Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

1202results about How to "Simplify the construction process" patented technology

Three-layer overlapping assembly type underground station assembling trolley equipment

The invention relates to the technical field of construction trolley equipment, in particular to three-layer overlapping assembly type underground station assembling trolley equipment which comprises a movable pedestal, a movable platform, a movable platform, a movable platform, a movable platform and a movable platform, wherein the movable pedestal is provided with a shear-type lifting platform which ascends and descends in the vertical direction; the fixed frame seat is fixedly mounted on the shear type lifting platform; the side wall assembling assembly comprises a horizontal connecting plate which is horizontally and movably mounted on one side of the fixing frame base and an L-shaped supporting plate which is mounted at the outer end of the horizontal connecting plate; the moving block is horizontally and movably mounted on the other side of the fixing frame base through a driving source, and a longitudinal beam supporting plate and a clamping jaw are mounted on the moving block; the arranged movable pedestal is matched with the fixed frame seat, so that a lifting function and a mounting site are provided, and the device can be suitable for splicing operation of a three-layer overlapping assembly type underground station; the equipment has mobility, the structure is stable and reliable in the construction process, and the requirement for gravity bearing of the prefabricated part can be met; quick positioning and assembling of the assembling position of the prefabricated part can be achieved, then the construction procedure is simplified, and the construction efficiency is improved.
Owner:CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD

Efficient construction multi-element real-time dynamic regulation and control method based on intelligent algorithm

The invention relates to the technical field of building construction regulation and control, and discloses an efficient construction multi-element real-time dynamic regulation and control method based on an intelligent algorithm, and the method comprises the steps: building a personnel database, and recording the competent work types, skill levels and working experience of personnel; according to a construction project, screening personnel based on an intelligent algorithm, and performing personnel allocation; monitoring the material inventory of the construction project in real time; acquiring data of personnel position, material supply, equipment operation state, construction progress and construction quality of the construction site; based on an intelligent algorithm, adjusting task distribution of the personnel according to the acquired personnel position state data; according to the efficient construction multi-element real-time dynamic regulation and control method based on the intelligent algorithm, human resources can be reasonably utilized, supply of construction materials is guaranteed, the construction efficiency can be effectively improved, the construction quality is guaranteed, and the construction cost is reduced.
Owner:EAST CHINA JIAOTONG UNIVERSITY

Cable laying construction method and system based on digital twin technology

The invention relates to the technical field of cable laying construction based on the digital twin technology, and particularly discloses a cable laying construction method and system based on the digital twin technology, and the method comprises the steps: collecting tension data in a cable laying process in real time through a tension sensor disposed at a construction site, and comparing the tension data with historical tension data in a digital twin system, judging the accuracy of the real-time data, calculating a stress accumulation index and a tension fluctuation index based on the accurate data, and calculating a tension abnormal coefficient through comprehensive analysis so as to judge whether the tension data in the construction process is normal or not; establishing a risk assessment model, training the model by using normal data, inputting abnormal data into the model for risk assessment, dividing the cable laying construction process into different risk levels, and taking corresponding early warning and countermeasures according to the different risk levels; according to the invention, by introducing a digital twinning technology and an intelligent analysis means, the safety and reliability of cable laying construction are effectively improved.
Owner:SHAANXI THOMSON ELECTRIC POWER TECH CO LTD

Self-resetting assembly type reinforced concrete frame structure

The invention belongs to the technical field of assembly type buildings, and discloses a self-resetting assembly type reinforced concrete frame structure which comprises a plurality of prefabricated concrete columns which are vertically connected with one another, the prefabricated concrete columns are connected with prefabricated concrete beams through dampers of assembly energy dissipation nodes, and in-column embedded steel connecting pieces are embedded in the upper portions of the prefabricated concrete columns. And a column bottom embedded steel connecting piece is embedded at the bottom. Two energy dissipation structures of the dog bone type weakening steel plate and the multi-seam energy dissipation steel plate are arranged, replacement is very convenient and fast, the PVC pipes are embedded in advance before concrete beams and columns are poured, the steel strands penetrate through the reserved PVC pipes after forming, then the steel strands are tensioned to apply prestress, the steel strands in the columns and the steel strands in the beams both pass through the connecting joints, and the steel strands in the columns and the steel strands in the beams are connected through the connecting joints. Not only is the self-resetting capability provided, but also the connection strength of the node is enhanced; the structure is simple in construction, high in energy dissipation capacity, good in self-resetting performance and easy to repair, and the structure has excellent anti-seismic performance under high-strength earthquakes.
Owner:HUNAN UNIV

