Shield tunnel segmental lining and construction method

By arranging the airbags at intervals in the tunnel construction, the airbags expand and fill the surrounding rock gap, the problem of difficulty in filling the pipe sheets floating and surrounding rock gaps in tunnel construction is solved, and grouting efficiency and tunnel stability are improved , reduces construction risks.

CN119041937APending Publication Date: 2024-11-29JINAN COMM DEV INVESTMENT CO LTD
View PDF 0 Cites 8 Cited by

Patent Information

Application Number
CN202411373802.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-29
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

In tunnel construction, the floating pipe sheet and surrounding rock gap caused by the shield method are difficult to effectively fill, resulting in tunnel leakage and safety hazards, and the prior art is difficult to effectively control the distribution of slurry and prevent the limited expansion range of the airbag.

Method used

By arranging pipe sheets with airbags in the longitudinal direction of the tunnel and combining them into sealing ring sheets, the airbag expands and fills the surrounding rock gaps to form a continuously distributed sealing structure, isolating the gaps between adjacent ring sheets, and grouting and filling to resist floating And prevent the slurry from flowing out.

Benefits of technology

It improves grouting efficiency and filling effect, reduces construction risks, enhances tunnel stability and safety, and avoids floating and leakage problems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041937A_ABST
    Figure CN119041937A_ABST
Patent Text Reader

Abstract

The invention provides a shield tunnel segmental lining and a construction method, relates to the field of tunnel linings, and aims to solve the problem that efficiency and effect are difficult to meet requirements due to the fact that slurry flow is inconvenient to control when current segments float upwards and are subjected to grouting treatment. The segment on the same plugging ring piece fills the surrounding rock gap at the ring piece through expansion of the air bags, the air bags are continuously distributed in the annular direction, so that the surrounding rock gap between the adjacent plugging ring pieces in the longitudinal direction is isolated from other positions, grouting filling is conducted to fill the surrounding rock gap to resist floating, and grouting slurry is prevented from flowing out; the grouting efficiency is improved; and the grouting filling effect is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of tunnel lining, and in particular to a shield tunnel segment lining and a construction method. Background Art

[0002] The shield method is the main construction method currently used in urban tunnel construction. During tunnel excavation, the shield machine will perform serpentine movement to correct the line, which will cause over-excavation, resulting in an excavation range greater than the designed range, and irregular annular gaps will be formed between the pipe segments and the strata. Secondly, due to the complex geological environment and the large fluctuations of the strata or rock formations, the pipe segments are prone to floating after they are separated from the shield tail during the construction phase, which may cause safety accidents such as pipe segment misalignment and damage, shearing of inter-ring bolts, and water leakage, seriously affecting the quality of tunnel formation. For karst geology, the groundwater level varies greatly with the seasons. Rail transit such as subways are generally constructed during the dry season and the tunnels are generally set above the groundwater level to ensure the safety of the subway construction and operation stages. However, the groundwater level will rise during the rainy season or flood season, and the underground tunnel part will be below the water level. In this case, if the contact between the pipe segments or between the pipe segments and the rock formation is not tight, it will cause water leakage in the subway tunnel and serious floating of the tunnel pipe segments. Once the segments float up, large gaps will appear between adjacent groups of segments and the surrounding rock, causing consecutive groups of segments to float up to varying degrees, creating huge safety hazards and seriously affecting the normal use of the tunnel and the safe operation of the subway.

