reinforcement depth, reliable pile quality, micro-disturbance control during the entire construction process, and a good control effect of the settlement of the foundation reinforcement body formed after the construction. The addition of a cushion layer can realize the circumferential connection between multiple radial cement soil piles, which can effectively improve the overall quality and control effect of the radial cement soil piles of the shield tunnel. The project has good economic efficiency, and can realize precise control of the construction of the reinforcement body according to the actual needs of the project, thereby reducing project waste. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a structural schematic diagram of the radial cement soil pile structure system of the shield tunnel of the present invention.
[0021] Figure 2It is a second structural schematic diagram of the radial cement soil pile structure system of the shield tunnel of the present invention.
[0022] Figure 3 It is a schematic diagram of the third structure of the radial cement soil pile structure system of the shield tunnel of the present invention.
[0023] Figure 4 This is the fourth structural schematic diagram of the radial cement soil pile structure system of the shield tunnel of the present invention.
[0024] Figure 5 It is a structural schematic diagram of the arrangement of each ring of radial cement soil piles in the present invention.
[0025] Figure 6 It is a structural schematic diagram of the radial cement soil pile spacer ring arrangement in the present invention.
[0026] Figure 7 It is a structural schematic diagram of the plum blossom-shaped arrangement of radial cement soil piles in the present invention.
[0027] Figure 8 It is a structural schematic diagram of the construction process of the radial cement soil pile structure system of the shield tunnel of the present invention.
[0028] In the figure: 1. shield tunnel, 2. synchronous grouting body, 3. cushion layer, 4. radial cement soil piles, 5. vertical cement soil piles, 6. inclined cement soil piles, 7. pipe segments, 8. grouting holes. DETAILED DESCRIPTION
[0029] The various aspects of the present invention are described in detail below through specific embodiments in conjunction with the accompanying drawings.
[0030] Embodiment 1: exist Figure 1 In the embodiment shown, a shield tunnel radial cement soil pile structure system is constructed by a high pressure grouting system (TJS method) in a shield tunnel, and includes a shield tunnel 1 and a synchronous grouting body 2, and an annular cushion layer 3 and radial cement soil piles 4 are fixedly connected to the synchronous grouting body on the outside of the synchronous grouting body.
[0031] The radial cement soil piles 4 and the cushion layer 3 are constructed by using a high pressure grouting system (TJS method) in a shield tunnel.
[0032] The cushion layer 3 is a circumferential grouting body formed by synchronous grouting around the tunnel, secondary grouting, or a high-pressure grouting system in a shield tunnel, or a miniaturized MJS method in the tunnel. The cushion layer 3 is located on the top of the radial cement soil pile 4 and has a certain thickness and is a reinforcement body close to the outer edge of the tunnel structure. In this embodiment, the circumferential cushion layer 3 is formed by a high-pressure grouting system in a shield tunnel.
[0033] The radial cement soil pile 4 is a cement soil pile whose pile axis L passes through the center a of the shield tunnel.
[0034] The radial cement soil pile 4 is divided into a vertical cement soil pile 5 and an inclined cement soil pile 6 according to the angle θ between the pile shaft axis L and the horizontal direction. The number, diameter and length of the vertical cement soil pile 5 and the inclined cement soil pile 6 are set according to design requirements.
[0035] The inner diameter of the shield tunnel 1 is usually greater than 5.0 m, and is assembled from segments 7 constructed using the shield method.
[0036] The synchronous grouting body 2 is generally 100 mm to 150 mm thick and is constructed synchronously with the shield tunnel 1 and formed between the outer side of the shield tunnel and the foundation to enhance the strength of the shield tunnel.
[0037] The thickness of the annular cushion layer 3 is generally not less than 0.5 times the maximum diameter of the radial cement soil pile 4.
[0038] The radial cement soil piles 4 include vertical cement soil piles 5 and inclined cement soil piles 6 .
[0039] The cement soil length of the radial cement soil pile 4 is generally not more than 20m, the diameter of the vertical cement soil pile 5 is 800mm-1500mm, the diameter of the inclined cement soil pile 6 is 600mm-1200mm, and the inclination angle θ is greater than 30°.
[0040] The synchronous grouting body 2, the annular cushion layer 3 and the radial cement soil piles 4 are all cement soil, and the cement strength grade is generally not less than 42.5 grade ordinary Portland cement.