Device special for removing waterlogging and reducing waterlogging and concealed pipe drainage whole-course flow increasing method

The invention discloses a device special for removing waterlogging and reducing waterlogging and a concealed conduit drainage whole-course flow increasing method, and belongs to the technical field of agricultural drainage, the device comprises an upper end water inlet strengthening unit, a middle section path correction unit and a tail end negative pressure flow increasing unit, and the upper end water inlet strengthening unit is exposed out of the earth surface or buried 0-30 cm below a field plough layer; the middle section path correction unit is shallowly buried in a reverse slope and a downward slope after being closely connected with the upper end water inlet strengthening unit; the tail end negative pressure flow increasing unit is connected to the tail part of the middle section path correcting unit; the upper end water inlet strengthening unit comprises a special-shaped filter pipe and a sinking filter body, and the special-shaped filter pipe is located on the upper layer of the whole device and is directly close to the earth surface, a water accumulation area of the earth surface or a field plough layer; the settling and filtering body is filled with sand gravels to form an hourglass shape with wide upper and lower parts and a narrow middle section, and surrounds the special-shaped filtering pipe. The problem that in the prior art, due to the fact that a concealed pipe drainage technology is small in soil infiltration characteristic, improvement of waterlogging drainage efficiency is limited is solved. The drainage system has the advantages of high drainage efficiency and large drainage amount.
Owner:CHINA INST OF WATER RESOURCES & HYDROPOWER RES +3

Formula and preparation method of high-strength recycled concrete

The invention relates to the field of recycled concrete, and discloses a high-strength recycled concrete formula and a preparation method thereof, the high-strength recycled concrete formula comprises the following raw materials by weight: 180-240 parts of cement, 600-800 parts of hydrophobic modified recycled coarse aggregate, 180-280 parts of recycled fine aggregate, 400-600 parts of sand, 300-500 parts of fly ash, 60-120 parts of silica fume, and 20-30 parts of a water reducer, the modified waste rubber powder is prepared from, by weight, 25-35 parts of modified waste rubber powder, 10-40 parts of polyethylene wax, 2-4 parts of m-phenylenediamine and 12-16 parts of tetramethyl orthosilicate. In the invention, by using a large amount of recycled aggregate (coarse aggregate and fine aggregate), the exploitation of new natural resources is effectively reduced, the reutilization rate of building wastes is improved, and by optimizing the proportion and adding a plurality of modifiers (such as silica fume, fly ash, modified waste rubber powder and the like), the mechanical properties such as compression resistance, fracture resistance and the like of the concrete are remarkably improved; by adding the hydrophobic modified recycled coarse aggregate and the penetrant, the impermeability and durability of the concrete are enhanced, so that the performance and the application range of the recycled concrete are improved.
Owner:JIAXING BOAO BUILDING MATERIALS CO LTD

Tunnel hard rock non-blasting excavation method

InactiveCN113586076AReduce the number of drilled holesOvercoming the blast effectTunnelsDrill holeEnvironmental geology
The invention provides a tunnel hard rock non-blasting excavation method. The tunnel hard rock non-blasting excavation method can realize efficient excavation of complete or relatively complete hard rock without adopting large excavation equipment such as a heading machine and the like , and is characterized by comprising the following steps of 1, drilling contour holes along a tunnel face contour line so as to determine a tunnel excavation range, and determining each drilling and grooving position according to the excavation range, then, forming and drilling a plurality of cavity expanding holes in the position close to the positions; 2, drilling a plurality of rows of guide holes between the contour holes and the cavity expanding holes; 3, drilling groove forming holes which are meshed and overlapped with each other at the determined drilling and grooving positions, and finally forming a groove cavity; 4, enabling the cavity expanding holes near the groove cavity to be subjected to impact crushing, and therefore expanding excavation is conducted on the groove cavity; 5, according to a certain excavation sequence, starting from the guide holes close to the expanded and excavated groove cavity, adopting a hydraulic breaking hammer for conducting impact breaking on the guide holes, so that excavation of the rock mass of a main body part is completed; and 6, conducting impact crushing on the contour holes.
Owner:WUHAN UNIV

Deep thick hard rock stratum roof directional long drill hole staged fracturing weakening method and system

