Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

27132 results about "Tower" patented technology

A tower is a tall structure, taller than it is wide, often by a significant margin. Towers are distinguished from masts by their lack of guy-wires and are therefore, along with tall buildings, self-supporting structures.

Power distribution network maintenance strategy generation method based on heuristic algorithm

The invention discloses a power distribution network maintenance strategy generation method based on a heuristic algorithm, and the method comprises the steps: evaluating the aging degree of a coating and judging whether the coating needs to be replaced or the glaze layer needs to be repaired according to the multi-dimensional health state indexes such as the aging degree of the surface of an insulator in a power distribution network, the crystal structure of the glaze layer, the geometric dimension deviation, the surface crack and the temperature distribution; by analyzing the geographic position of a tower where the insulator is located, the surrounding vegetation coverage condition and the electromagnetic interference level, an overhaul area is divided, and an optimal overhaul path is determined; in the ground inspection process, acquiring three-dimensional point cloud data of the power transmission line, and judging whether an insulator is damaged or polluted; measuring the width and length of the surface crack, predicting the crack propagation trend and residual life, formulating a maintenance time window and scheduling maintenance resources; after the insulator is replaced or repaired, the temperature distribution of the insulator is detected to judge the installation quality; and finally, through multi-dimensional data analysis, generating an optimal maintenance decision sequence of the full life cycle of the insulator.
Owner:MAOMING POWER SUPPLY BUREAU GUANGDONG POWER GRID CORP

Method and system for detecting state of wind power bolt

The invention discloses a wind power bolt state detection method and system, and belongs to the technical field of mechanical structure testing and health monitoring, and the method comprises the steps: obtaining the real-time strain data of each monitoring point; acquiring operation condition data of the unit in real time; dynamically generating a finite element model of the tower drum structure according to the operation condition data; the finite element model and the real-time strain data are combined to generate a stress distribution map of the whole tower cylinder bolts; inputting the stress distribution atlas into a preset fatigue damage model, calculating a bolt life attenuation rate and positioning an external load abnormal source; and when it is detected that the life attenuation rate exceeds a preset threshold value, generating a grading early warning signal and outputting a maintenance strategy according to a positioning result. According to the method, a wireless strain sensor network, dynamic finite element model correction and multi-dimensional fatigue damage analysis technology are adopted, a whole tower barrel stress distribution map is generated in real time, external working condition data are associated, the bolt service life attenuation rate can be accurately evaluated, a load abnormal source can be positioned, and a graded maintenance strategy can be output.
Owner:HUANENG LIAONING CLEAN ENERGY CO LTD

Intelligent sensing array early warning system for full-life damage of mixed tower structure

The invention discloses a mixed tower structure full-life damage intelligent sensing array early warning system, which relates to the field of mixed tower structure detection and comprises a multi-modal data collection module, an array topology optimization module, a self-adaptive signal processing module, a digital twin life prediction module, a grading early warning module and a visualization system. The multi-modal data collection module comprises a multi-modal sensor array, a self-powered module and a wireless transmission module. According to the invention, a full-scale sensing network is constructed, full-dimension damage perception from distributed monitoring to sudden damage capture and structural modal analysis is realized, wavelet transform and blind source separation are combined to eliminate environmental noise interference, a damage characteristic ultrasonic attenuation coefficient, an acoustic emission energy spectrum peak value, optical fiber strain gradient anomaly and vibration modal frequency deviation are extracted, and the detection accuracy is improved. And classification and positioning of damage types and intelligent diagnosis of severity levels are realized through a convolutional neural network and long and short memory neural network hybrid model, and a closed-loop processing flow from data acquisition to feature analysis is formed.
Owner:HENAN CHENGJIAN INSPECTION & TESTING TECH CO LTD

Wind turbine generator hoisting construction tower drum operation system and construction method thereof