[0003] The control of the floating of the pipe segments is carried out from multiple aspects. For the formations in karst areas with relatively broken surrounding rocks and abundant groundwater, the method of only grouting between the pipe segments and the rock wall to fill the gaps or adding a supporting device to prevent floating is difficult to achieve the effect of preventing the outflow of slurry and preventing the connection between the pipe segments from being disconnected or staggered. A Chinese patent (publication number CN111236971A) discloses an airbag-type pipe segment and its operation method for an urban shield tunnel. The airbag structure provides known boundary conditions for grouting to control the grouting volume and grouting pressure behind the wall, thereby controlling the deformation of the formation and reducing the cost of the grouting project behind the wall; in the early stage, the surrounding rock is supported by air pressure to ensure that the pipe segments of the shield tail are integrated with the surrounding soil, reducing the damage to the pipe segments and improving the safety of tunnel construction and operation; in the later stage, the strong replacement of slurry-gas is used to control the formation settlement. The problem to be solved is the adjustment of a single segment. When dealing with large-scale gaps, it can only be solved by arranging air bags on all the segments. The construction operation is difficult. After the air bags are arranged, the expansion range of the air bags is limited, and it is difficult to completely fill the gap between the segment and the surrounding rock. Further grouting filling is still required, and it is difficult to control the distribution position of the slurry during filling, resulting in long grouting time, poor effect, and waste of slurry. Summary of the invention

[0004] The purpose of the present invention is to provide a shield tunnel segment lining and construction method in view of the defects of the prior art. Segments with air bags are arranged at intervals in the longitudinal direction of the tunnel and assembled into sealing ring segments. The segments on the same sealing ring segment fill the surrounding rock gaps at the ring segment through the expansion of the air bags. The air bags are continuously distributed from the ring upward, so that the surrounding rock gaps between adjacent sealing ring segments in the longitudinal direction are isolated from other positions. Grouting filling is performed to fill the surrounding rock gaps to resist floating, prevent the outflow of grouting slurry, improve the grouting efficiency and ensure the grouting filling effect.

[0005] The first object of the present invention is to provide a shield tunnel segment lining, which adopts the following scheme:

[0006] It includes pipe segments, each of which is provided with an installation groove on the distal side, in which an air bag with a grouting port is installed. The pipe segments at the same longitudinal position of the tunnel are spliced ​​into a plugging ring segment. The air bag corresponding to the same plugging ring segment can partially protrude out of the installation groove after expansion, and is sequentially fitted and spliced ​​into a ring along the ring upward to fill the gap in the surrounding rock. In the longitudinal direction of the tunnel, the plugging ring segments are distributed at intervals, and the gap in the surrounding rock between adjacent plugging ring segments forms a grouting space.

[0007] Furthermore, the airbag is partially fixed to the mounting groove, and the airbag located outside the mounting groove can expand circumferentially along the blocking ring piece, so as to adhere to the airbag fixed by other pipe segments of the same blocking ring piece after expansion.

[0008] Furthermore, the grouting port of the airbag extends to the proximal side of the pipe segment, and the grouting port is connected to the internal cavity of the airbag.

[0009] Furthermore, the placement groove is provided with an opening corresponding to the distal side of the pipe segment, the opening cooperates with the protective layer to be sealed, and the protective layer combines with the distal side of the airbag to form a complete arc surface.

[0010] Furthermore, the protective layer is a thin-walled structure, which can be opened or destroyed when the airbag is inflated.

[0011] Furthermore, it also includes an intermediate ring. In the longitudinal direction of the tunnel, at least one intermediate ring is provided between adjacent blocking ring pieces.

[0012] Furthermore, the intermediate ring includes a plurality of lining sheets assembled upwardly along the ring, and at least one lining sheet between adjacent blocking ring sheets is provided with a grouting hole, which communicates the surrounding rock gap and the inner side of the intermediate ring.

[0013] Furthermore, at least one pipe segment of the same sealing ring segment is provided with an air bag, and the grouting port is matched with a grouting joint.

[0014] The second object of the present invention is to provide a construction method for shield tunnel segment lining as described in the first object, comprising:

[0015] In shield construction, the segments form blocking ring segments, and the lining segments at other locations are spliced ​​into rings to form the lining inside the tunnel;

[0016] Inputting fluid medium into the airbag connected to the pipe segment at the grouting port, so that the airbag expands and protrudes out of the placement groove;

[0017] After the airbags corresponding to the same sealing ring piece are inflated, they can partially protrude out of the placement groove, and are sequentially spliced ​​upward along the ring to form a ring to fill the gap in the surrounding rock, so that the gap in the surrounding rock is cut off here, the grouting port is blocked, and the gap in the surrounding rock between adjacent sealing ring pieces forms a grouting space;

[0018] Grouting is injected into the gaps between adjacent plugging segments to fill the gaps in the surrounding rock and support the segments to resist floating.