The invention discloses a deep thick and hard rock stratum roof directional long drill hole staged fracturing weakening method and system, and relates to the technical field of coal mining. The method comprises the following steps: determining a fracturing target horizon according to mining area geological data and to-be-treated working face monitoring data; a drill site construction position is determined, and drilling track parameters are determined in the fracturing target horizon; a fracturing assembly is installed, fracturing construction parameters are determined, and the operation sequence of drilling construction and fracturing construction is determined; and drilling construction is conducted according to the operation sequence, fracturing construction is conducted through the fracturing assembly, and the stability condition of the roadway is monitored in the whole process and before and after. The technical scheme aims at weakening far-field strong stress of a top plate of a thick and hard coal rock stratum overlying a deep coal mine underground roadway, and is particularly suitable for design of a directional long drilling hole fracturing weakening scheme in the field of deep thick and hard rock stratum top plate pressure relief and roadway protection engineering. And the roadway deformation condition under the disturbance influence of advanced high supporting stress and mining strong stress of the working face is improved.
Owner:HUAJIN COKING COAL CO LTD SHAQU NO 2 COAL MINE

Prefabricated UHPC (Ultra High Performance Concrete) surface protection structure for water delivery gallery of ship lock and construction method

The invention provides a ship lock water delivery gallery prefabricated UHPC surface protection structure and a construction method, and the structure comprises a gallery bottom wall surface protection structure which is located at the bottom wall of a water delivery gallery and is a cast-in-place UHPC concrete structure; the two gallery side wall surface protecting structures are arranged on the two side wall surfaces of the water conveying gallery correspondingly, and each gallery side wall surface protecting structure is composed of a plurality of prefabricated UHPC side plates; the gallery top wall surface protecting structure is located on the top wall of the water conveying gallery and composed of a plurality of prefabricated UHPC top plates, and the prefabricated UHPC top plates are erected above the two gallery side wall surface protecting structures. The UHPC prefabricated plate is used as the inner surface of the water delivery gallery by utilizing the characteristics of high durability, high mechanical property and good impact and wear resistance of the UHPC material, so that the structural durability of the water delivery gallery of the ship lock is greatly improved, the UHPC is used for protecting the water delivery gallery instead of impact and wear resistant concrete, the volume of the UHPC is about one twentieth of that of the impact and wear resistant concrete, and the service life of the water delivery gallery is prolonged. And the cost is about one fifth of that of anti-impact and wear-resistant concrete.
Owner:CCCC SECOND HARBOR ENGINEERING CO LTD +1

Steel-UHPC combined formwork core-filled concrete pier column and construction method thereof

The invention provides a steel-UHPC combined formwork core-filled concrete pier column and a construction method thereof. A combined formwork comprises a UHPC outer shell and a steel plate inner shell which are formed by pouring from outside to inside in sequence. The UHPC shell is arranged on the outer layer, and the concrete column is protected by exerting the characteristic of high durability of materials; the steel plate inner shell comprises a steel plate, short shear nails and stiffening ribs, the short shear nails are welded to the outer side of the steel plate so as to enhance the connectivity with the UHPC outer shell, and the stiffening ribs are welded to the inner side of the steel plate so as to improve the overall rigidity of the combined formwork. The steel plate inner shell replaces a traditional column body steel reinforcement framework, the problem that the steel reinforcement framework is complex to hoist and position in the construction process is solved, and the construction efficiency and quality are effectively improved. The steel plate inner shell and the UHPC outer shell are prefabricated together, so that the durability of the column shell and the steel-UHPC combined formwork core-filled concrete pier column is improved; the combined formwork is tightly connected with the filling core, the radial restraining effect on the inner-layer concrete column is fully achieved, and the bearing capacity and the shock resistance of the steel-UHPC combined formwork core-filling concrete pier column are improved.
Owner:WUHAN UNIV OF TECH

Intelligent chemical engineering site construction safety and quality detection method and system based on big data

The invention relates to the technical field of intelligent chemical engineering, and discloses an intelligent chemical engineering construction safety and quality detection method based on big data, and the method comprises the following steps: 1, installing a monitor and a sensor; step 2, intelligent analysis; step 3, predictive maintenance; step 4, risk assessment; step 5, quality control; step 6, safety management; 7, accident prevention; 8, remote real-time management is carried out; step 9, decision support; step 10, intelligent reporting; and step 11, displaying an interface. According to the intelligent chemical engineering site construction safety and quality detection method and system based on big data, through real-time monitoring and risk assessment, the intelligent chemical engineering site system can improve the safety management level of a construction site and reduce accidents, and the system can predict potential safety risks and take measures to avoid the potential safety risks by utilizing predictive maintenance and accident prevention technologies; and by using big data and an intelligent optimization algorithm, the resource allocation and the construction process are optimized, and the construction efficiency is improved.
Owner:DATANG YUNCHENG POWER GENERATION CO LTD