The invention discloses a wind turbine generator hoisting construction tower drum operation system and a construction method thereof, and relates to the technical field of intelligent control. The problems that in the prior art, a static tension balance mechanism cannot restrain bending moment abrupt change, steel-concrete interface stress concentration causes microcrack propagation, the wave dynamic load compensation capacity is insufficient, and dynamic rigidity attenuation early warning is lacked are solved. Comprising a dynamic load prediction module, a multi-mode vibration suppression module, an offset compensation module and a digital twinborn decision module, a hoisting load is solved in real time through a multi-physics field coupling model and an improved time sequence deep learning algorithm, and interface crack propagation is suppressed in combination with traveling wave offset control and sweep frequency vibration. An improved Morison equation is adopted to drive a two-stage hydraulic servo to compensate a wave dynamic load, and a digital twin closed-loop correction mechanism is constructed based on a 5G URLLC protocol; the tower drum hoisting precision, the structural safety and the operation reliability under the complex working condition are remarkably improved.
Owner:ZHENGZHOU FENGHUO ELECTRIC POWER TECH CO LTD

Power distribution network tower abnormity monitoring method and system

The invention discloses a power distribution network tower abnormity monitoring method and system, and relates to the technical field of tower monitoring, and the method comprises the steps: arranging a multi-mode sensor on a power distribution network tower, and collecting the state data of the tower; constructing a power distribution network tower digital twinborn model, inputting tower state data, and predicting the future state of the tower; performing regular inspection on the tower by using an unmanned aerial vehicle, and collecting dynamic three-dimensional data of the tower; and the tower state data, the tower future state prediction result and the tower dynamic three-dimensional data are fused, and tower abnormity is monitored and early warning is performed. The invention also discloses a method. Through the application of the multi-source data fusion technology, the accuracy and reliability of anomaly detection are effectively improved, professional guidance is provided for maintenance personnel based on a grading early warning mechanism of a comprehensive anomaly index, the fault processing efficiency is improved, the accuracy and timeliness of tower anomaly monitoring are remarkably improved, and the safety and reliability of the tower are improved. And predictive maintenance and intelligent management are also realized, and the safety and reliability of the power distribution network are greatly enhanced.
Owner:GUIZHOU POWER GRID CO LTD

A cooling triangle unit equipped with a flow equalizing device with a central jet gap

The present invention discloses a cooling triangle unit equipped with a flow equalizing device with a central jet gap, including a cooling triangle unit and a flow equalizing device with a central jet gap, the cooling triangle unit including a left cooling column, a right cooling column and an air inlet louver, the flow equalizing device with a central jet gap including an outer flow equalizing plate, an inner flow equalizing plate and a central jet gap, the outer flow equalizing plate extending inwardly from the air inlet louver along the vertical central symmetry plane of the cooling triangle by a certain distance Lw, the inner flow equalizing plate extending inwardly from the distance Lj from the inner end of the outer flow equalizing plate along the vertical central symmetry plane of the cooling triangle by a certain distance Ln, and the inner end of the outer flow equalizing plate and the outer end of the inner flow equalizing plate forming a jet gap. Based on the central jet gap, the present invention, on the basis of evenly dividing the cooling triangle inlet air, eliminates the vortex induced by the tower air on the leeward side of the flow equalizing device through the jet formed by the central jet gap, thereby improving the cooling columns on the left and right sides of the cooling triangle unit and its overall cooling performance.
Owner:济南蓝辰能源技术有限公司

Low-carbonic acid tower for producing tertiary carbonic acid

The present invention relates to the technical field of waste gas treatment, and discloses a low carbonic acid tower for tertiary carbonic acid production, the low carbonic acid tower comprises a tower body, the inner wall of the tower body is provided with a plurality of groups of support frames, the support frames are internally provided with filler layers, the lower parts of the support frames are provided with distribution plates, and trickling ports are uniformly distributed at the bottom of a spray pipe, so that the tertiary carbonic acid production efficiency is improved, and the tertiary carbonic acid production efficiency is improved. According to the waste gas absorption tower, through the arrangement of the filter layer, dripped absorption liquid can better cover the interior of the tower body, so that waste gas and the absorption liquid can be better in countercurrent contact, when the absorption liquid flows through the arranged filler layer, the contact area of the absorption liquid and the waste gas can be increased, and an adsorption sieve in the filler layer can also adsorb some harmful substances in the waste gas; and the distribution plate is arranged below the spraying pipe, so that the absorption liquid can be secondarily distributed and is uniformly distributed in the tower body again, and the condition of non-uniform distribution of liquid drops is avoided.
Owner:ANHUI YIXING NEW MATERIAL TECHNOLOGY CO LTD