[0019] Furthermore, the fluid medium is slurry, and the slurry is injected into the airbag to support the plugging segment.

[0020] Compared with the prior art, the present invention has the following advantages and positive effects:

[0021] (1) In view of the problem that it is inconvenient to control the flow of slurry during the flotation of the pipe segments through grouting, resulting in the inability to meet the requirements in terms of efficiency and effect, pipe segments with air bags are arranged at intervals in the longitudinal direction of the tunnel and assembled into a ring to form a plugging ring segment. The pipe segments on the same plugging ring segment are filled with the surrounding rock gap at the ring segment through the expansion of the air bags. The air bags are continuously distributed from the ring upward, so that the surrounding rock gaps between adjacent plugging ring segments in the longitudinal direction are isolated from other positions. Grouting is performed to fill the surrounding rock gaps to resist flotation, prevent the outflow of grouting slurry, improve the grouting efficiency and ensure the grouting filling effect.

[0022] (2) An installation groove is set on the distal side of the segment. After the airbag is installed in the installation groove, the opening of the installation groove is blocked by the protective layer before the airbag is expanded, so that the airbag is sealed in the installation groove, reducing the damage to the airbag during the segment assembly process; after the segment is installed, the protective layer is destroyed by inflating the airbag and expanded into the surrounding rock gap outside the installation groove, and combined with the airbags corresponding to other segments of the same sealing ring segment, the airbag forms a complete ring filling structure outside the sealing ring segment to meet the grouting requirements.

[0023] (3) Fluid media such as gas and slurry can be injected into the airbag to achieve expansion. In order to inject the fluid medium into the airbag, the grouting port of the airbag is extended to the proximal side of the segment, which is convenient for injecting the fluid medium from the inside of the tunnel and easy to operate. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0025] Figure 1 Schematic diagram of shield tunnel segment lining in Examples 1 and 2 of the present invention.

[0026] Figure 2 Schematic diagram of the shield tunnel segment lining after airbag inflation in Examples 1 and 2 of the present invention.

[0027] Figure 3 Schematic diagram of the distribution of airbags on the tube sheet in Examples 1 and 2 of the present invention.

[0028] Figure 4 It is a side view schematic diagram of the airbags distributed on the tube sheet in Examples 1 and 2 of the present invention.

[0029] Figure 5 Schematic diagram of the distribution of the airbags after expansion on the tube sheet in Examples 1 and 2 of the present invention.

[0030] Figure 6 It is a side view schematic diagram of the distribution of the airbags after expansion on the tube sheet in Examples 1 and 2 of the present invention.

[0031] Figure 7 It is a schematic diagram of the airbag protected by the protective layer in Examples 1 and 2 of the present invention.

[0032] Figure 8 It is a schematic diagram of the airbag pushing open the protective layer in Examples 1 and 2 of the present invention.

[0033] Among them, 1-grouting port; 2-air bag; 3-protective layer; 4-expansion air bag; 5-surrounding rock; 6-near side; 7-segment; 8-placement groove. DETAILED DESCRIPTION

[0034] Example 1

[0035] In a typical embodiment of the present invention, Figure 1-Figure 8 As shown, a shield tunnel segment lining is given.

[0036] In shield tunnel construction, the segment lining is a key part of the main structure of the tunnel. However, after the tunnel is excavated, there are often gaps between the segment 7 and the surrounding rock 5. If these gaps are not effectively handled, the stability of the tunnel will be reduced, especially when the groundwater pressure or geological conditions are complex, floating or leakage problems are prone to occur. Traditional grouting filling methods often have problems such as outflow of grouting slurry, low grouting efficiency, and uneven filling effect. Based on this, this embodiment provides a shield tunnel segment lining, by installing airbags 2 on the segment 7, arranging these segments 7 with airbags 2 at intervals in the longitudinal direction of the tunnel to form a blocking ring, and using the expansion of the airbag 2 to fill the gap between the segment 7 and the surrounding rock 5. The airbag 2 can be continuously distributed in the annular direction to form a blocking structure of the gap in the surrounding rock 5, so that a controllable filling grouting space is formed between two adjacent blocking rings, which effectively solves the shortcomings of the traditional grouting filling method and improves the grouting efficiency and filling effect.