Integral rotating type structure during strong earthquake

The integral rotating type structure in the strong earthquake comprises a frame structure, a cup opening foundation and an under-column independent foundation. The cup foundation is arranged in the center of the bottom of the structure; the under-column independent foundations are arranged on the periphery of the cup foundation, and the bottom face elevation of the under-column independent foundations is higher than the top face elevation of the cup foundation. The frame structure comprises a center column, side columns, frame beams, rotation energy dissipation supports, elastic telescopic energy dissipation pieces and tension-compression-resistant elastic energy dissipation supports. First steel sleeves are arranged at the lower ends of the central columns; a first bottom plate is arranged at the bottom of the first steel sleeve; the swivel energy consumption support is inserted into the cup foundation; the first bottom plate is connected with the swivel energy dissipation support; an elastic telescopic energy consumption piece is arranged on the side wall of the cup opening foundation slot; second steel sleeves are arranged at the lower ends of the side columns, and second bottom plates are arranged at the bottoms of the second steel sleeves. The tension-compression-resistant elastic energy dissipation support is installed on the top of the under-column independent foundation, and the second bottom plate is connected with the tension-compression-resistant elastic energy dissipation support. The earthquake-proof system solves the technical problem that a traditional earthquake-proof system is not economical or difficult to repair after a major earthquake.
Owner:HAINAN UNIV

High-pile wharf beam and slab erecting integrated equipment

The invention relates to the technical field of wharf construction, in particular to high-pile wharf beam and slab erection integrated equipment which comprises a cross beam, and a longitudinal beam capable of transversely moving is arranged at the top of the cross beam; the hoisting trolley can longitudinally move on the longitudinal beam, and the hoisting trolley is used for hoisting the beam plate; the supporting leg assembly supports the cross beam, a longitudinal moving rail is arranged at the bottom of the supporting leg assembly, and the supporting leg assembly longitudinally moves on the longitudinal moving rail; the two ends of the longitudinal beam are provided with cantilever sections, the cantilever sections extend to the longitudinal outer sides of the supporting leg assemblies, during beam lifting, the longitudinal moving rails are laid on the long-piled wharf, the supporting leg assemblies drive the cross beam to longitudinally move to the edge of the long-piled wharf on the longitudinal moving rails, then the crane carriage is moved to the cantilever sections, and the crane carriage can move to the outer side of the edge of the long-piled wharf; and the crane carriage can hoist the beam plate outside the long-piled wharf, so that the step of reversing the beam through equipment such as a gantry crane and a beam transporting vehicle is avoided, the construction procedure is simplified, and the construction efficiency of the long-piled wharf is improved.
Owner:THE SECOND ENG COMPANY OF CCCC FOURTH HARBOR ENG +1

Slope reinforcing device

The utility model provides a slope reinforcing device, and belongs to the technical field of highway slope protection. The slope reinforcing device comprises a reinforcing frame and a plurality of mounting openings formed in the reinforcing frame, a plurality of reinforcing supports are welded to the inner side walls of the mounting openings, a plurality of anchoring mechanisms are mounted on the reinforcing supports, each anchoring mechanism is composed of a fixing ring, a plurality of through holes, a mounting piece and a fixing piece, and the through holes are formed in the surface of the fixing ring at equal intervals. The top end of the mounting piece is attached to the bottom end of the fixing ring, the bottom end of the fixing piece is connected with the interior of the mounting piece in an inserted mode through the inner ring of the fixing ring, and the top end of the fixing piece is fixed to the top end of the mounting piece through a bolt. Through the modular design of the anchoring mechanisms and the synergistic effect of the protective net and the drainage groove, all the parts can be independently disassembled and replaced, and later maintenance and overhaul work is facilitated. And meanwhile, slope instability caused by water accumulation or soil loosening is prevented.
Owner:中国建设基础设施有限公司 +2

Fabricated steel bridge structure system and installation and construction method thereof