Tower footing geological landslide monitoring and early warning system and method

The invention relates to the technical field of geological landslide monitoring, in particular to a tower footing geological landslide monitoring and early warning system and method. The method comprises the following steps: arranging an inclination angle sensor, a Beidou-GNSS module, a soil moisture content probe and a micro-seismic accelerometer on a tower footing and the periphery of the tower footing, and collecting the inclination amount, three-dimensional displacement, soil moisture content and vibration response information of the tower footing to form a monitoring original data set; timestamp unification, WGS-84 projection coordinate system conversion and multi-frequency vibration elimination are carried out on the monitored original data set, and an air-ground integrated displacement profile is constructed; the whole process realizes high integration and automation in the aspects of data acquisition, processing, fusion and transmission, so that the timeliness, accuracy and data integrity of landslide risk monitoring are ensured, and scientific decision support is provided for disaster prevention and reduction.
Owner:XUANTIE WIND ENERGY (SHENZHEN) TECH CO LTD

Adsorption tower control apparatus, gas separation apparatus, control method of plurality of adsorption towers and computer program

To provide a technique that can suppress lowering of a rate of collection of adsorbed gas, even under a situation where quantities and densities of mixed gas flowing into an adsorption tower vary.SOLUTION: An adsorption tower control apparatus, which collects specific adsorbed gas using a plurality of adsorption towers, is provided with: a control part that causes an adsorption / desorption step, in which an adsorption step is executed in an adsorption-step tower and at the same time a desorption step is executed in a desorption-step tower, to be repeatedly executed in a plurality of adsorption towers while being transferred; an information obtaining part that obtains information on a property of mixed gas and an operational condition for the adsorption-step tower; and a desorption condition determining part that determines a desorption condition in the desorption-step tower from the information on the property of mixed gas and the operation condition. The control part causes the desorption step to be executed under the desorption condition determined by the desorption condition determining part, and when integrated quantity of adsorbed gas in the adsorption-step tower reaches a predetermined integrated quantity threshold, causes the adsorption-step tower and the desorption-step tower to transfer.SELECTED DRAWING: Figure 1
Owner:KK TOYOTA CHUO KENKYUSHO +4

Improved YOLOv8 tower foundation target detection method and device

The invention discloses an improved YOLOv8 tower footing target detection method and device, and belongs to the technical field of neural networks. A deformable attention mechanism DAtention is added in a backbone network of YOLOv8, so that a model concentratedly pays attention to the most critical area in a current task, the feature extraction capability of a tower footing is improved, and the expression and recognition capability of the model is improved; an original coordinate loss function CIoU is replaced by ShapeIoU, and the difference between the prediction result of the target detection model and the real situation is more accurately measured, so that the training process of the model is helped to be optimized; the method comprises the following steps: improving Head by using occlusion perception attention in YOLO-Face V2, and on the premise of ensuring the detection precision, carrying out lightweight processing on a model, so that the model effectively processes an occlusion scene. The improved algorithm has higher detection precision and higher detection speed for tower footing target detection.
Owner:SHAANXI NORMAL UNIV

Method for continuously and efficiently adsorbing and separating hydrogen isotopes

The invention discloses a method for continuously and efficiently adsorbing and separating hydrogen isotopes. The hydrogen isotopes are separated by adopting a multi-tower variable-temperature variable-pressure device operated in a simulated moving bed operation mode. When the device runs, each adsorption tower needs to sequentially execute the following steps: 1, adsorption; 2, replacement; 3, heating; 4, vacuumizing and desorbing; 5, carrying out vacuum purging; 6, pressurizing and cooling; the operation mode of the simulated moving bed is that an adsorption tower is frequently, sequentially and synchronously moved along the gas flowing direction in the tower through all gas input and output ports, so that an adsorbent phase and a gas flowing phase in the tower form countercurrent flow, and the hydrogen isotope adsorption separation efficiency is enhanced. The invention relates to a technological process of cyclic adsorption, replacement, heating, vacuum desorption, pressurization and cooling, continuous and efficient hydrogen and isotope adsorption separation is realized, multi-tower serial adsorption and replacement are adopted in the process, and separation of hydrogen isotopes (such as H2 / D2) is enhanced; and the desorption efficiency of heavy components is improved by adopting a heating and vacuumizing depressurization coupling mode.
Owner:SHANGHAI MORISEAL NEW MATERIAL TECHNOLOGY CO LTD