[0041] like Figure 8 As shown, a construction method of a radial cement soil pile structure system of a shield tunnel comprises the following steps: Step 1: Conduct theoretical design and verification of the foundation bearing capacity, foundation deformation, tunnel structure internal force and deformation, and structure of the shield tunnel radial cement soil pile structure system: The design of radial cement-soil pile structure system of shield tunnel includes four parts: foundation bearing capacity verification, foundation deformation verification, tunnel structure internal force and deformation verification and structural design requirements.
[0042] 1. Verification of foundation bearing capacity: When controlling vertical deformation, the characteristic value of the radial bearing capacity of the inclined cement soil pile 6 is the same as the compressive bearing capacity of the vertical cement soil pile 5. The verification of the foundation bearing capacity after reinforcement should comply with formula (1) and formula (2): 1.5f ak ≥f spk ≥1.1f ak (1) f spk =mRa / A p +ξ(1-m)f ak (2) Where: f spk ——Eigenvalue of foundation bearing capacity after tunnel reinforcement and depth correction (kPa), with the correction factor being 1.0; f ak ——The characteristic value of natural foundation bearing capacity after depth correction (kPa), with the correction factor being 1.0; m——Radial cement-soil pile replacement rate. When the radial bearing capacity characteristic value of the inclined cement-soil pile is less than the compressive bearing capacity of the vertical cement-soil pile, the cross-sectional area can be reduced in proportion to the bearing capacity. Ra——characteristic value of compressive bearing capacity of a single vertical cement-soil pile (kN); A p ——Vertical cement soil pile single pile cross-sectional area (m 2 ); ξ——reduction coefficient of the disturbance of the soil around the tunnel caused by shield construction, ranging from 0.2 to 0.8, with a smaller value being taken when the soil sensitivity is high.
[0043] 2. Verification of foundation bearing capacity: When tunnel settlement develops due to increased ground load, the bearing capacity calculation of the reinforced foundation should not only meet the requirements of equations (1) and (2), but also meet the requirements of equations (3) and (4): f spk ≥ σ cz + p0 (3) Where: cz ——Self-weight stress value of soil at the tunnel top (kPa); p0——Additional pressure value at the bottom of the tunnel (kPa); γ i ——Natural density of the i-th layer of soil above the tunnel top (kN / m 3 ), below the groundwater level according to the floating density; h i ——thickness of the i-th soil layer above the tunnel top (m); n is the number of soil layers above the tunnel top.
[0044] 3. Verification of foundation deformation: The foundation deformation verification should comply with formula (5): Where: s——deformation of the tunnel bottom soil layer after reinforcement (mm); H——Thickness of disturbed soil at the bottom of the tunnel (mm), which should be determined according to local experience. If there is no experience, 0.5D~1.5D can be used; E p ——Compression modulus of vertical cement soil pile (kPa); E s ——Compression modulus of original soil at tunnel bottom (kPa).
[0045] 4. Tunnel structure internal force and deformation verification: The internal force and deformation of tunnel structures should be analyzed using the continuum finite element method.
[0046] 5. Structural design requirements: The structural design requires that the diameter, length, cement content, plane layout and radial layout of the radial cement soil pile 4 should be comprehensively determined based on the verification results.
[0047] Step 2: Design the radial cement soil pile distribution pattern of the shield tunnel: The radial cement soil pile 4 distribution pattern outside the shield tunnel 1 can be designed according to actual engineering needs.
[0048] like Figure 2 As shown, when used for vertical deformation control, the radial cement soil piles 4 should be arranged in an overall symmetrical and balanced manner, and one vertical cement soil pile 5 and two inclined cement soil piles 6 can be arranged in each ring.
[0049] like Figure 3 As shown, when the reinforcement requirement is high, the radial cement soil piles 4 should be appropriately added according to the number and position of the reserved grouting holes 8 of the segments 7 of the shield tunnel 1, and one vertical cement soil pile 5 and four inclined cement soil piles 6 can be arranged in each ring.
[0050] like Figure 4 As shown, when the surrounding environment protection requirements are high or the tunnel deformation control is strict, radial cement soil 4 can be driven on the top and ring of the shield tunnel 1 to achieve the purpose of deformation control. For example, two vertical cement soil piles 5 and multiple inclined cement soil piles 6 can be arranged in each ring.
[0051] The radial cement soil piles 4 can be arranged in a ring according to the design requirements (see Figure 5 ), that is, radial cement soil piles are arranged on each ring; spacer ring arrangement (see Figure 6 ), that is, radial cement soil piles are arranged every other ring; plum blossom type arrangement (see Figure 7 ), that is, vertical cement soil piles are laid on the previous ring, and inclined cement soil piles are laid on the adjacent subsequent ring, etc. The specific form should be determined comprehensively based on the calculation results.