[0037] See also Figure 1 The shield tunnel segment lining is formed by the segment 7 and the lining segment. The lining segment and the segment 7 are both basic components of the shield tunnel segment lining. The difference between the two is that the segment 7 is connected with the airbag 2, while the lining segment is not provided with the airbag 2. The segment 7 is one of the basic units of the tunnel lining. The segment 7 is provided with a placement groove 8 to accommodate the installation and expansion of the airbag 2.

[0038] A placement groove 8 is provided on the distal side of the segment 7 (i.e., the side away from the center of the tunnel) for installing the airbag 2 with the grouting port 1. The design of the placement groove 8 needs to take into account the convenience of installation of the airbag 2 and the shape control after expansion, so that the airbag 2 can be accommodated in the placement groove 8 before expansion and complete the assembly work together with the segment 7. After expansion, the airbag 2 can be extended out of the placement groove 8 to fill the gap between the placement groove 8 and the surrounding rock 5 in the circumferential direction.

[0039] The airbag 2 is provided with a grouting port 1, through which a high-pressure fluid (such as slurry, water or compressed air) is injected into the airbag 2 to expand the airbag 2 and fill the gaps in the surrounding rock 5. After expansion, the airbag 2 can be sequentially fitted and spliced ​​into a ring along the ring upward to form an effective blockage, blocking the continuous distribution of the gaps in the surrounding rock 5 in the longitudinal direction of the tunnel.

[0040] like Figure 3 and Figure 4 As shown, multiple segments 7 at the same longitudinal position of the tunnel are assembled into a plugging ring. Figure 5 and Figure 6 As shown, after the airbag 2 on the same sealing ring piece is inflated, it can partially protrude out of the placement groove 8 and fit tightly along the ring upward to form an effective filling and sealing of the gap in the surrounding rock 5. Figure 2As shown, in the longitudinal direction of the tunnel, the sealing rings are spaced apart, and the gaps between the surrounding rocks 5 between adjacent sealing rings form grouting spaces. The grouting spaces become the target areas for subsequent grouting operations, and due to the sealing effect of the airbags 2, the grouting slurry can more effectively fill the gaps and prevent outflow.

[0041] The expansion and blocking effect of the airbag 2 effectively isolates the grouting space from the external environment, preventing the outflow of the grouting slurry. Due to the clear division of the grouting space and the blocking effect of the airbag 2, the grouting operation can be carried out more accurately and efficiently. The close fit and continuous distribution of the airbag 2 along the annular direction ensures the uniform filling of the gaps in the surrounding rock 5, improving the filling effect.

[0042] By effectively filling the gaps in the surrounding rock 5, the interaction force between the pipe segment 7 and the surrounding rock 5 is enhanced, and the overall stability of the tunnel is improved. By filling the gaps in the surrounding rock 5 with grouting, the anti-floating ability of the tunnel structure is increased, and the occurrence of tunnel floating is effectively prevented. The grouting operation process is simplified, the construction efficiency is improved, and the construction cost is reduced. The construction risk caused by the outflow of grouting slurry or poor filling effect is reduced.

[0043] like Figure 1 As shown in Figure 2, the shield tunnel segment lining is continuously distributed in the longitudinal direction of the tunnel. Figure 3 , Figure 5 As shown, in this embodiment, the sealing ring segment is formed by splicing a plurality of segments 7 at the same longitudinal position of the tunnel in the circumferential direction. Figure 2 As shown, a plurality of sealing rings are distributed at intervals.

