Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

21904results about "Constructions" patented technology

Pointed Diamond Working Ends on a Shear Bit

In one aspect of the present invention, a drill string has a drill bit with a body intermediate a shank and a working face. The working face has a plurality of blades converging at a center of the working surface and diverging towards a gauge of the working face. At least one blade has a cutting element with a carbide substrate bonded to a diamond working end with a pointed geometry. The diamond working end also has a central axis which intersects an apex of the pointed geometry. The axis is oriented between a 25 and 85 degree positive rake angle.
Owner:SCHLUMBERGER TECH CORP

Well deviation azimuth measurement system based on high-precision compensation algorithm

The invention belongs to the technical field of data processing, and particularly relates to a well deviation azimuth measurement system based on a high-precision compensation algorithm. The system comprises a reference vector construction part, a compensation part and a Kalman filtering measurement part. The benchmark vector construction part is used for determining a reference benchmark of a geomagnetic field and a gravitational field in the underground environment; the compensation part is used for compensating original sensor data measured by the underground sensor group, and estimating an underground initial attitude angle according to compensated accelerometer data and compensated magnetometer data in the compensated data; calculating attitude change data; according to the attitude change data, constructing a local interference field model to obtain corrected magnetometer data; and the Kalman filtering measurement part is used for modeling all error sources into state vectors, correcting measurement errors in real time through a Kalman filtering algorithm and outputting a final well deviation direction. According to the invention, the precision, the stability and the robustness of well deviation azimuth measurement are obviously improved.
Owner:QINGDAO ZITN MICROELECTRONICS CO LTD

Array electric imaging logging based reservoir oil-water identification method and system

The invention relates to an array electric imaging logging based reservoir oil-water identification method and system. Aiming at the resistivity distribution characteristics of mud-invaded formations, a 'five-parameter formation model' is established, which is adapted to the requirement for simulating the resistivity distribution characteristics of different mud types and different invaded formations, and is pioneering in the aspects of forward-inversion models and processing methods of array electric imaging logging; and based on a 'five-parameter inversion' method for array electric imaging logging, an operation of carrying out resistivity distribution profile reconstruction on mud-invaded formations is performed, which reflects the actual differences between different resistivity distribution characteristics or change rules of mud-invaded oil formations or water formations. The method has stronger practicability, and is pioneering in the actual application aspects of qualitative identification and quantitative calculation on reservoir fluid properties.
Owner:CHINA UNIV OF PETROLEUM (EAST CHINA)

Reamer drill bit

A reamer drill bit includes a body having an outer surface defining a plurality of grooves, and a cutter arm with an interior surface. Each groove extends from a first end of the body to a second end of the body and has at least one groove recess, at least one groove peak connected by a sloped section, and a track arranged in the sloped section. The cutter arm is slidably attached to the body, is configured to expand radially away from the body, and is configured to slide longitudinally relative to the body along the track. The interior surface of the cutter arm includes at least one arm valley, and at least one arm protrusion. The at least one groove recess receives the at least one arm protrusion and the at least one arm valley receives the at least one groove peak.
Owner:SAUDI ARABIAN OIL CO

Intelligent monitoring system for oil development platform

Provided is an intelligent monitoring system for an oil development platform. The system includes external environment monitoring of a well platform, internal environment monitoring of the well platform and platform construction, where the external environment monitoring of the well platform includes real-time monitoring of natural environment conditions around an offshore oil development platform, the internal environment monitoring of the well platform includes collection and analysis of various indexes inside the oil well platform, and the platform construction is based on a three-layer structural design including a sensing layer, a transmission layer and an application layer. The sensing layer collects environmental data of ocean and the well platform through an Internet of Things technology, the transmission layer rapidly transmits data to ensure real-time updating of information, and the application layer processes received data to realize fusion and visualization of the data.
Owner:LUDONG UNIVERSITY