Magnetic fluid sealing device based on labyrinth tower shape and sealing performance test bench thereof

The invention belongs to the technical field of magnetofluid sealing in mechanical engineering, and particularly relates to a magnetofluid sealing device based on a labyrinth tower shape, the magnetofluid sealing device is applied to a main shaft, the magnetofluid sealing device comprises a shell assembly and a magnetofluid sealing assembly, and the shell assembly comprises a first sealing shell and an end cover; the magnetic fluid sealing assembly comprises a main shaft sleeve, a pole shoe set and a permanent magnet, a labyrinth tower-shaped sealing structure is formed between the pole shoe set and the main shaft, and the good sealing effect can still be achieved under the working conditions of large shaft diameter, high pressure and high speed; in addition, the invention further provides a sealing performance test bench for the magnetofluid sealing device based on the labyrinth tower shape, on the basis that the main shaft driving assembly is used for providing rotating speed and torque for the main shaft and the pressurizing assembly is used for providing constant pressure for the sealing device, the sealing performance of the magnetofluid sealing device is tested in cooperation with the detection assembly under the working conditions of adjusting different rotating speeds, different pressures and the like. The sealing performance of the magnetofluid sealing device is tested in real time, and the method has important guiding significance on design and optimization of a sealing gap structure.
Owner:TAIYUAN UNIVERSITY OF SCIENCE AND TECHNOLOGY

Real-time monitoring method and system for perpendicularity of mixed-tower wind power tower

The invention relates to the technical field of mixed tower wind power tower monitoring, and discloses a real-time monitoring method and system for the perpendicularity of a mixed tower wind power tower. The system comprises a data sensing layer, a communication control layer and a perpendicularity analysis layer, wherein the data sensing layer realizes multi-point synchronous measurement and dynamic calibration of tower deformation through a displacement sensor array, a dipmeter and the like; the communication control layer completes multi-source data time synchronization, format standardization and fusion transmission through edge calculation, protocol conversion and space-time registration technologies; the perpendicularity analysis layer combines design parameters and real-time data to construct a holographic tower space attitude model, and deformation prediction, benchmark correction and abnormity warning are achieved through a dynamic weighting algorithm. The method comprises the steps of data acquisition and calibration, processing and transmission, model construction analysis and result output. The method achieves the real-time precise monitoring of the perpendicularity of the tower, improves the operation safety, and is suitable for the state monitoring of the mixed-tower wind power tower.
Owner:POWERCHINA CHONGQING ENG CO LTD

Method and system for detecting absolute stress of concrete bridge

The invention relates to the technical field of stress detection, in particular to an absolute stress detection method and system for a concrete bridge, and the method comprises the following steps: obtaining stress data of a bridge girder, a support, a box girder and a main tower, collecting wind speed and wind direction sensor data, calculating a wind load gradient value, and extracting wind load primary and secondary influence regions and a transmission buffer region. And generating a wind load area stress data set. According to the method, through environmental factors and stress data, the influence of wind load on structure stress is identified, data comprehensiveness is ensured, through wind load gradient change rate calculation and stress sudden change area extraction, the structure weak point identification capability is improved, the stress fluctuation trend is quantified through time sequence analysis, and the cumulative change rate is deduced, so that fatigue damage prediction is more accurate; abnormal point identification is combined with deviation ratio analysis, measurement data is corrected, analysis reliability is improved, fatigue damage information is extracted based on stress attenuation features, local fatigue evaluation is optimized, a damaged area is accurately locked, and the accuracy of structural health monitoring is improved.
Owner:SICHUAN ROAD & BRIDGE EAST CHINA CONSTRUCTION CO LTD +1

