Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

1564results about How to "Optimization" patented technology

Network security evaluation system and method based on dynamic attack and defense game model

ActiveCN119544307AImprove real-time performanceDynamically adjust defense strategiesSecuring communicationAttackSimulation
The invention belongs to the field of network security, and discloses a network security evaluation system and method based on a dynamic attack and defense game model, and the evaluation system comprises four functional modules of attack and defense game construction, risk prediction, dynamic defense optimization and security situation awareness. According to the method, the idea of dynamic attack and defense game is introduced, multi-level and multi-scene attack and defense simulation is carried out according to historical states, strategy data and real-time data, and the optimal attack path and attack strategy are calculated and analyzed through a game equilibrium solution; according to the method, network resources and network security resources are dynamically adjusted by relying on reinforcement learning and deep learning technologies and a defense rule base generated by pre-training, network configuration is optimized according to a real-time evaluation result, and waste of system resources is reduced. By implementing the system and the method provided by the invention, the security of the target network can be dynamically evaluated, the security defense strategy of the network can be adjusted in real time, and unknown attacks such as advanced persistent threat (APT) and zero-day attack can be effectively resisted.
Owner:CHINESE PEOPLES LIBERATION ARMY 92493 UNIT INFORMATION TECH CENT

Distributed new energy storage optimal configuration method and system for power distribution network

The invention discloses a distributed new energy storage optimal configuration method and system for a power distribution network, and the method comprises the following steps: building a load prediction model through employing a probability discretization method according to historical power utilization data and real-time weather data; according to load demand data output by the load prediction model, a multi-target optimization model is constructed by taking maximization of distributed new energy power generation utilization rate, minimization of distributed new energy storage energy loss and minimization of operation cost of energy storage and scheduling as optimization targets; according to the multi-objective optimization model, adjusting weight distribution of the three optimization objectives, gradually optimizing power distribution between new energy power generation and energy storage, and generating an optimal new energy complementation strategy; charging and discharging are adjusted according to the optimal new energy complementation strategy, the health state, the battery temperature, the number of charging and discharging cycles, the environment temperature and the load demand change of energy storage equipment are collected in real time, and new energy power generation and energy storage configuration is optimized by dynamically comparing multiple indexes under different energy storage configurations in combination with power grid frequency fluctuation.
Owner:NANJING SUYI IND +1

New energy station operation intelligent management method and system

The invention provides a new energy station operation intelligent management method and system, and relates to the technical field of new energy station operation, and the method comprises the steps: collecting various data in real time through a sensor and monitoring equipment in a new energy station; transmitting the collected data to a central data center, carrying out iterative optimization processing, and determining final data classification, cleaning and compression parameter combination so as to construct a new energy station big data platform; and according to the constructed big data platform of the new energy station, constructing a digital twinborn model of the new energy station so as to reflect the operation state, the equipment health condition and the environment change of the station in real time. Through real-time data acquisition, digital twinborn model construction and simulation analysis, automatic generation and closed-loop management of an operation optimization scheme are realized, and the operation efficiency, prediction accuracy and fault handling capacity of the new energy station are effectively improved.
Owner:SHANDONG GUOHUA TIMES INVESTMENT DEV CO LTD

Evaluation method based on water ecological environment monitoring

The invention discloses an evaluation method based on water ecological environment monitoring, and relates to the technical field of water ecological environment evaluation. Comprising the steps of data collection: obtaining a river basic information data set, a monitoring equipment information data set and a historical monitoring information data set, and building a cloud server to store the river basic information data set, the monitoring equipment information data set and the historical monitoring information data set. According to the method, each region is accurately monitored through region division of river landforms and a targeted monitoring method, the timeliness of monitoring data is ensured, the water quality condition can be evaluated in real time and the water quality of the corresponding region under unique weather can be evaluated by acquiring a region monitoring data set and a weather information data set in real time to cooperate with an evaluation model, and the water quality evaluation accuracy is improved. In addition, weather changes can be monitored and early warned, timely support is provided for dealing with emergencies, and by summarizing the method, related departments can formulate more reasonable treatment schemes, the water quality management efficiency and effect are improved, and the water quality problem is found and solved in time.
Owner:青海省生态环境规划和环保技术中心