Soil layer detection drilling device

A soil layer detection drilling device includes a drilling cylinder, and a soil-sampling assembly is provided inside the drilling cylinder. When the soil is drilled, equipment is in a vertical state, a controller is turned on to control a rotary motor to rotate, and the drilling cylinder is driven to drill the soil with the cooperation of drive wheels and a drive belt. Four slide blocks are evenly distributed around an outer circumference of a sliding disk and are matingly connected with slide grooves provided on an inner wall of the drilling cylinder, so when the drilling cylinder rotates, the soil-sampling assembly also rotates. A conical head first in contact with the ground starts to drill the ground, then the drilling cylinder gradually drills into a soil layer, and the drilling cylinder is idled as the drilling cylinder arrives at a certain depth, to clear soil on auger blades.
Owner:POWERCHINA SEPCO1 ELECTRIC POWER CONSTR CO LTD

Drilling event remediation framework

A method may include receiving a description of an event occurring at a wellsite; extracting a failure mode from the description using a fine-tuned large language model (LLM); identifying a matching failure mode from historical data processed using the fine-tuned LLM, where the matching failure mode is associated with one or more remedial actions that successfully resolved the matching failure mode; and outputting the one or more remedial actions for implementation at the wellsite.
Owner:SCHLUMBERGER TECH CORP

Water and soil resource comprehensive improvement method for loess hilly and gully region channels

The present invention relates to the technical field of land engineering, and relates to a water and soil resource comprehensive improvement method for loess hilly and gully region channels. The method comprises: (1) soil layer general survey: performing soil layer thickness survey and soil nutrition content measurement; (2) soil body reconstruction: on the basis of soil layer general survey data, selecting a soil body construction mode, and performing soil body profile reconstruction, soil body nutrition reconstruction and field parcel arrangement; and (3) constructing a water resource regulation and control system for the loess hilly and gully region channels. According to the present invention, investigation and survey are performed firstly, then treatment is performed, water and soil are treated simultaneously, and steps are coordinated, so that ecological treatment of the loess hilly and gully region channels is finally completed, and comprehensive improvement of water and soil resources is achieved. The present invention ensures mechanical cultivation of the region after the improvement, effectively increases the area of the irrigable land and the area of the non-irrigated land, effectively improves the farmland quality and the grain yield, and effectively reduces the soil erosion amount of the channels.
Owner:INST OF LAND ENG & TECH SHAANXI PROVINCIAL LAND ENG CONSTR GRP CO LTD

System method and apparatus for instrumented engagement elements

An instrument assembly comprises an electronics housing disposed in a body of a downhole tool and an engagement element assembly connected to the electronics housing. The instrument assembly includes an engagement sensor positioned at a base of the engagement element assembly and configured to take measurements corresponding with an engagement of the engagement element assembly with a borehole. The instrument assembly includes an electronics housing seal configured to seal at least a portion of the electronics housing from a downhole pressure.
Owner:SCHLUMBERGER TECH CORP

Shield tunneling control method and system based on rock-soil particle motion trail

The invention relates to the field of shield tunneling, and discloses a shield tunneling control method and system based on a rock-soil particle motion trail, and the method comprises the steps: fusion deployment of various types of high-precision sensors, intelligent anti-noise data collection and preprocessing, precise physical model construction, efficient numerical simulation optimization, and multi-parameter comprehensive detection and correlation analysis. And real-time data-driven adaptive control model construction, control instruction rapid generation and transmission, closed-loop feedback and continuous optimization are realized. According to the method, multiple links including fusion deployment of multiple types of high-precision sensors, intelligent anti-noise processing, physical model construction and the like are covered, all the links have a synergistic effect, data can be accurately obtained, data quality can be guaranteed, a simulation foundation can be provided, comprehensive evaluation, intelligent control and rapid instruction transmission can be achieved, continuous optimization is achieved through closed-loop feedback, and the method is suitable for large-scale popularization and application. And finally, the construction level in all aspects is improved, and complex engineering requirements are met.
Owner:SOUTHWEST JIAOTONG UNIV