Methods for loading and extracting product in elevated tower

ActiveUS12246932B2Source materialTower
Assemblies, apparatuses, and methods to extract or convey a material from a source of the material may include a vacuum generation and sound attenuation assembly and a material receiver to enhance conveyance the material from the source of the material. The vacuum generation and sound attenuation assembly may include a vacuum source positioned to cause a vacuum flow between the source of the material, the material receiver, and the vacuum generation and sound attenuation assembly. The vacuum generation and sound attenuation assembly may further include a sound attenuation chamber positioned to receive at least a portion of the vacuum flow from, and attenuate sound generated by, the vacuum source. The material receiver may be positioned an elevated location relative to a source of the material and be capable of staging and metering the conveyance of material when moving material at the top of a structure, such as a refinery tower.
Owner:IND VACUUM TRANSFER SERVICES USA LLC

Method and device for determining aerodynamic damping of bridge tower based on unscented Kalman filter

The invention relates to the technical field of wind resistance design of bridge structures, discloses a bridge tower aerodynamic damping determination method and device based on unscented Kalman filtering, and aims to solve the technical problem that existing aerodynamic damping identification is not accurate enough. The scheme mainly comprises the following steps: determining an initial nonlinear aerodynamic damping model comprising a plurality of unknown model parameters of the bridge tower, and constructing a state equation comprising the model parameters; obtaining a vortex-induced vibration response time history of the bridge tower model by using a wind tunnel test, and constructing an observation equation; inputting the state equation and the observation equation into an unscented Kalman filter, and determining values of model parameters by using the unscented Kalman filter; and substituting the values of the model parameters into the initial nonlinear aerodynamic damping model to obtain a nonlinear aerodynamic damping model, and determining aerodynamic damping by using the nonlinear aerodynamic damping model. Accurate identification of aerodynamic damping is achieved, the requirement for the actual measurement response time history is lowered, and the method is particularly suitable for accurately evaluating the wind-induced response of the structure.
Owner:CHINA HYDROELECTRIC ENGINEERING CONSULTING GROUP CHENGDU RESEARCH HYDROELECTRIC INVESTIGATION DESIGN AND INSTITUTE

Concrete cable bent tower construction modeling method based on BIM technology

The invention discloses a concrete cable bent tower construction modeling method based on a BIM technology, and relates to the technical field of bridge construction, a BIM model is adopted to extract three-dimensional coordinates of each node of a stiff skeleton and then carry out positioning, after the stiff skeleton is assembled, if deviation exceeds a limit, a correction instruction is automatically generated, template data is collected in real time, and construction parameters of a next section are rehearsed based on the BIM model. Dynamically adjusting the template, rehearsing the spatial pose of the cable conduit, calculating the thermal deformation compensation amount, then correcting the installation error in real time, simulating the concrete pouring process, dynamically optimizing the pouring strategy, generating a completion model after each section is constructed, automatically comparing and analyzing the completion model and the BIM model, and generating a BIM model optimization strategy. According to the method, local adjustment is conducted on position conflicts of various embedded parts, cable conduits, pouring joints and the like by building the BIM model, segment division capable of directly guiding site construction is formed, the construction control level is effectively improved, rework is reduced, and the construction efficiency is improved.
Owner:HENAN TONGSHUO JIDA ENGINEERING CONSULTING CO LTD

Receiver, assemblies, and methods for loading and extracting product in elevated tower

Assemblies, apparatuses, and methods to extract or convey a material from a source of the material may include a vacuum generation and sound attenuation assembly and a material receiver to enhance conveyance the material from the source of the material. The vacuum generation and sound attenuation assembly may include a vacuum source positioned to cause a vacuum flow between the source of the material, the material receiver, and the vacuum generation and sound attenuation assembly. The vacuum generation and sound attenuation assembly may further include a sound attenuation chamber positioned to receive at least a portion of the vacuum flow from, and attenuate sound generated by, the vacuum source. The material receiver may be positioned an elevated location relative to a source of the material and be capable of staging and metering the conveyance of material when moving material at the top of a structure, such as a refinery tower.
Owner:IND VACUUM TRANSFER SERVICES USA LLC