[0052] Step 3: According to the design requirements of step 1, the shield method is used to assemble the segments to form a shield tunnel 1, and a synchronous grouting construction is carried out on the outside of the shield tunnel 1 and the shield tunnel 1 to form a synchronous grouting body 2 with a thickness of 100 mm to 150 mm; Step 4: according to the designed number and distribution of radial cement soil piles, grouting holes 8 are reserved on the segments of the shield tunnel; Step 5: Inside the shield tunnel 1, a high-pressure grouting system in the shield tunnel or a miniaturized MJS (metrojet system) method in the tunnel is used to form radial cement soil piles 4 through grouting holes; Step 6: When the radial cement soil piles 4 are grouting to the synchronous grouting body 2 outside the shield tunnel, synchronous grouting forms an annular cushion layer 3; Step 7: Complete the construction of radial cement soil piles outside the entire shield tunnel in sequence, and finally form a shield tunnel radial cement soil pile structure system with reliable quality, uniform quality, large reinforcement depth, and cement soil pile diameter and strength basically consistent along the depth direction.
[0053] Embodiment 2: In this embodiment, a shield tunnel radial cement soil pile structure system is formed by a miniaturized MJS construction method in the tunnel, including a shield tunnel 1 and a synchronous grouting body 2, and an annular cushion layer 3 and radial cement soil piles 4 are fixedly connected to the synchronous grouting body outside the synchronous grouting body.
[0054] The radial cement soil piles 4 and the cushion layer 3 are formed by using a miniaturized MJS construction method in a hole.
[0055] The cushion layer 3 is a circumferential grouting body formed by miniaturized MJS construction method in the tunnel. The cushion layer 3 is located on the top of the radial cement soil pile 4 and has a certain thickness and is close to the outer edge of the tunnel structure. In this embodiment, the circumferential cushion layer 3 is formed by synchronous advancement grouting construction.
[0056] The radial cement soil pile 4 is a cement soil pile whose pile axis L passes through the center a of the tunnel structure.
[0057] The radial cement soil pile 4 is divided into a vertical cement soil pile 5 and an inclined cement soil pile 6 according to the angle θ between the pile shaft axis L and the horizontal direction. The number, diameter and length of the vertical cement soil pile 5 and the inclined cement soil pile 6 are set according to design requirements.
[0058] The inner diameter of the shield tunnel 1 is usually greater than 5.0 m, and is assembled from segments 7 constructed using the shield method.
[0059] The synchronous grouting body 2 is generally 100 mm to 150 mm thick and is formed synchronously with the shield tunnel 1 to enhance the strength of the shield tunnel.
[0060] The thickness of the annular cushion layer 3 is generally not less than 0.5 times the maximum diameter of the radial cement soil pile 4.
[0061] The radial cement soil piles 4 include vertical cement soil piles 5 and inclined cement soil piles 6 .
[0062] The cement soil length of the radial cement soil pile 4 is generally not more than 20m, the diameter of the vertical cement soil pile 5 is 800mm-1500mm, the diameter of the inclined cement soil pile 6 is 600mm-1200mm, and the inclination angle θ is greater than or equal to 30°. In this embodiment, the inclination angle θ is greater than 30°.
[0063] The synchronous grouting body 2, the annular cushion layer 3 and the radial cement soil piles 4 are all cement soil, and the cement strength grade is generally not less than 42.5 grade ordinary Portland cement.
[0064] A construction method for a radial cement soil pile structure system of a shield tunnel comprises the following steps: Step 1: Conduct theoretical design and verification of the foundation bearing capacity, foundation deformation, tunnel structure internal force and deformation, and structure of the shield tunnel radial cement soil pile structure system: The design of radial cement-soil pile structure system of shield tunnel includes four parts: foundation bearing capacity verification, foundation deformation verification, tunnel structure internal force and deformation verification and structural design requirements.