New energy power generation equipment health management platform based on large model

The invention discloses a new energy power generation equipment health management platform based on a large model, and relates to the technical field of power generation equipment health management. The system comprises a multivariate data acquisition and region identification module, a data preprocessing and region adaptation unit, a region perception large model analysis module, an intelligent operation and maintenance decision and scheduling module and a spare part inventory optimization sharing module. The multivariate data acquisition and area identification module deploys multiple types of sensors at key equipment parts of photovoltaic power generation stations in different areas, acquires equipment operation parameters and environment state data, endows the areas with unique codes and feature tags, and ensures that the data are traceable and are associated with area characteristics; according to the invention, the health management efficiency and accuracy of the new energy power generation equipment are significantly improved; the system not only realizes real-time monitoring and fault early warning of the equipment state, but also reduces the maintenance cost and improves the system operation efficiency by optimizing the operation and maintenance resource configuration and intelligent spare part inventory management.
Owner:DATANG LIANGSHAN NEW ENERGY CO LTD

Environmental adaptation illumination control system applied to travel landscape

The invention discloses an environment adaptability illumination control system applied to a travel landscape, and relates to the technical field of intelligent illumination control. The system comprises a lighting point data acquisition module, a region division module, a use condition monitoring module, a tourist distribution monitoring module, a data analysis and prediction module, an intelligent control module, a user feedback collection module and an adaptive adjustment module. The lighting point data acquisition module is used for acquiring position and state information of all lighting points in a scenic area; identifying all lighting equipment in the scenic spot; by integrating advanced data acquisition, region division, use condition monitoring, tourist distribution monitoring and data analysis and prediction modules, the intelligent level of the lighting system is remarkably improved, the system can automatically perform real-time adjustment according to environmental changes and tourist behavior modes, optimal configuration and accurate control of lighting are realized, and the intelligent level of the lighting system is improved. Therefore, the lighting effect is highly matched with the actual demand of the tourism landscape.
Owner:GUANGDONG ZHONGCHENG TECH CO LTD

Metropolitan area network flow prediction application method based on neural network

The invention relates to a metropolitan area network traffic prediction application method based on a neural network, and belongs to the technical field of network traffic. Dividing a training set, a verification set and a test set; 70%, 20% and 10% of data are used for model training, optimization and evaluation; inputting the traffic data into the double-layer stacked LSTM network, obtaining hidden state information and extracting time sequence characteristics and dependency of network traffic; capturing a long-term and short-term dependency relationship in the flow by using an encoder; global dependency features are extracted through a self-attention mechanism; gradually predicting flow data of a plurality of time points in the future by adopting a decoder; an early stop strategy is adopted in model training to prevent overfitting; carrying out anti-standardization processing on a model prediction result, and recovering an original scale; and evaluating a model prediction result. According to the invention, training and optimization of the deep learning model are carried out on the historical data and the feature data of the metropolitan area network, so that the accuracy of IP network traffic prediction is remarkably improved.
Owner:CHINA TELECOM DIGITAL INTELLIGENCE TECH CO LTD

Smart city traffic resource optimal configuration method and platform and storage medium

The invention discloses a smart city traffic resource optimal configuration method, a platform and a storage medium, and relates to the technical field of traffic optimization. When a road accident is detected, accident information is collected, and a traffic accident position and traffic accident characteristics are obtained; time consumption prediction is carried out according to the traffic accident characteristics, and traffic control duration is obtained; calling real-time traffic data from an intelligent traffic system to obtain associated road data; executing multi-thread traffic flow back-stepping analysis to obtain associated traffic flow prediction information; carrying out shunting performance evaluation; and dynamically updating the signal lamp configuration of the plurality of shunting candidate roads by taking the associated traffic flow prediction information as a constraint. According to the invention, the technical problems of aggravation of traffic jam and low emergency management efficiency caused by lack of scientificity and dynamic adaptability of shunting planning and lagging of signal lamp regulation in a traffic accident scene in the prior art are solved, and the technical effects of optimizing traffic resource configuration, relieving traffic jam and improving traffic emergency management efficiency are achieved.
Owner:YUHUA GUOYE (BEIJING) ENGINEERING TECHNOLOGY RESEARCH INSTITUTE CO LTD