Bolt perforating installation method for angle steel tower

The invention relates to the technical field of bolt mounting equipment, in particular to an angle steel tower bolt perforation mounting method. By means of autonomous navigation of the installation robot and flexible operation of the mechanical arm, rapid positioning and taking-out of bolts and nuts are achieved, and the risk of manual climbing and operation is reduced. Accurate insertion and preliminary positioning of the bolt are ensured through accurate control of the mechanical arm, then the fastening effect is enhanced by combining impact tightening with the intermittent hammering technology, the fit clearance between the angle steel is effectively eliminated, and the bolt is prevented from loosening. The whole process is highly automatic, personal errors are reduced, and the mounting quality and the working safety are improved.
Owner:STATE GRID ANHUI ELECTRIC POWER CO LTD

Wind power mixed tower damage prediction method and system based on digital twinning

The invention provides a wind power mixed tower damage prediction method and system based on digital twinning. The method comprises the steps of obtaining multi-source data of a wind power mixed tower; wherein the multi-source data comprises structure response data, environment load data and historical operation and maintenance data; based on a building information model and finite element model fusion technology, constructing a digital twinborn model of the wind power mixing tower; inputting the multi-source data into a digital twinborn model to realize real-time mapping of the wind power mixed tower and the digital twinborn model, and obtaining real-time structure state data of the wind power mixed tower through the digital twinborn model; inputting the multi-source data and the real-time structure state data into a pre-trained LSTM-GRU hybrid neural network model, and predicting a damage evolution trend of the wind power hybrid tower in combination with an attention mechanism; and on the basis of the damage evolution trend, a maintenance scheme of the wind power mixed tower is generated by using a multi-target particle swarm algorithm, so that balanced optimization of maintenance cost, power generation loss and risk level is realized, and the operation and maintenance efficiency and safety of the wind power mixed tower are integrally improved.
Owner:华能陕西子长发电有限公司 +1

Tower inclination collapse early warning system and method

The invention belongs to the field of early warning and monitoring of power equipment, and particularly discloses an early warning system and method for inclination and collapse of a tower. The system comprises a sensor module, a data acquisition and preprocessing module, an edge calculation module, a data transmission and synchronization module, a central processing and intelligent analysis module, a visualization and early warning module, a power management module, a model training and optimization module and a system management and maintenance module. The system is high in data acquisition precision, strong in system robustness and high in early warning efficiency, can efficiently and accurately carry out real-time monitoring and inclination collapse early warning on the state of the tower of the transformer substation, and remarkably improves the operation safety and management efficiency of the transformer substation.
Owner:STATE GRID HENAN ELECTRIC POWER CO MIANCHI COUNTY POWER SUPPLY CO

Multi-element historic building maintenance and restoration method based on three-dimensional laser scanning

The invention discloses a multi-element historic building maintenance and restoration method based on three-dimensional laser scanning, and relates to the technical field of computer processing, and the method comprises the following steps: S01, obtaining the three-dimensional point cloud data of a historic building foundation through a ground laser scanner, the basic three-dimensional point cloud data comprises geometric information of a building facade, a ground structure and a near-ground decoration component; s02, an unmanned aerial vehicle carries a multi-line laser scanning device to scan the top and the high-altitude structure of the building, supplementary point cloud data is generated, and the millimeter-level precision three-dimensional coordinates of the pitched roof, the tower eave and the cornice bracket are covered with the supplementary point cloud data; and S03, synchronously acquiring surface texture data of the historic building by adopting multispectral imaging equipment. According to the method, the millimeter-level precision of three-dimensional reconstruction of the historic building is realized through multi-source data fusion and a hierarchical optimization algorithm, and the maintenance decision efficiency is improved by combining automatic disease recognition and a multi-modal analysis technology.
Owner:ZHEJIANG COLLEGE OF CONSTR

Automatic three-dimensional reconstruction method and system based on power transmission corridor point cloud