[0065] 1. Verification of foundation bearing capacity: When controlling vertical deformation, the characteristic value of the radial bearing capacity of the inclined cement soil pile 6 is the same as the compressive bearing capacity of the vertical cement soil pile 5. The verification of the foundation bearing capacity after reinforcement should comply with formula (1) and formula (2): 1.5f ak ≥f spk ≥1.1f ak (1) f spk =mR a / A p +ξ(1-m)f ak (2) Where: f spk ——Eigenvalue of foundation bearing capacity after tunnel reinforcement and depth correction (kPa), with the correction factor being 1.0; f ak ——The characteristic value of natural foundation bearing capacity after depth correction (kPa), with the correction factor being 1.0; m——Radial cement-soil pile replacement rate. When the radial bearing capacity characteristic value of the inclined cement-soil pile is less than the compressive bearing capacity of the vertical cement-soil pile, the cross-sectional area can be reduced in proportion to the bearing capacity. Ra——characteristic value of compressive bearing capacity of a single vertical cement-soil pile (kN); A p ——Vertical cement soil pile single pile cross-sectional area (m 2 ); ξ——reduction coefficient of the disturbance of the soil around the tunnel caused by shield construction, ranging from 0.2 to 0.8, with a smaller value being taken when the soil sensitivity is high.
[0066] 2. Verification of foundation bearing capacity: When tunnel settlement develops due to increased ground load, the bearing capacity calculation of the reinforced foundation should not only meet the requirements of equations (1) and (2), but also meet the requirements of equations (3) and (4): f spk ≥ σ cz + p0 (3) Where: cz ——Self-weight stress value of soil at the tunnel top (kPa); p0——Additional pressure value at the bottom of the tunnel (kPa); γ i ——Natural density of the i-th layer of soil above the tunnel top (kN / m 3 ), below the groundwater level according to the floating density; h i ——thickness of the i-th soil layer above the tunnel top (m); n is the number of soil layers above the tunnel top.
[0067] 3. Verification of foundation deformation: The foundation deformation verification should comply with formula (5): Where: s——deformation of the tunnel bottom soil layer after reinforcement (mm); H——Thickness of disturbed soil at the bottom of the tunnel (mm), which should be determined according to local experience. If there is no experience, 0.5D~1.5D can be used; E p ——Compression modulus of vertical cement soil pile (kPa); E s ——Compression modulus of original soil at tunnel bottom (kPa).
[0068] 4. Tunnel structure internal force and deformation verification: The internal force and deformation of tunnel structures should be analyzed using the continuum finite element method.
[0069] 5. Structural design requirements: The structural design requires that the diameter, length, cement content, plane layout and radial layout of the radial cement soil pile 4 should be comprehensively determined based on the verification results.
[0070] Step 2: Design the radial cement soil pile distribution pattern of the shield tunnel: The radial cement soil pile 4 distribution pattern outside the shield tunnel 1 can be designed according to actual engineering needs.
[0071] In another embodiment, when used for vertical deformation control, the radial cement soil piles 4 are preferably arranged in an overall symmetrical and balanced manner, and one vertical cement soil pile 5 and two inclined cement soil piles 6 may be arranged in each ring.
[0072] In another embodiment, when the reinforcement requirement is higher, radial cement soil piles 4 should be appropriately added according to the number and position of the reserved grouting holes 8 in the segments 7 of the shield tunnel 1, and one vertical cement soil pile 5 and four inclined cement soil piles 6 can be arranged in each ring.
[0073] In another embodiment, when the surrounding environment protection requirements are high or the tunnel deformation control is strict, radial cement soil 4 can be driven on the top and in the ring of the shield tunnel 1 to achieve the purpose of deformation control. For example, two vertical cement soil piles 5 and multiple inclined cement soil piles 6 can be arranged in each ring.
[0074] In other embodiments, the radial cement soil piles 4 can be arranged in each ring according to design requirements, that is, vertical cement soil piles 5 and inclined cement soil piles 6 are evenly arranged on each ring; or arranged in alternate rings, that is, vertical cement soil piles 5 are arranged in the previous ring, and then inclined cement soil piles 6 are arranged on the next ring after a ring interval; plum blossom arrangement, that is, vertical cement soil piles are arranged on the previous ring, and inclined cement soil piles are arranged on the adjacent next ring, etc. Various forms should be determined in combination with calculation results.
[0075] Step 3: According to the design requirements of step 1, the shield method is used to assemble the segments to form a shield tunnel 1, and a synchronous grouting construction is carried out on the outside of the shield tunnel 1 and the shield tunnel 1 to form a synchronous grouting body 2 with a thickness of 100 mm to 150 mm; Step 4: according to the designed number and distribution of radial cement soil piles, grouting holes 8 are reserved on the segments of the shield tunnel; Step 5: inside the shield tunnel 1, radial cement soil piles 4 are formed through grouting holes using a miniaturized MJS (metro jet system) method in the tunnel; Step 6: When the radial cement soil piles 4 are grouting to the synchronous grouting body 2 outside the shield tunnel, synchronous grouting forms an annular cushion layer 3; Step 7: Complete the construction of radial cement soil piles outside the entire shield tunnel in sequence, and finally form a shield tunnel radial cement soil pile structure system with reliable quality, uniform quality, large reinforcement depth, and cement soil pile diameter and strength basically consistent along the depth direction.