[0044] In this embodiment, Figure 1 As shown, considering that the segment 7 is in a fan-shaped ring structure, the small-diameter arc surface on the inner side of the segment 7 faces the inner side of the tunnel, and the large-diameter arc surface on the outer side of the segment 7 faces the surrounding rock 5. For the convenience of subsequent description, the inner side of the segment 7 is referred to as the proximal side 6 of the segment 7, and the outer side of the segment 7 is referred to as the distal side of the segment 7, based on the distance from the axis of the ring. The gap in the surrounding rock 5 refers to the gap between the surrounding rock 5 and the distal side of the segment 7.

[0045] It should be pointed out that the airbag 2 provided in this embodiment does not directly achieve the anti-floating effect, but can form a closed grouting space between several plugging rings during the construction of the tunnel segment 7. The method of forming a closed ring at the plugging ring position is to use the expansion of the airbag 2 to achieve plugging, and not every ring lining in the longitudinal direction of the tunnel has an airbag 2. The characteristic of this embodiment is that a certain length in the longitudinal direction of the tunnel is regarded as a grouting group, and the plugging rings corresponding to the two ends of each group use the airbag 2 to form a closed ring to block the longitudinal continuity of the gap of the surrounding rock 5, and grouting is injected into the airbag 2 through the grouting port 1 to expand it, contact the surrounding rock 5 in the radial direction, and contact each other in the annular direction of the airbags 2 to form a closed space, and the middle ring between the two plugging rings is normally grouted, and grouting is performed to fill the gap of the surrounding rock 5 to resist floating, and prevent the slurry in the grouting space from flowing out to other positions.

[0046] like Figure 3 As shown, the airbag 2 is partially fixed in the placement groove 8, which constrains the position of the airbag 2, prevents the airbag 2 from being separated from the pipe segment 7, and ensures the stability of the airbag 2 during tunnel construction and operation. At the same time, the part of the airbag 2 located outside the placement groove 8 can expand freely along the circumferential direction of the plugging ring segment, so that after expansion, it can closely fit the airbag 2 fixed by other pipe segments 7 on the same plugging ring segment. During the expansion of the airbag 2, the side close to the surrounding rock 5 can gradually fit the surface of the surrounding rock 5 as it expands. In the circumferential direction of the plugging ring segment, adjacent airbags 2 gradually contact and fit closely during the expansion process, preventing slurry from overflowing from their contact positions. It not only ensures the fixity of the airbag 2, but also gives it sufficient expansion freedom to adapt to the gaps of surrounding rocks 5 of different shapes.

[0047] The fixing and expansion mechanism of the airbag 2 solves the problem that it is difficult to form a controllable blocking position by the traditional method. Through the expansion of the airbag 2, the flow range of the grouting material in the gap of the surrounding rock 5 is determined, and all gaps are effectively filled.

[0048] like Figure 3 , Figure 5 As shown, the grouting port 1 extends to the proximal side 6 of the segment 7 and is connected to the internal cavity of the airbag 2. This makes the grouting operation more convenient, and the grouting can be completed without complicated operations inside the tunnel. An airbag 2 is provided on at least one segment 7 of the same sealing ring. Before the airbag 2 is expanded, the grouting port 1 can be blocked by a plugging cover. When the airbag 2 needs to be expanded, the grouting port 1 is connected to the external grouting equipment in conjunction with the grouting joint. The design of the grouting port 1 simplifies the grouting process, improves the grouting efficiency, and reduces the problems of leakage and uneven grouting that may occur during the grouting process.

[0049] like Figure 7 , Figure 8As shown, the placement groove 8 is provided with an opening corresponding to the distal side of the segment 7, and the opening is sealed with the protective layer 3. The protective layer 3 is combined with the distal side of the airbag 2 to form a complete arc surface, which helps to improve the flatness of the appearance of the segment 7 and can meet the requirements of the shield machine to grab and assemble the segment 7.

[0050] The protective layer 3 is a thin-walled structure, which can be opened or destroyed when the airbag 2 is inflated. It ensures that the airbag 2 can smoothly protrude from the placement groove 8 during the expansion process and closely fit the gap of the surrounding rock 5. The combined design of the placement groove 8 and the protective layer 3 solves the obstruction problem that may be encountered during the expansion of the airbag 2, and ensures that the airbag 2 can smoothly expand and fill the gap of the surrounding rock 5.