Field pump equipment system

A method can include, receiving by a computational device at a wellsite, real-time, time series data from pump equipment at the wellsite, where the wellsite includes a wellbore in contact with a fluid reservoir; using the computational device, processing the time series data as input to a trained machine learning model to detect a performance issue of the pump equipment; and issuing a signal responsive to detection of the performance issue.
Owner:SCHLUMBERGER TECH CORP

Electric Powered Hydraulic Fracturing Pump System with Single Electric Powered Multi-Plunger Fracturing Pump

A hydraulic fracturing system includes a support structure having a first area at a first height and a second area at a second height, the first and second areas adjacent one another. The system also includes an electric powered, multi-plunger pump with an odd number of plungers, arranged in the first area, the electric powered pump coupled to a well, via outlet piping, and powered by at least one electric motor, also arranged in the first area. The system further includes a variable frequency drive (VFD), arranged in the second area, connected to the at least one electric motor, the VFD configured to control at least a speed of the at least one electric motor. The system also includes a transformer, arranged in the second area, the transformer positioned within an enclosure with the VFD, the transformer distributing power to the electric pump.
Owner:US WELL SERVICES LLC

Completion system for CCS monitoring

ActiveUS20240392646A1SurveyConstructionsProduction packerMechanical engineering
A completion system for CO2 storage monitoring includes a first well tubular metal structure, a second well tubular metal structure, cement arranged between the borehole and a second part of the second well tubular metal structure, a monitoring line extending along the second well tubular metal structure and into the cement, a production packer assembly providing a seal between the first and second well tubular metal structures, the production packer assembly having an anchoring unit, and an annular barrier unit. Each unit comprises a tubular metal part configured to be mounted as part of a first part of the second well tubular metal structure, the tubular metal part having an expandable metal sleeve having a circumferential groove with an anchoring element and a sealing element. The monitoring line extends through the anchoring and annular barrier units between the tubular metal part and the expandable metal sleeve.
Owner:WELLTEC MFG CENT COMPLETIONS APS

Two-part drilling and running tool including a one way mechanism

Provided is a two-part drilling and running tool, a well system, and a method for forming a well system. The two-part drilling and running tool, in one aspect, includes a conveyance, a smaller assembly coupled to an end of the conveyance, and a larger bit assembly slidably coupled to the conveyance, the smaller assembly and larger bit assembly configured to slidingly engage one another downhole to form a combined bit assembly. The two-part drilling and running tool, according to this aspect, further includes a one way mechanism coupled between the smaller assembly and the larger bit assembly, the one way mechanism configured to allow the smaller assembly and larger bit assembly to axially slide in one direction relative to one another and prevent the smaller assembly and larger bit assembly from axially sliding in an opposite direction relative to one another.
Owner:HALLIBURTON ENERGY SERVICES INC

Comprehensive treatment method for salinized soil in semi-arid region

PCT designated stage expiredWO2024230102A1Soil lifting machinesConstructionsGrowth plantSoil science
A comprehensive treatment method for salinized soil in a semi-arid region, which method comprises: stripping and collecting surface soil, restoring and paving the stripped surface soil, and paving aeolian sandy soil and / or loess soil on the surface of the soil as borrowed soil; sequentially providing the soil with an impermeable layer, a salt-isolating layer, a diaphragm layer and a planting layer from bottom to top; doping clay into the sandy soil; and mixing a saline-alkali soil conditioner with in-situ soil until uniform. The method consumes few water resources, is relatively short in terms of a treatment period, takes effect quickly, is beneficial to plant growth, can effectively inhibit accumulation of salt in the surface soil, and can thoroughly achieve improvement of saline-alkali soil.
Owner:INST OF LAND ENG & TECH SHAANXI PROVINCIAL LAND ENG CONSTR GRP CO LTD