[0076] In this embodiment, the in-tunnel miniaturized MJS (metro jet system) construction method is adopted. Since the construction period of the miniaturized MJS is long, and the radial cement soil piles formed by the construction cannot form an effective connection, which is not conducive to the control of tunnel deformation, this method is mainly suitable for occasions where there are no special requirements for the construction period and the deformation control of the shield tunnel is not particularly strict.
[0077] Embodiment 3: The present embodiment provides a shield tunnel radial cement soil pile structure system, and its technical solution is basically the same as the technical solution in Embodiment 1 and Embodiment 2, except that: the cushion layer 3 is an annular grouting body formed by synchronous grouting body around the tunnel.
[0078] A construction method for a radial cement soil pile structure system of a shield tunnel, characterized by comprising the following steps: Step 1: Conduct theoretical design and verification of the foundation bearing capacity, foundation deformation, tunnel structure internal force and deformation, and structure of the radial cement soil pile structure system of the shield tunnel; Step 2: Design the radial cement soil pile distribution pattern of the shield tunnel; Step 3: assembling the segments by shield method to form a shield tunnel 1, and performing synchronous grouting construction with the shield tunnel 1 outside the shield tunnel 1 to form a synchronous grouting body 2; Step 4: according to the designed number and distribution of radial cement soil piles, grouting holes 8 are reserved on the segments of the shield tunnel; Step 5: inside the shield tunnel 1, radial cement soil piles 4 are formed through grouting holes by using TJS method or MJS method micro-disturbance control; Step 6: using synchronous grouting to form a cushion layer 3; Step 7: Complete the construction of radial cement soil piles and cushion layer 3 outside the entire shield tunnel in sequence, and finally form a radial cement soil pile structure system of the shield tunnel.
[0079] Embodiment 4: The present embodiment provides a shield tunnel radial cement soil pile structure system, and its technical solution is basically the same as the technical solution in Embodiment 1 and Embodiment 2, except that: the cushion layer 3 is an annular grouting body formed by secondary grouting body around the tunnel.
[0080] A construction method for a radial cement soil pile structure system of a shield tunnel comprises the following steps: Step 1: Conduct theoretical design and verification of the foundation bearing capacity, foundation deformation, tunnel structure internal force and deformation, and structure of the radial cement soil pile structure system of the shield tunnel; Step 2: Design the radial cement soil pile distribution pattern of the shield tunnel; Step 3: assembling the segments by shield method to form a shield tunnel 1, and performing synchronous grouting construction with the shield tunnel 1 outside the shield tunnel 1 to form a synchronous grouting body 2; Step 4: according to the designed number and distribution of radial cement soil piles, grouting holes 8 are reserved on the segments of the shield tunnel; Step 5: inside the shield tunnel 1, radial cement soil piles 4 are formed through grouting holes by using TJS method or MJS method micro-disturbance control; Step 6: using secondary grouting to form a cushion layer 3; Step 7: Complete the construction of radial cement soil piles and cushion layer 3 outside the entire shield tunnel in sequence, and finally form a radial cement soil pile structure system of the shield tunnel.
[0081] The radial cement soil pile structure system of the shield tunnel described in the above embodiment, the cement soil pile formed by the TJS method or the MJS method can meet the construction requirements in the deep soft soil layer. It can solve the problems of insufficient reinforcement depth such as the small reinforcement depth at the bottom of the tunnel, and the difficulty in handling the deep soft soil under the tunnel. The construction of the TJS method or the MJS method can dynamically adjust the slurry discharge and the pressure in the hole, accurately control the boundary of the cut soil body, reduce the impact of the construction on the tunnel structure and the surrounding environment, and realize the micro-disturbance control of the whole process, which effectively solves the problems of large disturbance of the surrounding soil body by the construction outside the tunnel and the risk of deformation of the tunnel. The cement soil pile formed by the TJS method or the MJS method is reliable in quality, uniform in quality, and large in reinforcement depth. The diameter and strength of the cement soil pile are basically consistent along the depth direction. It effectively solves the problems of uneven quality control of cement soil piles and difficult control of the quality of the reinforcement body.