[0051] In this embodiment, the protective layer 3 can be a hinged structure supported by a low-strength material, which can be opened or detached to the side of the opening of the placement groove 8 when the airbag 2 is inflated, so as not to hinder the airbag 2 of the sealing ring from sealing the gap of the surrounding rock 5 at this position. The protective layer 3 can also be a sacrificial structure such as a mortar layer, and the mortar layer is destroyed during the inflation process of the airbag 2, so that the mortar layer is broken and leaves the range of the airbag 2.

[0052] An accommodating groove 8 is arranged on the distal side of the segment 7. After the airbag 2 is installed in the accommodating groove 8, the opening of the accommodating groove 8 is blocked by the protective layer 3 before the airbag 2 is expanded, so that the airbag 2 is sealed in the accommodating groove 8, reducing the damage to the airbag 2 during the assembly process of the segment 7; after the segment 7 is installed, the protective layer 3 is destroyed by the inflated airbag 4 and expanded into the gap between the surrounding rocks 5 outside the accommodating groove 8, and combined with the airbags 2 corresponding to other segments 7 of the same sealing ring segment, the airbag 2 forms a full-ring filling structure outside the sealing ring segment to meet the grouting requirements.

[0053] like Figure 1 As shown, in the longitudinal direction of the tunnel, at least one intermediate ring is provided between adjacent sealing ring pieces. The intermediate ring is composed of a plurality of lining pieces assembled upward along the ring, which increases the overall stability and bearing capacity of the tunnel structure.

[0054] At least one lining sheet between adjacent sealing ring sheets is provided with a grouting hole, which connects the gap between the surrounding rock 5 and the inner side of the intermediate ring. When necessary, additional grouting material is injected into the gap between the surrounding rock 5 through the grouting hole to further enhance the stability and sealing of the tunnel. Some grouting holes can also play the role of exhaust and drainage. The design of the intermediate ring improves the overall stability and bearing capacity of the tunnel structure, and the design of the grouting hole provides a grouting channel for the grouting space, and can perform additional grouting operations when necessary.

[0055] The grouting joint can adopt a standard structure, which reduces the problems of low grouting efficiency and leakage caused by the mismatch between the grouting port 1 and the grouting equipment. The matching design of the grouting joint improves the efficiency and accuracy of the grouting operation, ensuring that the grouting material can be accurately and quickly injected into the air bag 2 and expand to fill the gaps in the surrounding rock 5.

[0056] The overall stability and bearing capacity of the tunnel structure are effectively enhanced by the expansion and filling of the airbag 2 and the setting of the intermediate ring. The design of the intermediate ring and the grouting hole provides more flexibility and options for tunnel construction and later maintenance.

[0057] In addition, the airbag 2 expands after being filled with slurry, closely contacts the outer surrounding rock 5, offsets the buoyancy generated by groundwater, and solves the problem of the pipe segment 7 floating up when the slurry is not solidified. Secondly, during the operation period of the tunnel, especially in special periods such as flood season and rainy season when groundwater is relatively abundant, it effectively avoids the floating of the tunnel pipe segment 7 caused by uneven grouting, disconnection of the pipe segment 7, and water leakage, thereby ensuring the quality of tunnel construction and the safety of later operation.

[0058] Example 2

[0059] In another typical embodiment of the present invention, Figure 1-Figure 8 As shown, a construction method for shield tunnel segment lining is provided, using the shield tunnel segment lining as in Example 1.

[0060] A construction method for shield tunnel segment lining, comprising:

[0061] During shield construction, segment 7 forms a blocking ring segment, and the lining segments at other locations are spliced ​​into a ring to form the lining inside the tunnel;

[0062] A fluid medium is input into the airbag 2 connected to the pipe segment 7 at the grouting port 1, so that the airbag 2 expands and protrudes out of the placement groove 8;

[0063] After the airbags 2 corresponding to the same sealing ring piece are inflated, they can partially protrude out of the placement groove 8, and are sequentially spliced ​​upward along the ring to form a ring to fill the gaps in the surrounding rock 5, so that the gaps in the surrounding rock 5 are cut off here, the grouting port 1 is blocked, and the gaps in the surrounding rock 5 between adjacent sealing ring pieces form a grouting space;

[0064] Grouting is injected into the gaps between the adjacent plugging segments 7 to fill the gaps between the surrounding rocks 5 to support the segments 7 against floating.