Hazardous chemical substance transportation path planning method and system

The invention is suitable for the field of logistics transportation, and provides a hazardous chemical substance transportation path planning method and system, and the method comprises the steps: collecting road network information, road condition real-time data, weather data, population density distribution data, environment sensitive point distribution data, and hazardous chemical substance characteristic data; based on the collected data, establishing a risk assessment model, and performing risk assessment on each preset transportation path; constructing a multi-objective function, and distributing a corresponding weight for each objective; and searching and generating an optimal or suboptimal transportation path in the road network based on the multi-objective function, and when the change of the road condition data or the weather data exceeds a preset threshold value, performing risk assessment and path planning again, and regenerating the optimal or suboptimal transportation path. And the transportation data security is ensured. A path can be adjusted in real time to cope with road conditions and weather changes, the transportation risk is reduced, and the transportation cost, time and risk are balanced.
Owner:BEIJING CHINASOFT ORITECH INFORMAITON TECH CO LTD

Photovoltaic power station design system and method based on ecological collaborative optimization

The invention provides a photovoltaic power station design system and method based on ecological collaborative optimization, and relates to the technical field of data processing. The system comprises an initial configuration module which is used for generating an initial layout structure of a photovoltaic module, performing energy-saving and consumption-reducing calculation and economic analysis according to generating capacity data, and obtaining initial energy-saving and consumption-reducing data and initial economic analysis data; the secondary optimization module is used for optimizing the parameters of the photovoltaic module based on the economical efficiency analysis data and determining energy-saving and consumption-reducing data and economical efficiency analysis data through the generating capacity optimization data; the ecological evaluation module is used for determining ecological benefit data of the photovoltaic power station according to the ecological influence parameters; and the collaborative optimization module is used for setting a power generation income weight and an ecological benefit weight so as to optimize the photovoltaic module layout structure and generate a photovoltaic power station design scheme based on ecological collaborative optimization. The method is used for realizing collaborative optimization of power generation benefits and ecological benefits of the photovoltaic power station, so that the power station gives consideration to ecological protection while improving the power generation efficiency.
Owner:NORTHWEST ENGINEERING CORPORATION LIMITED

Intelligent task optimization method based on adaptive multi-dimensional dependency graph and dynamic scheduling

The invention relates to task scheduling, in particular to an intelligent task optimization method based on a self-adaptive multi-dimensional dependency graph and dynamic scheduling, which comprises the following steps of: inputting task information and resource information; constructing a self-adaptive multi-dimensional dependency graph according to the task information; in the task execution process, the task state of each task is monitored in real time, and the self-adaptive multi-dimensional dependency graph is dynamically updated; calculating the effective priority of the current task, and updating the effective priority of the current task according to the updated adaptive multi-dimensional dependency graph; dynamically scheduling the current task by adopting a dynamic scheduling algorithm; monitoring a task execution state and a resource use condition of each task in real time; according to the task execution state and the resource use condition, whether dynamic scheduling needs to be adjusted or not is judged until all tasks are executed; according to the technical scheme, the defect that in the prior art, accurate and efficient task optimization scheduling is difficult to carry out under the multi-dimensional dependency relationship between the tasks can be effectively overcome.
Owner:ANHUI GAOSHAN TECH CO LTD