Real-time monitoring and intelligent control system for hydraulic fracturing cracks in oil reservoirs

The present invention relates to the technical field of oil and natural gas exploitation, and discloses a real-time monitoring and intelligent control system for hydraulic fracturing cracks in oil reservoirs, including: a real-time monitoring module, which is used to collect crack geometric morphology parameters and construction operation parameters in real time during crack expansion; a nonlinear modeling module, which is connected to the real-time monitoring module, and is used to construct a nonlinear dynamic model of crack expansion according to the collected crack expansion parameters and construction operation parameters, and output a predicted value of crack morphology; an optimization control module, which is connected to the nonlinear modeling module, and is used to calculate the optimized construction parameters according to the nonlinear dynamic model, including injection pressure, injection flow rate and viscosity of fracturing fluid. The present invention realizes precise control of crack expansion, intelligent optimization of construction parameters and efficiency improvement through the closed-loop linkage of real-time monitoring, nonlinear modeling, optimization control and feedback execution.
Owner:HUILONG ENERGY TECH (SHANDONG) CO LTD

Precise deep oil and gas navigation system based on structural evaluation of sand / shale formation, and device

A precise deep oil and gas navigation system based on structural evaluation of a sand / shale formation, and a device are provided. The precise deep oil and gas navigation system is implemented by: acquiring basic data of a target well location as well as basic data and an acoustic LWD curve of an adjacent well; dividing a basic data group; retaining extremely strongly correlated data and strongly correlated data of the basic data group, and performing dimensionality reduction; constructing a three-dimensional fusion feature data volume based on a dimensionality-reduced fusion feature parameter and a time-frequency spectrum; predicting a missing curve according to the three-dimensional fusion feature data volume; and correcting a stratigraphic structure model based on the missing curve to guide the design of a drilling trajectory.
Owner:INSTITUTE OF GEOLOGY AND GEOPHYSICS CHINESE ACADEMY OF SCIENCES

Deepwater drilling overflow early warning device and method

The invention discloses a deepwater well drilling overflow early warning device and method, and relates to the technical field of petroleum engineering, the deepwater well drilling overflow early warning device comprises a data acquisition module, an environment compensation module, a data processing module, a data processing module and a data processing module, the data acquisition module is used for acquiring data during well drilling, and the data comprises underground bottom hole pressure, temperature, acoustic logging data, gamma logging data, underwater gas content data and overwater well fluid flow data; the environment monitoring module is used for monitoring environment changes and dynamically correcting data acquired by the data acquisition module by applying a real-time correction algorithm based on a neural network, and the data processing and analyzing module is used for cleaning the data of the data acquisition module, extracting features and transmitting the features to the early warning system module. Accurate environment data are obtained through the environment compensation module, the data are processed through a real-time correction algorithm, the influence of external interference such as water flow fluctuation and temperature change on sensor reading can be eliminated, and therefore the accuracy and reliability of the data are improved.
Owner:SANYA MARINE OIL & GAS RESEARCH INSTITUTE NORTHEAST PETROLEUM UNIVERSITY

Hydrogen production method for coordinated injection of coal in-situ supercritical water and oxygen

The invention discloses a hydrogen production method for coordinated injection of coal in-situ supercritical water and oxygen, and belongs to the technical field of underground energy exploitation. Forming a plurality of first communicated main fracturing surfaces in the deep coal seam along the trend of the deep coal seam through well spacing and fracturing; supercritical water and oxygen are injected into the deep coal seam, and redox reaction is carried out in the deep coal seam to generate synthetic gas containing H2 and CO2; in the reaction process, the temperature of each area of the deep coal seam is monitored, and the temperature is changed in a gradient subarea mode in the advancing direction of the working face and is circularly advanced; an oxidation excitation heat generation area, a supercritical water gasification area, a pyrolytic reaction area and a preheating area are formed; carrying out oxygen stopping preheating according to the temperature change; circularly preheating and introducing oxygen until the mining of the working face is finished; the goaf is filled in the preheating process, and it is guaranteed that heat continuously advances in the advancing direction of the working face; according to the method, the temperature of the coal seam partitions is monitored and regulated, so that continuous propelling of fracturing, gasification and filling is guaranteed, and the hydrogen production effect is accurately improved.
Owner:TAIYUAN UNIVERSITY OF TECHNOLOGY