The invention relates to a fabricated steel bridge structure system and an installation and construction method thereof, and belongs to the technical field of steel bridge construction. An outer side cylinder barrel is installed in the center of a river, the steel bridge left section body and the steel bridge right section body are symmetrically arranged, the outer side cylinder barrel is arranged on the outer side of the main steel pipe pile, water is contained in the outer side cylinder barrel, the main steel pipe pile is sleeved with a floating barrel, the bottom of the floating barrel floats in the outer side cylinder barrel, an iron chain is arranged at the bottom of the floating barrel, and the steel bridge left section body and the steel bridge right section body are symmetrically arranged. The other end of the iron chain is fixedly connected with the outer side cylinder barrel, a left side connecting frame connected with the steel bridge left section main body and a right side connecting frame connected with the steel bridge right section main body are arranged on the two side walls of the floating barrel correspondingly, and the other end of the steel bridge left section main body and the other end of the steel bridge right section main body are supported on a steel bridge land support A and a steel bridge land support B correspondingly. The construction method has the following beneficial effects that the construction process is simplified, and the construction efficiency is high. The problem that the fabricated steel bridge is affected by terrains, manufacturing cost and the like is solved.
Owner:SHANDONG HUAYIGANGJI CO LTD

Hoisting construction method of truck crane in environment with limited bearing capacity of floor slab

InactiveCN119083737AEnsure safe hoisting constructionAvoid overload damageBuilding repairsBuilding material handlingFloor slabArchitectural engineering
The invention discloses a hoisting construction method of a truck crane in an environment with limited bearing capacity of a floor slab, which is characterized in that supporting legs of the truck crane are erected on the floor slab and are positioned right above a structural beam, so that the counter force of the supporting legs of the truck crane acts on the structural beam. If no structural beam exists below the supporting leg of the truck crane, a conversion steel beam is erected between the two structural beams located in front of and behind the supporting leg, and the supporting leg is erected on the conversion steel beam. The invention relates to the technical field of building construction, and can solve the problem that in the prior art, a supporting full framing needs to be arranged at the bottom of a floor slab in truck-mounted crane hoisting construction under the environment that the bearing capacity of the floor slab is limited.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD

Composite metal roof system and construction method thereof

The invention discloses a composite metal roof system and a construction method thereof. The construction method comprises the following steps that firstly, a roof truss supporting structure is constructed, wherein the roof truss supporting structure is welded to the top of a main body structure; and secondly, a main purline, a secondary purline, a bottom plate layer, a sound absorption layer, a supporting layer, a vapor barrier layer, a heat preservation layer and a waterproof layer are sequentially constructed on the top of the roof truss supporting structure and located around the daylighting roof structure to be constructed, an inner connecting keel is arranged on the inner side of the heat preservation layer in the annular direction, and an outer connecting keel is arranged on the outer side of the heat preservation layer in the annular direction. And thirdly, skylight keels are constructed. And 4, constructing an inner drainage ditch, an outer drainage ditch and a radial drainage ditch. And 5, constructing a fixed glass window and an openable glass window. And 6, the waterproof layer and the facing layer are sequentially constructed until the construction is finished. The technical problems that a traditional steel truss roof structure is complex in construction process, leakage risks exist, and heat preservation and sound insulation performance is poor are solved.
Owner:CHINA CONSTR FIRST BUREAU GRP SOUTHEAST CONSTR CO LTD

Cross concrete filled steel tubular column reinforced node for cooling tower convenient to construct

A reinforced joint of a crossed concrete filled steel tubular column for a cooling tower convenient to construct comprises four steel supporting columns, a radial reinforcing plate and an annular reinforcing plate, the four steel supporting columns are welded to form the crossed steel tubular joint of an X-shaped structure, and the radial reinforcing plate and the annular reinforcing plate are welded in the crossed steel tubular joint. The four steel supporting columns and the positions of the reinforced joints are all filled with concrete. Compared with the prior art, the reinforcing joint has the following advantages: (1) the reinforcing joint is not provided with a stiffening rib inside the steel pipe, so that the condition that a plurality of welding seams are mutually crossed is avoided, the construction process is simplified, and the manufacturing is simple; meanwhile, the reinforcing part is not exposed outside the component, and the appearance is attractive. And (2) the reinforced node can be designed based on the principle of'strong node and weak component ', the annular reinforcing plate and the radial reinforcing plate respectively improve the in-plane and out-plane rigidity of the crossed steel tube concrete, and also improve the steel content of the section, so that the bearing capacity of the node is improved, and the node is safer and more reliable.
Owner:HARBIN INSTITUTE OF TECHNOLOGY (SHENZHEN) (INSTITUTE OF SCIENCE AND TECHNOLOGY INNOVATION HARBIN INSTITUTE OF TECHNOLOGY SHENZHEN)