Intelligent irrigation system for standardized production of forestry seedlings

The invention relates to the technical field of automatic control, in particular to an intelligent irrigation system for standardized production of forestry seedlings, which comprises a soil water and fertilizer state monitoring module, a water and fertilizer demand analysis module, a water and fertilizer amount adjustment module, a time period optimization module, an execution control module and a resource monitoring module. According to the invention, water and fertilizer strips required by seedling growth can be accurately mastered by monitoring the soil moisture and fertility state in real time, and compared with a preset standard, irrigation and fertilization requirements can be accurately evaluated, resource waste is reduced, the water and fertilizer use efficiency is improved, and by considering future weather conditions and soil temperature and adjusting the water and fertilizer delivery amount, the water and fertilizer utilization efficiency is improved. According to the method, uncertain influences caused by weather changes are reduced, the optimal fertilization and irrigation time periods are recognized, the timeliness and effectiveness of irrigation and fertilization are improved, continuous operation of irrigation and fertilization is guaranteed by monitoring the resource use state in real time and feeding back low stock information in time, and interruption of irrigation and fertilization caused by resource shortage is avoided.
Owner:GUANGZHOU INST OF FORESTRY & LANDSCAPE ARCHITECTURE

Intelligent classification prediction method, system and equipment for tumor treatment and protection

The invention is suitable for the technical field of tumor treatment and protection, and particularly relates to an intelligent classification prediction method, system and equipment for tumor treatment and protection, and the method comprises the steps: obtaining tumor-related molecular marker detection values and clinical diagnosis and treatment features of all target patients, and comprehensively integrating the multi-dimensional medical information of the patients; according to the relevance of molecular markers and clinical features, a scientific and quantitative multi-dimensional prognosis layering index set is constructed, and an accurate layering evaluation framework is formed; inputting the medical data into a pre-trained multilayer neural network model, and generating a high-resolution tumor characterization map through a cross-modal feature fusion technology; based on the dynamic matching of the atlas and the hierarchical index set, the hierarchical contribution degree parameter and the prognosis risk score are calculated in combination with the random forest model, the precise quantitative evaluation of the condition of the patient is completed, a high-credibility quantitative basis is provided for clinical decision making, the over-treatment risk is effectively reduced, and the prognosis management effect of the patient is improved.
Owner:WENZHOU CENT HOSPITAL

Hydraulic engineering video monitoring intelligent stationing optimization design method based on three-dimensional model

A hydraulic engineering video monitoring intelligent stationing optimization design method based on a three-dimensional model realizes video monitoring intelligent stationing planning design based on a mode of combined development of a three-dimensional modeling platform and a BIM lightweight engine. The method comprises five stages of camera adaptive arrangement, monitoring area three-dimensional visualization, monitoring coverage check, design optimization and design result display output. According to the method, the overall planning of the video monitoring intelligent stationing of the water conservancy and hydropower engineering is enhanced, the advantages and disadvantages of the video monitoring stationing are scientifically and quantitatively evaluated, and a quantifiable video monitoring intelligent stationing planning scheme is provided. According to the method, the requirements of the current video monitoring distribution point and the monitoring coverage rate are combined, a monitoring model optimization algorithm is utilized, the monitoring coverage rate or the camera configuration is taken as an optimization target, the monitoring coverage rate is improved, the monitoring blind area range is reduced, monitoring redundancy setting is avoided, and the monitoring camera configuration is optimized.
Owner:CHINA YANGTZE POWER

Visual management and control method and device for power distribution network, storage medium and product

The invention discloses a power distribution network visual management and control method and device, a storage medium and a product, and the method comprises the steps: obtaining the multi-dimensional information of a power distribution network in a target region, carrying out the preprocessing of the multi-dimensional information, obtaining a standardized power distribution network data set, carrying out the recognition of a power distribution network problem according to the power distribution network data set, and obtaining a power distribution network fault. The method comprises the following steps: obtaining a structured problem list of a power distribution network, carrying out spatial positioning and attribute mapping processing on the structured problem list in a preset geographic information system to obtain a power distribution network problem spatial distribution representation, and carrying out multi-dimensional analysis and prediction on the operation condition of the power distribution network according to the power distribution network problem spatial distribution representation. And obtaining a management and control strategy of the power distribution network, carrying out resource allocation according to the management and control strategy to obtain a cooperative work flow, and visualizing the problem space distribution representation of the power distribution network and the cooperative work flow in a geographic information system to provide a visual management and control mode. And the management efficiency and safety of the power distribution network are improved.
Owner:GUANGDONG POWER GRID CO LTD +1