The invention discloses an automatic three-dimensional reconstruction method and system based on power transmission corridor point cloud. The method comprises the following steps: acquiring data and exporting point cloud data; noise points, outliers and ground points are removed from the acquired point cloud data of the power transmission corridor, and down-sampling is performed on the point cloud with a large data volume; performing clustering segmentation on the preprocessed point cloud of the power transmission corridor, positioning the position of a tower, determining a point cloud range of a power line, and removing point clouds of other objects on the ground; aiming at the structural characteristics of a power line and an insulator in the power transmission line, extracting point clouds of the power line, the insulator and a tower by adopting a geometric constraint principal component analysis (PCA) algorithm; performing automatic geometric model reconstruction on the tower, insulator and power line point clouds according to different reconstruction rules to generate each module grid model; and transforming the grid model of each module, restoring the grid model to the original position of the point cloud, and generating a power transmission line digital twin model conforming to the real size. According to the method, automatic segmentation, classification and real-time reconstruction can be accurately carried out on the point cloud of the power transmission corridor.
Owner:NARI INFORMATION & COMM TECH

Splicing construction method for high-altitude large-span steel structure corridor

The invention provides a high-altitude large-span steel structure corridor assembly construction method, which belongs to the technical field of high-altitude large-span steel structure corridor construction, and comprises the following steps: designing a steel structure conversion jig frame, calculating bearing capacity, and determining component specifications and connection modes; the conversion jig frame is installed on the roof of the skirt house and comprises installation and connection of stand columns, trusses and steel beams; according to design requirements, the arching value of the steel corridor truss is calculated, and the steel corridor truss is machined and manufactured in a factory; a profile steel support is installed on the conversion jig frame, and the truss component is hoisted and welded; installing a temporary support, and determining the specification and position of support profile steel; a bracket for lifting and a hydraulic lifter are installed on the tower, and a lifting point is arranged on a lower chord of the corridor; a monitoring system is installed, a hydraulic synchronous lifting system is adopted to lift the whole steel corridor to the designed elevation, deformation and stress states are monitored in real time, and lifting safety is guaranteed; and finally, reliable connection with the tower structure is conducted, installation is completed by dismantling the temporary supports, and the whole process is high in efficiency and safety.
Owner:CHINA CONSTR EIGHTH BUREAU DEV & CONSTR CO LTD +1

Tower fan (S type S4-S5-S6)

ActiveCN309045010STowerMechanical engineering
1. The name of the product of this design: Tower fan (S type S4‑S5‑S6). 2. Purpose of this design product: used to adjust indoor temperature. 3. The design key point of this appearance design product lies in the combination of shape and pattern. 4. The picture or photo that best illustrates the key points of the design: 3D drawing of Design 1. 5. The bottom surface of this design product is a part that is not easily visible or cannot be seen during use, so the top views of designs 1, 2, and 3 are omitted. 6. Designate Design 1 as the base design.
Owner:ZHONGSHAN WEIHONG ELECTRICAL TECH CO LTD

Safety monitoring, early warning and evaluation method for concrete tower drum of wind turbine generator

The invention discloses a wind turbine generator concrete tower safety monitoring, early warning and evaluation method, which belongs to the field of wind power, and comprises the following steps: analyzing different stress stages of a concrete tower based on a stress mechanism of the concrete tower; determining the main wind direction and the orientation of the inhaul cable with the lowest frequency as the monitoring orientation; arranging a transverse acceleration sensor and a strain gauge in a monitoring direction; determining an early warning value of the monitored concrete tower drum; acceleration and strain signals are collected, first-order frequency of the inhaul cable and actual strain of concrete are obtained through calculation and compared with an early warning value, and safety monitoring and early warning of the concrete tower drum of the wind turbine generator are achieved. According to the stress characteristics of the wind turbine generator concrete tower tube structure, the inhaul cable frequency and the concrete strain are combined, accurate early warning and evaluation of the inhaul cable force loss and the concrete limit strain are achieved, and the safety of the concrete tower tube structure is effectively guaranteed.
Owner:HUNAN UNIV OF SCI & TECH