Design method for steel bar component

The invention discloses a design method for a steel bar component. According to the method, a large amount of historical design data can be quickly processed and analyzed through the machine learning model, and key factors influencing axial force reinforcement calculation are automatically identified, so that the calculation efficiency is improved. The machine learning model automatically completes calculation through an algorithm, and errors in the calculation process are reduced. The fully trained machine learning model can accurately predict the reinforcing steel bar area based on the input parameters, and the design accuracy is improved. A machine learning model can discover a hidden relationship between data by analyzing historical data, which is particularly important for reinforcement calculation caused by axial force because the axial force is related to various factors, such as structure size, material characteristics and the like. Machine learning is applied to the reinforcement calculation process caused by the axial force, the intelligent level of design can be remarkably improved, the design efficiency and quality are improved, and meanwhile powerful technical support is provided for cost optimization.
Owner:HEBEI UNIV OF TECH

Pile sinking construction method for offshore foundation steel pipe pile

The offshore foundation steel pipe pile sinking construction method comprises the steps that steel pipe piles are positioned; perpendicularity control: after the pile tip of the steel pipe pile enters the mud, the crane stops hooking, and a total station is erected on the pile stabilizing platform to measure the perpendicularity of the steel pipe pile; the crane continues to hook downwards, and when the steel pipe pile enters the mud by 1.5-2.5 m, a hydraulic hammer located at the top of the steel pipe pile is started so that the steel pipe pile can be sunk; elevation control is conducted, specifically, a hydraulic hammer is sleeved with a hammer cap sleeve with the known length, a pile feeder with the known length is arranged between the steel pipe pile and the hammer cap sleeve, after scale marks are arranged on the pile feeder, reading is conducted through the scale marks, and the steel pipe pile is controlled to be sunk to the elevation after the hydraulic hammer is started; and acceptance. By means of the pile sinking construction method for the offshore foundation steel pipe pile, the problem that in the prior art, due to the fact that signals are unstable, measurement errors are large and the like, construction measurement cannot meet the requirements for elevation and perpendicularity control of the steel pipe pile easily, and the pile sinking precision cannot meet design specifications can be solved.
Owner:CCCC THIRD HARBOR ENGINEERING CO LTD

Floating suspension type jacket high-pile wharf structure suitable for ultra-large water depth and construction method of floating suspension type jacket high-pile wharf structure

The invention discloses a floating suspension type jacket high-pile wharf structure suitable for ultra-large water depth and a construction method, and belongs to the technical field of high-pile wharfs. The structure comprises a jacket, a pile foundation and an upper structure; the lower part of the upper structure is connected with a pile foundation; the jacket is installed on the lower end face of the upper structure and connected to the pile foundation. The upper structure comprises a sleeve box type pile cap, a cross beam, a longitudinal beam and a laminated panel; the sleeve box type pile cap is installed on the upper end face of the pile foundation. The longitudinal beam system is installed on the upper end face of the sleeve box type pile cap. The cross beams are mounted between the adjacent longitudinal beam systems; and the laminated panel is flatly laid on the surface layer of the upper structure. The structure adapts to a large-water-depth and large-flow-velocity environment by exerting the structural advantages of the structure, and the structure is small in underwater construction work amount, high in assembly degree, small in environmental influence, short in construction period and low in engineering investment.
Owner:CCCC THIRD HARBOR CONSULTANTS

Mounting and positioning device for building construction and mounting and positioning method thereof

The invention provides a mounting and positioning device for building construction and a mounting and positioning method thereof, and belongs to the technical field of building construction. Comprising four guide rail frames which are symmetrically arranged in pairs, the outward ends of the four guide rail frames are fixedly connected with fixing blocks, and the bottoms of every two fixing blocks in the same direction are fixedly connected with supporting pieces; the positioning assembly is used for achieving mounting and positioning of the prefabricated wall panel, and the positioning assembly is connected with the supporting piece; and the supporting assembly is used for improving the stability of the positioning assembly, and the supporting assembly is connected with the positioning assembly. By arranging the folding assembly, the second positioning plate can be flexibly folded or unfolded according to the height difference of the prefabricated wallboards in the use process of the mounting and positioning device. By means of the design, the friction distance of the low wall body in the installation process is reduced, abrasion is reduced, it is guaranteed that the two sides of the top end of the high wall body are sufficiently supported, and therefore the stability of the whole structure is improved.
Owner:宿迁新居科技有限公司

Fabricated track structure facilitating vibration reduction upgrading and construction method