Intelligent unmanned rescue boat, rescue control method and rescue control equipment

The invention discloses an intelligent unmanned rescue boat, a rescue control method and rescue control equipment. The rescue boat comprises a boat body, a power system, a multi-sensor system, a communication system, a processor and a memory. The multi-sensor system comprises a visual sensor, a thermal imaging sensor, a sonar sensor, a positioning sensor and a meteorological sensor. The communication system is used for exchanging data with external equipment; the processor is connected with the multi-sensor system and the communication system; the memory is connected with the processor and stores a computer program; and the processor executes the program in the memory, controls the multi-sensor system to scan a surrounding water area, identifies and positions at least one drowning person, determines an obstacle avoidance demand, generates an optimal rescue path, and controls the power system to move the ship body according to the optimal path to implement rescue. According to the invention, rescue tasks can be efficiently and accurately executed under complex sea conditions, and the success rate and efficiency of sea rescue are improved.
Owner:BEIJING KESUM INTELLIGENT TECHNOLOGY CO LTD

Real-time voltage regulation method for new energy automobile

The invention relates to the field of voltage regulation and control, in particular to a real-time voltage regulation method for a new energy automobile. Initializing a power distribution network voltage measurement module, and collecting voltage data of each node of the power distribution network; setting a voltage deviation threshold value, and judging whether the voltage is in a normal range or not; collected voltage is compared with a set voltage deviation threshold value, a result obtained after preliminary voltage regulation of an on-load voltage regulation transformer is compared with the set voltage deviation threshold value, and a result obtained after cooperative voltage regulation of an electric vehicle charging pile is compared with the set voltage deviation threshold value. According to a comparison result, tap adjustment of an on-load voltage regulation transformer, cooperative voltage regulation of an electric vehicle charging pile and voltage regulation participated by a distributed photovoltaic system are carried out in sequence; and formulating an optimization strategy based on historical data and results of three times of voltage regulation. By means of cooperative voltage regulation, optimal control, intelligent management and the like, the voltage stability is effectively improved, and the adaptability and flexibility of the system are enhanced.
Owner:STATE GRID QINGHAI ELECTRIC POWER CO HAINAN POWER SUPPLY CO +1

Marketing commodity short video generation method and device based on AI, medium and product

The invention discloses an AI-based marketing commodity short video generation method and device, a medium and a product, and relates to the field of short video generation. The method comprises the following steps: constructing a short video industry knowledge base; obtaining question information input by a user; searching answers from a short video industry knowledge base according to the question information; obtaining a video selected from the answers by the user as a reference short video, and obtaining commodity information uploaded by the user; the commodity information comprises commodity selling points and commodity materials; retrieving a reference copywriting from the short video industry knowledge base according to the commodity selling point, taking the reference copywriting as knowledge supplementary information, generating a script copywriting according to the reference short video and the knowledge supplementary information, and generating picture information according to the script copywriting and the commodity material; and editing the picture information to obtain a short video of the commodity information. The output efficiency of the running amount materials can be improved.
Owner:DALI MIRACLE (HANGZHOU) TECHNOLOGY CO LTD

Optimized scheduling and operation and maintenance management method and system for intelligent distributed photovoltaic power station

