The invention provides a water-rich sand layer
shield tunneling muck improvement construction test method. The method comprises the following steps that 1, a prefabricated modifier is added into a
shield tunneling machine cutter head, a soil bin and a
screw conveyor; 2, modifier parameters are determined, wherein 100m in front of a shield is selected as a test section, the same tunneling parameters are set, different modifier parameters are set, and trial tunneling is carried out on the test section; 3, tunnel parameters, the soil outlet amount and
muck improvement parameters after tunneling are measured, the modifier parameters are adjusted, and the modifier parameters during formal tunneling are determined; 4, tunneling parameters are determined, wherein the modifier parameters are the same, and a
shield tunneling machine carries out trial tunneling on the test section under different tunneling parameters; and 5, the tunnel parameters, the soil outlet amount and the
muck improvementparameters after tunneling are measured, the tunneling parameters are adjusted, and formal tunneling parameters of the shield tunneling
machine are determined. According to the method, the problems that in the prior art, due to the fact that the modifier parameters and the tunneling parameters are not reasonably set, the muck improvement effect is poor, the tunneling speed is reduced, and the abrasion of the shield tunneling machine is increased are solved.