The invention relates to a fabricated track structure facilitating vibration reduction upgrading and a construction method. According to the fabricated track structure convenient for vibration reduction upgrading, the prefabricated track plate is provided with a first supporting surface and an arrangement space, and the top surface of the base is provided with an embedded sleeve, so that a supporting adjusting piece or a special vibration reduction component can be detachably connected between the prefabricated track plate and the base through a fixing bolt; therefore, the replacement from the support adjusting piece to the special vibration reduction component can be realized, that is, common vibration reduction can be upgraded to special vibration reduction; and the corners are arranged through the prefabricated track plates, so that the second supporting surfaces of the prefabricated track plates are lower than the first supporting surfaces, and then the anti-vibration pads can be laid between the prefabricated track plates and the base after the supporting adjusting pieces are dismounted, namely common vibration reduction can be upgraded to high-level vibration reduction. According to the assembly type track structure facilitating vibration reduction and upgrading, conversion or upgrading from common vibration reduction to high-level vibration reduction and special vibration reduction can be achieved at the same time. And compared with the prior art, the replacement efficiency is high.
Owner:CHINA RAILWAY ERYUAN ENGINEERING GROUP CO LTD

Combined retaining device for final joint of immersed tunnel and dry-wet alternate construction method thereof

The invention belongs to the technical field of immersed tube tunnel engineering, and relates to an immersed tube tunnel final joint combined type retaining device and a dry-wet alternate construction method thereof.The device comprises a retaining part, a force transmission part and a supporting part, the retaining part is poured to an underground diaphragm wall and arranged opposite to a bracket prefabricated on a final joint, and the force transmission part is connected with the supporting part; the distance L from the top of the retaining piece to the horizontal plane meets the condition that L is greater than or equal to H-h + l, so that the final joint is undocked and mounted when the final joint is constructed; the force transmission piece is arranged between the retaining piece and the bracket; the force transmission part comprises a first force transmission part, a second force transmission part and a third force transmission part which are connected in sequence, the first force transmission part is used for being in contact connection with the underground diaphragm wall, and the third force transmission part is used for being in matched connection with a steel cofferdam installed above the final joint; the supporting piece is used for connecting the upper portion of the force transmission piece and the underground diaphragm wall. The construction technology of the retaining device is simplified, the construction difficulty is reduced, rapid and convenient construction of the final joint is achieved, and the construction period is shortened.
Owner:CCCC FIRST HARBOR ENGINEERING CO LTD +1

Concrete beam column structure locally internally provided with thin-wall steel pipes and mounting method of concrete beam column structure

The invention belongs to the technical field of concrete beam column structures, and particularly relates to a beam column structure locally internally provided with thin-wall steel pipes and a mounting method of the beam column structure. By reasonably arranging the internally-arranged steel pipes and the reinforcing steel bars, the effects of reducing the dead weight of the structure and improving the bearing capacity are achieved. Due to the application of the steel pipe, the bending resistance and the shearing resistance of the concrete member are enhanced, and generation and expansion of cracks are effectively delayed. In addition, as the steel pipe has high strength and rigidity, the structure can still keep stable under the condition of high load, and is particularly suitable for occasions needing high bearing capacity, such as bridges and buildings. The stress characteristics of beam column components are fully considered, and a novel design method for internally-arranged steel pipe concrete is provided. Through detailed analysis of construction details and working principles, professional technicians can implement the method according to description, so that the safety and economical efficiency of an engineering structure are effectively improved. The shear resistance, the bending resistance and the overall stability of the structure are improved.
Owner:XI'AN UNIVERSITY OF ARCHITECTURE AND TECHNOLOGY

Construction method for reinforcing historical building wall through high-ductility compound

The invention discloses a construction method for reinforcing a historical building wall through a high-ductility compound. The construction method comprises the steps that S1, wall skin of the historical building wall is chiseled away; s2, filling holes in the wall surface after the wall skin is chiseled away; s3, arranging shear keys on the wall surface; s4, base layer treatment, wherein lime mortar on the wall surface is polished to the surfaces of bricks in the wall body; s5, joint removing, wherein lime mortar in the joints between the adjacent bricks is removed; s6, mortar cake making, wherein a plurality of mortar cakes are arranged on the wall face in a scattered mode, and the surfaces of the multiple mortar cakes form a reference face; s7, the wall surface is wetted; S8, jointing is conducted, specifically, a high-ductility compound is adopted to be filled in a gap between the adjacent bricks at least twice, and compaction and roughening are conducted; and S9, a high-ductility compound is pressed and smeared on the wall face. The invention aims to solve the problems that the core structure of the brick wall masonry of the historical building is not damaged, the manual plastering and pressing technology is adopted, the construction process is simple, the brick wall is tightly combined to form a whole, the construction quality is ensured, the weight is light, and the foundation load is reduced.
Owner:DECAI DECORATION