Infrastructure monitoring systems and methods

A method for monitoring an infrastructure of interest, the method comprising: providing a distributed acoustic sensor, an analysis module, and optical fibre cable adjacent to the infrastructure wherein the optical fibre cable is divided into one or more sections, and the distributed acoustic sensor generates DAS sensor data from the one or more sections; providing a processing module comprising one or more processors and a memory, wherein the memory comprises at least two or more processing algorithms, wherein the one or more processors are configured to execute the processing algorithms with the DAS sensor data as input, wherein each processing algorithm is configured to provide an output state for each section of the optical fibre cable adjacent to the infrastructure of interest.
Owner:TERRA15 PTY LTD

Fracture plugging simulation experimental device and experimental method thereof

Disclosed is a fracture plugging simulation experimental device and an experimental method thereof. The device comprises a simulated wellbore, a simulated formation, a simulated fracture, a plurality of pressure sensors and vales, a mixing barrel, a liquid injection port and a pressurization port, a liquid collection tank, a plugging fluid storage tank, a heating device, etc. The method comprises: loading the simulated formation with the simulated fracture in the simulated wellbore, closing the second valve and turning on the mixing device, injecting a lost circulation material into the mixing barrel, closing the liquid injection port and turning on the heating device and pressurizing, stopping pressurizing and opening the second valve to establish a plugging process, turning on the plunger pump to continue pressurizing, and collecting a fluid pressure change of the simulated fracture in the plugging process; and calculating a pressure-bearing capacity of plugged fracture.
Owner:SOUTHWEST PETROLEUM UNIV

Exploration dynamic data analysis and display tool

PendingUS20240352847A1SurveyConstructionsDisplay deviceStratigraphic column
A method and system for identifying a drilling target within a subsurface region of interest based on a visual representation is provided. The method may include projecting a plurality of wellbores penetrating the subsurface region of interest onto a line of section and for each of the plurality of wellbores, determining a stratigraphic column and a petroleum system description. A regional stratigraphic column may be determined based on the stratigraphic column from each wellbore and a visual representation may be generated that includes the regional stratigraphic column aligned with the petroleum system description from each of the plurality of wellbores. The method may further include displaying the visual representation on a display device and identifying a drilling target within the subsurface region of interest based on the visual representation using an interpretation workstation.
Owner:SAUDI ARABIAN OIL CO

Intelligent while-drilling geological forecast integrated platform system and method thereof

The invention discloses an intelligent while-drilling geological forecast integrated platform system and a method thereof. The intelligent while-drilling geological forecast integrated platform system comprises a carrying platform and a geological analysis system, an advanced drilling module, a geophysical prospecting forecasting module and a geological sketching module are arranged on the carrying platform; the advanced drilling module is used for acquiring drilling data and in-hole images; the geophysical prospecting forecasting module is used for acquiring geological radar data, transient electromagnetic data and seismic wave data; the geological sketch module is used for acquiring a tunnel face image; the geological analysis system is used for determining the surrounding rock grade according to the drilling data; according to the in-hole image, determining the in-hole rock type and the fracture development degree; obtaining a detection image according to the geological radar data, the transient electromagnetic data and the seismic wave data; and according to the tunnel face image, determining a rock type and a crack in the tunnel face. Various geological detection modes are effectively combined, and the accuracy and timeliness of geological forecast are improved.
Owner:SHANDONG HI SPEED CONSTRUCTION MANAGEMENT GROUP CO LTD +2