The invention discloses an intelligent distributed photovoltaic power station optimal scheduling and operation and maintenance management method and system, and relates to the technical field of optimal scheduling. Historical power generation data, real-time meteorological data and future weather forecast of a photovoltaic power station are acquired; according to the historical power generation data, the real-time meteorological data and the future weather forecast, inputting the historical power generation data, the real-time meteorological data and the future weather forecast into a pre-trained power generation prediction model to obtain a photovoltaic power generation prediction value in a future time period; and obtaining the power grid demand power of the photovoltaic power station, and planning the charging and discharging strategy of the energy storage system according to the absolute value of the difference between the power grid demand power and the photovoltaic power generation prediction value. The difference between the power grid demand power and the photovoltaic generating capacity prediction value is analyzed, the output power of the photovoltaic power station and the charging and discharging mode of the energy storage system are adjusted according to the difference, the completion degree of the charging and discharging strategy is judged through the charging and discharging time of the energy storage system, the adjusting function of the energy storage system is fully played, and the energy storage efficiency is improved. And the reliability and continuity of power supply are improved.
Owner:ZHONGNENG DIGITAL (TIANJIN) TECHNOLOGY CO LTD

Automatic model adjusting and optimizing system based on AI training intelligent workbench

The invention discloses an automatic model tuning system based on an AI training intelligent workbench, and relates to the technical field of artificial intelligence, and the system comprises the steps: setting a data collection instrument and an environment monitoring point, collecting model real-time data in a model training process, and carrying out the preprocessing; performing model performance analysis according to the model real-time data and the model original data to obtain final parameter configuration; and performing model training by utilizing the final parameter configuration, dividing the model training process into different stages, dynamically adjusting an intelligent control strategy based on model performance requirements, and performing optimization on the different stages of the model. According to the method, through multi-dimensional performance evaluation, parameter configuration is optimized, and the robustness and generalization ability of the model are improved. Through dynamic adjustment of an intelligent control strategy, fine management of a training process is realized, efficiency and resource utilization are improved, model convergence is accelerated, and finally an efficient, stable and high-adaptability model training effect is achieved.
Owner:SUZHOU DEMANHONG INFORMATION TECHNOLOGY CO LTD

Water resource management system based on terrestrial ecosystem protection

The invention discloses a water resource management system based on terrestrial ecosystem protection, and relates to the technical field of water resource management. The water resource management platform is in communication connection with a data collection and processing module, an index system construction module, a space coordinate system unification module, a unit analysis module, an ecological hydrological evaluation module and a management module, and all the modules are in electric signal connection. According to the method, hydrological characteristics and ecological requirements of different regions are identified more accurately by dividing ecological hydrological regions, comprehensive evaluation is performed on landform, ecological factors, climate hydrology and human activity data in a drainage basin by using a G-IS and a spatial analysis tool, ecological hydrological indexes are calculated, and the evaluation accuracy is improved. Therefore, targeted water resource management measures are formulated for each subarea, optimization of water resource allocation, improvement of water utilization efficiency, reduction of waste and guarantee of reasonable distribution and utilization of water resources are facilitated.
Owner:SOUTHWEAT UNIV OF SCI & TECH

New energy vehicle charging station charging amount demand prediction system based on big data

The invention provides a new energy automobile charging station charging amount demand prediction system based on big data, and relates to the technical field of charging amount demand prediction. The method comprises the specific implementation steps that firstly, vehicle images are collected and recognized through a high-definition camera so as to obtain traffic flow data, and meanwhile charging pile distribution, geographical distribution, historical charging data and meteorological data are obtained; secondly, cleaning and processing the acquired data, and constructing a charging station space relation graph; secondly, determining time sequence key data by analyzing the similarity of historical data sequences; and finally, based on the charging station space relation graph and the time sequence key data, constructing a charging amount prediction model so as to predict the future charging amount, and judging whether the model is updated or not. The system not only improves the accuracy of charging demand prediction, but also optimizes the resource configuration of the charging station, and can monitor and dynamically adjust the charging strategy of the charging station in real time, thereby improving the use efficiency of charging facilities.
Owner:SHANDONG GOLDENCELL ELECTRONICS TECH CO LTD

Scheduling optimization method for aviation composite material manufacturing hot press molding process