[0082] The above specific implementation modes / embodiments are specific implementation modes of the present invention, which are used to illustrate the concept of the present invention, are explanatory and exemplary, and should not be interpreted as limiting the implementation modes of the present invention and the scope of the present invention. In addition to the embodiments described herein, those skilled in the art can also adopt other obvious technical solutions based on the contents disclosed in the claims and the specification of this application, and these technical solutions include any obvious replacement and modification of the embodiments described herein, which are within the protection scope of the present invention.
Claims
1. A radial cement soil pile structure system for a shield tunnel. Features include: A shield tunnel (1), a main body of the system assembled from segments (7) constructed using a shield method; A synchronous grouting body (2) is constructed synchronously with the shield tunnel (1) to form an additional body outside the shield tunnel and connected to the shield tunnel as a whole; Radial cement soil piles (4), which are formed from inside the shield tunnel to the outside by using the TJS method or the MJS method, and are radial reinforcement bodies of the foundation connected to the synchronous grouting body (2) at the top; The cushion layer (3) is a circumferential reinforcement body of the foundation located on the top of the radial cement soil pile (4) and connected to the synchronous grouting body (2) as a whole.
2. The shield tunnel radial cement soil pile structure system according to claim 1, Features: The pile axis of the radial cement soil pile (4) passes through the center of the shield tunnel.
3. The shield tunnel radial cement soil pile structure system according to claim 1, Features: The radial cement soil pile (4) comprises a vertical cement soil pile (5) and an inclined cement soil pile (6).
4. The shield tunnel radial cement soil pile structure system according to claim 1, Features: The angle θ between the pile axis of the inclined cement soil pile (6) and the horizontal direction is greater than or equal to 30°.
5. The shield tunnel radial cement soil pile structure system according to any one of claims 1 to 4, Features: The radial cement soil piles (4) are arranged in a ring arrangement, a spaced ring arrangement or a plum blossom arrangement.
6. The shield tunnel radial cement soil pile structure system according to any one of claims 1 to 4, Features: The cushion layer (3) is a circumferential grouting body formed by synchronous grouting around the tunnel.
7. The shield tunnel radial cement soil pile structure system according to any one of claims 1 to 4, Features: The cushion layer (3) is a circumferential grouting body formed by secondary grouting body around the tunnel.
8. The shield tunnel radial cement soil pile structure system according to any one of claims 1 to 4, Features: The cushion layer (3) is a circumferential grouting body formed by TJS construction method.
9. The shield tunnel radial cement soil pile structure system according to any one of claims 1 to 4, Features: The cushion layer (3) is a circumferential grouting body formed by using the MJS construction method.
10. A construction method for a radial cement soil pile structure system of a shield tunnel according to any one of claims 1 to 9, Features The following steps are involved: Step 1: Conduct theoretical design and verification of the foundation bearing capacity, foundation deformation, tunnel structure internal force and deformation, and structure of the radial cement soil pile structure system of the shield tunnel; Step 2: Design the radial cement soil pile distribution pattern of the shield tunnel; Step 3: assembling the segments by shield method to form a shield tunnel (1), and carrying out synchronous grouting construction with the shield tunnel (1) outside the shield tunnel (1) to form a synchronous grouting body (2); Step 4: according to the designed number and distribution of radial cement soil piles (4), grouting holes (8) are reserved on the segments (7) of the shield tunnel (1); Step 5: Inside the shield tunnel (1), radial cement soil piles (4) are formed through grouting holes by using a TJS method or an MJS method for micro-disturbance control; Step 6: when the radial cement soil piles are grouted to the synchronous grouting body (2) in step 5, a TJS method or an MJS method is used to form a circumferential cushion layer (3) or a synchronous grouting body or a secondary grouting body is used to form the cushion layer (3); Step 7: Complete the construction of radial cement soil piles (4) and cushion layers (3) outside the entire shield tunnel in sequence, and finally form a radial cement soil pile structure system of the shield tunnel.
Citation Information
Cited By
Reinforcing structure for shield tunnel and reinforcing method for shield tunnel
CN119531885A
Reinforcing structure for shield tunnel and reinforcing method for shield tunnel
CN119531885B
Reinforcing method suitable for CT connector segment large-diameter shield tunnel in soft soil stratum
CN120739547A
Reinforcing method for large-diameter shield tunnel with soft soil layer and jointed segments
CN120739547B
Shield tunnel deformation overrun correction pile group and correction method
CN120845044A