Coal mine intelligent directional drill and drilling method therefor

The present invention relates to a coal mine intelligent directional drill and its drilling method, belonging to the technical field of coal mine drills. It comprises a moving platform, machine frame, clamper, main manipulator, power head, drill pipe storage system, control system, and hydraulic system. The power head structure is improved by adding an angle adjuster with accurate angle adjustment, locking, and anti-rotation functions. The angle adjuster is positioned on the gearbox side opposite the main motor, connected via a driving shaft. The control system includes a toolface azimuth detection and initialization system that works with the angle adjuster. This solves prior issues such as the absence of specialized toolface azimuth adjustment devices, low precision, low track adjustment efficiency, and challenges in achieving automatic directional drilling in the prior art. The invention enhances precision and efficiency, enabling automated, intelligent directional drilling.
Owner:CHINA COAL TECH & ENG GRP CHONGQING RES INST CO LTD

Using artificial intelligence methods to exploit well logging data

A method for constructing a high fidelity logging while drilling (LWD) log that includes obtaining a temporal well depth log and a plurality of temporal LWD logs from a drilling operation. The method further includes obtaining a temporal record of operational drilling parameters from the drilling operation. The method further includes determining, using a first machine-learning model, a temporal history of the drilling operation and constructing, using the temporal well depth log and the plurality of temporal LWD logs, a plurality of temporal property logs at each depth in the plurality of depths. The method further includes processing the plurality of temporal property logs with, at least, a second machine-learning model to form a plurality of corrected temporal property logs and aggregating the plurality of corrected temporal property logs to form a plurality of high fidelity LWD logs.
Owner:SAUDI ARABIAN OIL CO

Method and system for retrieving information from table corpora using large language models

A method for extracting and displaying desired information from a set of tables includes storing a set of tables including information associated with a subsurface of the Earth; receiving a user query; selecting a table from the set of tables based on an embedding search performed for the user query, on a vector database of table-column questions of the set of tables; selecting one or more columns from the table based on a likelihood estimation performed in an embedding space, between (1) the user query and (2) a table summary and descriptions of columns for the selected table; determining one or more rows associated with the one or more columns; and displaying one or more answers in response to the user query.
Owner:CGG SERVICES SAS

High-precision logging image crack identification method under lithology constraint

The invention relates to the technical field of logging image crack identification, in particular to a high-precision logging image crack identification method under lithology constraint, which comprises the following steps: S1, establishing a two-parameter lithology constraint index based on rock mechanical parameters and natural gamma; s2, well wall electric imaging crack information extraction based on man-machine interaction; s3, array sound wave image crack information extraction; s4, establishing a crack comprehensive discrimination index under multi-parameter constraint; and S5, checking a crack fine identification result under high-precision image information. According to the method, the comprehensive lithology constraint condition index is established based on different lithology and rock mechanics related parameters, the crack related parameters are quantitatively calculated, the crack geometrical characteristics are finely evaluated, and the crack mechanical property and the crack development type are evaluated in combination with the crack geometrical characteristics extracted through imaging; and finally, based on imaging and array sound wave analysis results, establishing a multi-parameter constrained comprehensive crack identification index to carry out crack comprehensive discrimination, thereby realizing accurate crack identification.
Owner:CHENGDU UNIVERSITY OF TECHNOLOGY

Downhole fluid and solid separation with sediment and nonproduction fluid management in a well

PendingUS20250101846A1SurveyConstructions
A well system comprising: a sediment separator to be positioned downhole in a well, wherein the sediment separator is configured to receive a formation fluid from a subsurface formation surrounding the well, the sediment separator configured to separate out sediment from the formation fluid, wherein the sediment is disposed or stored at surface of the well or a different downhole location in the well; and a fluid separator to be positioned downhole in the well, the fluid separator configured to receive the formation fluid from the sediment separator, wherein the fluid separator is configured to separate the formation fluid into production fluid and nonproduction fluid.
Owner:HALLIBURTON ENERGY SERVICES INC