[0065] In this embodiment, the fluid medium is slurry, and the slurry is injected into the airbag 2 to support the plugging segment 7.

[0066] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A shield tunnel segment lining, characterized in that: It includes pipe segments, each of which is provided with an installation groove on the distal side, in which an air bag with a grouting port is installed. The pipe segments at the same longitudinal position of the tunnel are spliced ​​into a plugging ring segment. The air bag corresponding to the same plugging ring segment can partially protrude out of the installation groove after expansion, and is sequentially fitted and spliced ​​into a ring along the ring upward to fill the gap in the surrounding rock. In the longitudinal direction of the tunnel, the plugging ring segments are distributed at intervals, and the gap in the surrounding rock between adjacent plugging ring segments forms a grouting space.

2. The shield tunnel segment lining according to claim 1, characterized in that: The airbag part is fixed to the placement groove, and the airbag located outside the placement groove can expand circumferentially along the blocking ring piece, so as to adhere to the airbag fixed by other pipe segments of the same blocking ring piece after expansion.

3. The shield tunnel segment lining according to claim 2, characterized in that: The grouting port of the airbag extends to the proximal side of the pipe segment, and the grouting port is connected to the internal cavity of the airbag.

4. The shield tunnel segment lining according to claim 1, characterized in that: The placement groove is provided with an opening corresponding to the distal side of the pipe segment, and the opening is sealed with a protective layer, and the protective layer is combined with the distal side of the airbag to form a complete arc surface.

5. The shield tunnel segment lining according to claim 4, characterized in that: The protective layer is a thin-wall structure and can be opened or destroyed when the airbag is inflated.

6. The shield tunnel segment lining according to claim 1, characterized in that: It also includes an intermediate ring. In the longitudinal direction of the tunnel, at least one intermediate ring is provided between adjacent blocking ring pieces.

7. The shield tunnel segment lining according to claim 6, characterized in that: The intermediate ring comprises a plurality of lining pieces assembled upwardly along the ring, and at least one lining piece between adjacent blocking ring pieces is provided with a grouting hole, which communicates the surrounding rock gap and the inner side of the intermediate ring.

8. The shield tunnel segment lining according to claim 1, characterized in that: At least one pipe segment of the same sealing ring segment is provided with an air bag, and the grouting port is matched with a grouting joint.

9. A method for constructing a shield tunnel segment lining, using the shield tunnel segment lining as claimed in any one of claims 1 to 8, characterized in that: include: In shield construction, the segments form blocking ring segments, and the lining segments at other locations are spliced ​​into rings to form the lining inside the tunnel; Inputting fluid medium into the airbag connected to the pipe segment at the grouting port, so that the airbag expands and protrudes out of the placement groove; After the airbag corresponding to the same sealing ring segment is inflated, it can partially protrude out of the installation groove, and be fitted and spliced ​​upward along the ring to form a ring to fill the surrounding rock gap, so that the surrounding rock gap is cut off here, the grouting port is blocked, and the surrounding rock gap between adjacent sealing ring segments forms a grouting space; grouting is injected into the surrounding rock gap between adjacent sealing pipe segments to fill the surrounding rock gap to support the pipe segment to resist floating.

10. The construction method of shield tunnel segment lining according to claim 9, characterized in that: The fluid medium is slurry, which is injected into the airbag to support the plugging segment.

Citation Information

Cited By

  • Pipe piece structure and construction method thereof

    CN119777886A

  • A segment structure and a construction method thereof

    CN119777886B

  • Cabin-separated grouting method for strengthening shield tunnel wall back grouting control

    CN119860238A

  • A method for reinforcing shield tunnel wall post grouting control by compartment grouting