The invention relates to the technical field of bridge crane maintenance, in particular to a bridge crane steel
wire rope replacement method which comprises the following steps: S1, mounting an automatic
monitoring system and a
tension control system, and monitoring the states of a main steel
wire rope and an auxiliary steel
wire rope in real time to obtain real-
time data and tension data; when the device is used, the
automation degree and the reliability of replacement operation of the main steel wire
rope and the auxiliary steel wire
rope are improved, manual operation errors are reduced, the accuracy and the efficiency of operation are improved, the safety and the stability of the bridge crane are improved, the maintenance time and the
downtime are shortened, and meanwhile, the safety of the bridge crane is improved. The automatic monitoring and alarm mechanism improves the working efficiency, reduces manual intervention, improves the reliability of the
system, ensures the high efficiency of the maintenance process and the safety and
traceability of data through automatic recording and cloud platform storage, optimizes the maintenance process through automatic generation and uploading of maintenance logs, and improves the maintenance efficiency. And the capabilities of
fault prevention and
quality control are enhanced.