The invention discloses a scheduling optimization method for an aviation composite material manufacturing hot-press forming process, which comprises the following steps of: 1, establishing a hot-press forming production plan scheduling objective function by taking the minimum total delay time of a workpiece as an objective according to an aviation composite material manufacturing hot-press forming production plan; 2, establishing a two-dimensional hot press molding process batch scheduling model considering a workpiece release time window and machine applicability; and step 3, taking the objective function as an optimization objective, taking the two-dimensional hot-press forming process batch scheduling model as an optimization model, and utilizing a genetic algorithm embedded with a self-adaptive domain search strategy to solve and obtain a hot-press forming production plan scheduling scheme. According to the method, the total delay time of workpieces can be remarkably shortened while the machining batch of the workpieces is minimized, the occurrence of prepreg deterioration conditions is reduced, and conditions are created for improving the hot press molding production efficiency and promoting digital and intelligent transformation and upgrading of composite material manufacturing enterprises.
Owner:NANJING UNIV OF AERONAUTICS & ASTRONAUTICS

Molecular property prediction large language model construction method based on knowledge graph

The invention discloses a molecular property prediction large language model construction method based on a knowledge graph. The method comprises a plurality of steps: firstly, acquiring pre-training corpora by using a high-throughput data acquisition technology, including related data such as molecular attributes and metabolic pathways; then, a knowledge graph about fourteen end points is constructed based on the data, and the knowledge graph represents the relation between the molecules and the attributes and the end points of the molecules in a triple form; thirdly, pre-training the large language model by using a LoRA technology, optimizing the model by adopting an incremental learning strategy, and forming an expert large model; then, a triple related to the target endpoint is retrieved from the knowledge graph through the RAG technology, and retrieval results are sorted; and filtering the retrieved triple through cue word design and an expert large model, and extracting key information. And finally, converting the filtered triple list into a natural language, inputting the natural language into an expert large model, generating a prediction result of molecular properties, and providing a reasoning basis. According to the method, the accuracy and efficiency of molecule and endpoint chemical reaction prediction are remarkably improved.
Owner:EAST CHINA UNIV OF SCI & TECH

Whole blood donor low hemoglobin delayed blood donation risk prediction method

The invention provides a whole blood donor low hemoglobin delayed blood donation risk prediction method, which comprises a data normalization and abnormal value processing module, a classification feature coding module, a category balance and model fitting module, a hyper-parameter adjustment module and a model interpretation and deployment module. According to the prediction method provided by the invention, data normalization and targeted feature coding are carried out on blood donation records and hemoglobin detection data, an SMOTE oversampling algorithm is used for class balance and then fitting of a Light GBM model is carried out, and a Hyperband hyper-parameter adjustment method is used for adjusting and optimizing SMOTE and Light GBM parameters. And storing the tuning model for feature importance interpretation, model packaging and network deployment, thereby realizing the effects of optimizing the whole blood donor invitation strategy and enhancing the continuity and stability of blood supply.
Owner:ZHEJIANG PROVINCIAL BLOOD CENT

Financial integrated management system based on intellectualization

The invention belongs to the technical field of enterprise financial management, and particularly relates to an intellectualization-based financial integrated management system, which constructs a reference budget reasonable interval of each auditing project through reference project comparison and market prediction change of each auditing project so as to evaluate the rationality of a planned budget amount uploaded by each auditing project principal, thereby improving the management efficiency. After it is determined that the planned budget amount of each auditing project is reasonable, according to the priority coefficient and the risk level coefficient of each auditing project, arranging a corresponding budget payment sequence, and on the basis of the financial funds of the target enterprise in the future preset period, making a project budget scheme of the target enterprise in the future preset period. And the budget execution condition of each auditing project at each accounting time point is collected, the regulation and control requirements of the project budget scheme of the target enterprise in the future preset period are judged, and corresponding dynamic regulation and control are performed, so that effective cooperation of enterprise financial budget and accounting is realized, and the financial decision quality and the operation benefit of the enterprise are further guaranteed.
Owner:GUIZHOU BIT SOFTWARE CO LTD

