The invention provides a mine drainage
system design method integrating calculation,
model selection and
verification. The mine drainage
system design method comprises the following steps that a drainage
system design program is opened through double clicks, relevant basic parameters of a mine drainage system are input into a system, a'calculation and
model selection basis' button is clicked, and relevant parameters of a water pump
model selection basis are obtained through calculation; selecting a water pump and a motor according to relevant parameters of a water pump
type selection basis, inputting the relevant parameters, and clicking a'drainage capacity checking calculation 'button to check whether the drainage capacity of the selected water pump and the motor meets relevant regulations of safety regulations or not; inputting the
pipe diameter and the wall thickness of the primarily selected drainage
pipe, clicking a'pipeline parameter calculation 'button, and checking whether the selected drainage
pipe is reasonable or not. According to the mine drainage system design method integrating calculation, model selection and
verification, the model selection efficiency is improved, the professional knowledge
reserve capacity required by calculation and
verification of the mine drainage system by related personnel is reduced, and a new thought is provided for design, model selection and calculation of related industry personnel.