Pole climbing robot for wind power tower pole

The invention discloses a pole climbing robot for a wind power tower pole, which is characterized in that the robot mainly comprises a robot body, 4-8 pole climbing mechanisms, a snake-shaped swing arm and a movable studio, wherein the snake-shaped swing arm and the movable studio are mounted on one side of the robot body; the robot body is an annular body formed by combining two semicircular cambered bodies or three equal cambered bodies; the diameter of an internal ring of the circular body is matched with the diameter of the wind power tower pole; the pole climbing mechanisms mainly comprise upper foot wheels, lower foot wheels, connecting arms, driving gears, thrust screw rods, nut gears and supporting seats; the upper foot wheels are connected with the lower foot wheels by the connecting arms through wheel shafts; the connecting arms are connected with the thrust screw rods by connecting pin shafts on the connecting arms, and form movable hinges; the 4-8 pole climbing mechanisms are distributed in the circular robot body uniformly; the snake-shaped swing arm consists of three swing arm parts, namely a large arm, a middle arm and a small arm; and the movable studio comprises two paralleled linear guide rails, a walk driving device and an operation room.
Owner:HEBEI UNIV OF TECH

Cross-physics field model test device and method for floating fan

The invention discloses a cross-physical field model test device and test method for a floating fan, and relates to the technical field of offshore wind power engineering, the cross-physical field model test device comprises a pool test subsystem, a wind tunnel test subsystem and a real-time interaction system, the pool test subsystem comprises an aerodynamic load reproducing device and a tower-floating body-mooring physical model; the wind tunnel test subsystem comprises a floating body motion simulator and a wind wheel-tower drum physical model; the real-time interaction system can control the aerodynamic load reproducing device and the floating body motion simulator to move. According to the method, multifunctional wind tunnel and ocean engineering pool test conditions are utilized at the same time, the motion characteristics of the floating body and the aerodynamic characteristics of the fan are reproduced in real time, the floating fan system is divided into the two test subsystems, the problem that the aerodynamic similarity criterion and the hydrodynamic similarity criterion cannot be matched at the same time in a reduced scale model test is solved, and the test efficiency is improved. And the precision and the reliability of the integrated model test of the floating fan are improved.
Owner:SHANGHAI JIAOTONG UNIV

Angle steel tower foot welding machining platform

The utility model provides an angle steel tower foot welding processing platform, and relates to the technical field of welding processing platforms, the angle steel tower foot welding processing platform comprises a workbench, the top of the workbench is fixedly connected with a fixing assembly, and the top of the fixing assembly is fixedly connected with a plurality of limiting assemblies; the fixing assembly comprises a fixing frame, a plurality of mounting grooves are formed in the top of the fixing frame, and threaded rods are rotationally connected to the inner surfaces of the mounting grooves. According to the utility model, through the cooperative use of the first handle, the threaded rod, the guide rod, the moving block, the clamping block and the mounting groove, not only can the tower foot bottom plate be fixed, but also the limiting assembly can be driven to move synchronously, and then through the cooperative use of the second handle, the bidirectional screw rod, the clamping plate, the auxiliary rod and the limiting frame, the tower foot bottom plate can be fixed. And the cross-shaped tower frame on the tower foot bottom plate is clamped and fixed, so that the tower foot bottom plate and the cross-shaped tower plate are conveniently welded after being fixed, and the welding efficiency of the tower foot is improved.
Owner:JIANGSU QITIAN TOWER MFG CO LTD

Power transmission line mountain fire disaster risk assessment method and system based on space-time event driving

The invention provides a power transmission line mountain fire disaster risk assessment method and system based on space-time event driving, and the method comprises the steps: obtaining mountain fire monitoring data of a to-be-assessed region, and generating a space-time event according to the mountain fire monitoring data; according to an event association rule, the space-time event is associated with a power transmission line tower through a directional edge, and then a power transmission line mountain fire disaster hidden danger map is constructed; performing similarity matching on the time-space events generated in real time and the time-space events in the power transmission line mountain fire disaster hidden danger map, and searching the corresponding time-space events in the power transmission line mountain fire disaster hidden danger map by adopting a map traversal algorithm; and for the searched towers influenced by the space-time events, quantitatively calculating the risk score of each tower based on the data values of the real-time space-time events, and dividing the risk grades according to the risk scores. According to the method, the association precision of power transmission line risk assessment and the precision and efficiency of power transmission line forest fire prevention and control can be improved.
Owner:ZHUHAI POWER SUPPLY BUREAU GUANGDONG POWER GIRD CO