Subway rail transit underground space emergency communication system and arrangement method thereof

The invention relates to the field of mobile data communication services, in particular to a subway rail transit underground space emergency communication system and an arrangement method thereof. The subway rail transit underground space emergency communication system provided by the invention comprises a first communication link used for transmitting service data in a first state; the second communication link is used for transmitting service data in a second state; the communication link monitoring module is in signal connection with the first communication link and is used for monitoring the signal-to-noise ratio of data transmission in the first communication link; and the communication link switching module is in signal connection with the communication link monitoring module, is respectively in signal connection with the first communication link and the second communication link, and is used for switching the data transmission path from the first communication link to the second communication link according to the signal-to-noise ratio of data transmission in the first communication link. According to the invention, through double-link redundancy and rapid switching, automatic switching to a standby link is realized under abnormal conditions such as optical fiber faults or power interruption, and continuous and uninterrupted communication is ensured.
Owner:ZHENGZHOU ZHONGJIAN SHENTIE RAIL TRANSIT CO LTD

Process for mineralizing concrete mixture by using carbonic acid solution and process method thereof

The invention discloses a process for mineralizing a concrete mixture by using a carbonic acid solution and a process method thereof. The process comprises a heat exchange module, a gas-liquid mixing module, an ion additive dissolving module and a mixture mineralizing module, after the carbonic acid solution passes through the heat exchange module, the gas-liquid mixing module and the ion assistant dissolving module, an ion enhanced carbonic acid solution is output; through the mixture mineralization module, concrete, gravel and cement raw materials are mixed with an ion-enhanced carbonic acid solution, and a carbonic acid solution mineralized concrete mixture is prepared. As only equipment of the carbonic acid solution needs to be additionally arranged on an existing concrete production line, carbon dioxide atmosphere curing does not need to be carried out after the concrete is hardened, the fluidity of a concrete mixture is not affected, the construction performance of the concrete can be guaranteed, and no negative influence is caused to an existing premixed concrete pouring forming process.
Owner:CLEAR ZERO CARBON (BEIJING) TECH CO LTD +2

Welding sealing device and method for in-service nuclear power plant low alloy steel pump shell

The invention provides a welding sealing device and method for an in-service nuclear power plant low alloy steel pump case, the sealing device comprises a pump case side welding base, a heat shield side welding base and a sealing ring, the pump case side welding base comprises a first mounting part and a second mounting part which are arranged at an included angle; the first mounting part penetrates through a mounting gap between the pump shell main flange and the heat shield, and the second mounting part extends to the outer side of the mounting gap; the heat shield side welding base is arranged on one side, facing the second mounting part, of the heat shield; the two ends of the sealing ring are connected with the second installation part and the heat shield side welding base correspondingly so as to seal the installation gap. According to the low-alloy steel pump shell welding sealing device for the in-service nuclear power plant, one end of the shell side welding base and the pump shell main flange are in angle welding, the welding heat input amount is small, and the situation that the assembly of a main pump core bag and the pump shell is affected due to structural deformation caused by too large heat input in the welding process can be avoided.
Owner:SHANGHAI NUCLEAR ENGINEERING RESEARCH & DESIGN INSTITUTE CO LTD

Associated gas recovery system

The invention provides an associated gas recovery system. A treatment platform of the associated gas recovery system is arranged on the sea surface in a floating manner; one end of the pipe gallery is detachably connected with the production platform, and the other end is connected with the processing platform; the pipe gallery can stretch out and draw back so as to keep being connected with the processing platform when the position of the processing platform moves. The gas conveying pipeline is arranged in the pipe gallery, one end of the gas conveying pipeline is detachably and flexibly connected and communicated with the production platform, and the other end of the gas conveying pipeline is flexibly connected and communicated with the treatment platform, so that associated gas on the production platform can be conveyed to the treatment platform through the gas conveying pipeline, and the gas conveying pipeline can move along with the position of the treatment platform and keeps communicating with the treatment platform; under the condition that the pipe gallery and the gas conveying pipeline are both disconnected from the production platform, the associated gas recovery system can be connected with the other production platform so as to recover associated gas of the other production platform. The utilization rate of the recovery system is improved, the construction process of the associated gas recovery system is simplified, and the cost for recovering the associated gas of the offshore oilfield is reduced.
Owner:CNOOC GAS & POWER GRP