Multi-source information integration runoff prediction method based on informer model

The invention discloses a runoff prediction model based on multi-source information integration of an Informer model, and belongs to the technical field of hydropower station runoff prediction. The invention aims to solve the problem of poor accuracy of medium and long term runoff prediction, especially for runoff sequences with multi-source, non-linear and non-stationary characteristics. The monitoring power station range is selected, and historical runoff data of the hydropower station and hydrological information such as rainfall and temperature of a surrounding area are obtained; adopting a Pearson correlation analysis method to select strong correlation features as multi-source time sequence feature input of an Informer model; preprocessing the data by using an STL seasonal decomposition method, and extracting characteristics of a period term and a trend term; runoff prediction is carried out by adopting a sparse attention mechanism and a self-attention distillation mechanism of an Informer model; according to the method, the prediction speed and feature capture can be enhanced, the runoff prediction accuracy is improved, and powerful support is provided for water resource management and scheduling of the hydropower station.
Owner:CHINA THREE GORGES UNIV

Intelligent garbage recycling system based on Internet integrated dispatching platform

The invention provides an intelligent garbage collection system based on an Internet integrated scheduling platform, and belongs to the technical field of garbage data processing. Through the application of data processing technologies such as building of a collection prediction model and an anomaly detection mechanism, abnormal data in a period of time can be predicted and fed back to the Internet integrated scheduling platform, so that the garbage collection efficiency is improved. According to the method and the system, the data are used as reference data for garbage recycling resource scheduling to provide a recycling scheme, so that the garbage recycling efficiency is effectively improved, the resource configuration is optimized, abnormal changes of the garbage amount, the accumulation state or the throwing behavior are responded and processed in time, and powerful support is provided for formulating a more scientific and reasonable recycling scheme for an internet integrated scheduling platform.
Owner:SHANDONG LEXIANG ENVIRONMENTAL PROTECTION TECHNOLOGY CO LTD

Advertisement delivery method and system

The invention provides an advertisement delivery method and system, and the method comprises the steps: obtaining user behavior data, and carrying out the preprocessing, so as to convert the user behavior data into structural data; analyzing and processing the user behavior data based on a preset construction rule to extract user interest data; extracting user historical behavior data in a preset time period from the user behavior data, and analyzing and processing the user historical behavior data to obtain a user behavior prediction result; and pushing the advertisement in the advertisement library to the user according to the user interest data and the user behavior prediction result and based on a preset pushing strategy. The interest data of the user is determined by analyzing and processing the behavior data, the behavior trend of the user is predicted, and advertisement putting is performed on the user according to the interest data and the behavior trend of the user, so that the problem that the existing advertisement putting technology cannot accurately meet the personalized requirements of the user is solved, the advertisement putting accuracy and effect are improved, and the user experience is improved. And the user experience is improved.
Owner:GUANGDONG YIDA TECHNOLOGY CO LTD

Photoelectromagnetic storage method and system based on hierarchical management

The invention relates to the technical field of hierarchical storage, in particular to a photo-electromagnetic storage method and system based on hierarchical management, and the method comprises the following steps: collecting read-write speed, error rate, durability and cost data of optical storage and electromagnetic storage media, carrying out the sorting and grading processing of the data according to the read-write speed and the error rate, and carrying out the sorting and grading processing of the data; and performing score calculation on each storage medium to obtain a medium performance score. According to the method and the device, the data is effectively distributed to the most suitable storage medium by accurately scoring the performance of the storage medium and combining specific requirements of the to-be-stored data, so that the data access speed and efficiency are improved, the total storage cost is reduced, and particularly, when a large amount of data is processed, the data compression level and the encoding format are dynamically adjusted, and the data compression efficiency is improved. The storage efficiency of the data is further optimized, data redundancy is reduced, the overall performance of data storage and access is remarkably improved through optimization measures, and meanwhile long-term safety and integrity of the data are ensured.
Owner:GUANGDONG YUNKONG DIGITAL INFORMATION TECHNOLOGY CO LTD