Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

2685 results about "Resource utilization" patented technology

Resource utilization is the amount of a good or service consumed or the pattern of use of a good or service within a specified time.

Intelligent scheduling method for comprehensive virtual power plant

The invention discloses an intelligent scheduling method for a comprehensive virtual power plant, and relates to the technical field of power plant intelligent scheduling, and the method comprises the steps: carrying out the redundancy elimination filtering and unified time sequence calibration of multi-node sensing data of a cold and hot energy station, energy storage equipment and the like through the deployment of an edge side high-concurrency collection module, generating a high-quality time sequence fusion sequence, and screening schedulable resources; on-line model correction is realized through an error dynamic evaluation mechanism, a multi-stage scheduling strategy is generated by adopting an improved particle swarm algorithm aiming at the targets of economy, reliability and environmental protection, and an optimal instruction is output in combination with an equipment constraint condition. Through priority control and real-time monitoring index evaluation deviation, a rolling correction and standby strategy is triggered, equipment-level fault risk quantification and self-healing control are realized, abnormity is rapidly isolated, and redundant resources are started. Through data-prediction-scheduling-execution closed-loop cooperation, the resource utilization rate, the scheduling precision and the system fault-tolerant capability are significantly improved, and the scheduling capability of source heterogeneous resources is enhanced.
Owner:JIANGSU RUIZHI POLYMER TECH CO LTD

Distributed component dynamic resource allocation method based on multi-objective optimization

The invention discloses a distributed component dynamic resource allocation method based on multi-objective optimization, which is characterized in that a PPO algorithm is introduced into a distributed system, dynamic adjustment is carried out aiming at a plurality of optimization objectives to optimize the overall configuration of resources, and the system firstly collects the real-time state, the task demand and the resource use condition of a distributed component; and then training an intelligent agent by using a PPO algorithm to gradually optimize a resource allocation strategy according to environment feedback, and finally realizing long-term optimization of a resource scheduling process by continuously interacting with the environment and continuously adjusting the strategy through the PPO algorithm. According to the method, the PPO algorithm in reinforcement learning is combined, efficient resource allocation of the distributed components in the complex dynamic environment is achieved, different from an existing rule driving or static optimization method, the allocation strategy can be adjusted in a self-adaptive mode according to task requirements, resource use conditions and system loads which change in real time, the resource utilization rate is increased, and the resource utilization rate is increased. And the system burden is reduced, and efficient operation of the system under variable conditions is ensured.
Owner:CHENGDU HAIQING TECH CO LTD

Computing power scheduling method and system based on dynamic load prediction and resource priority ranking

The invention discloses a computing power scheduling method and system based on dynamic load prediction and resource priority ranking. The computing power scheduling method comprises the following steps: collecting historical load data, task submission data and resource state data of each node in a computing power cluster; on the basis of the preprocessed multi-dimensional load feature data set, constructing an improved hybrid prediction model, optimizing model parameters through training, and predicting the load change trend of each computing power node in a future preset time period by using the trained model to obtain a node load prediction result; extracting a service level protocol parameter, a resource demand type and historical execution efficiency data of a to-be-scheduled task, and establishing a multi-dimensional resource priority evaluation index system; according to the computing power scheduling method, the problems of low resource utilization rate and high task response delay caused by low load prediction precision and mismatching of resource allocation and task priority in a traditional computing power scheduling method are solved, and the overall operation efficiency and service quality of a computing power cluster are improved.
Owner:SHAOGUAN DATA IND RESEARCH INSTITUTE

Multi-agent non-cooperative game driven high-concurrency task reasoning method and system

The invention discloses a multi-agent non-cooperative game driven high-concurrency task reasoning method and system, and the method comprises the steps: decomposing a heterogeneous task into standardized task units, and carrying out the quantitative modeling of the calculation resource demands of the task; constructing a task auction mechanism of the multi-agent non-cooperative game model, performing task allocation by adopting an anti-strategic auction rule and a fragmentation asynchronous protocol, and constraining resource declaration behaviors of the agents through a credit pledge mechanism; the real-time resource utilization rate of the system is monitored, the task priority is dynamically adjusted in combination with the task preemption historical state, a resource soft preemption strategy is triggered, and a compensation queue is established; a self-adaptive model splitting strategy is adopted to distribute reasoning tasks to end side equipment and edge computing nodes, cooperative execution is achieved through data compression and transmission, and task rescheduling is conducted according to feedback of an execution result; according to the method, the task execution efficiency, the resource utilization rate and the system stability can be remarkably improved in a high-concurrency scene.
Owner:PANDA ELECTRONICS

Production process state monitoring scheduling optimization method based on real-time data acquisition

The invention discloses a production process state monitoring scheduling optimization method based on real-time data acquisition, relates to the technical field of manufacturing process scheduling, and is used for solving the problem of insufficient real-time performance and stability of process scheduling. According to the method, a process monitoring mechanism based on real-time acquisition and closed-loop scheduling is constructed, a time sequence structured data frame is formed under a unified time reference, operation stability and quality offset characteristics are extracted, a data credible label and a current process state factor vector are generated, an optimized scheduling model is input, and task conflicts and resource bottlenecks are identified according to the data credible label and the current process state factor vector. According to the method, path compression and sequence adjustment are implemented in combination with scheduling priority mapping and a resource path diagram, scheduling deviation vectors are constructed through task response time delay and process blocking in operation, rules and parameters are triggered to be updated online and locally rearranged, and solidification is performed after verification in a prediction window, so that equipment idling and switching fragmentization in the production process are reduced, and the production efficiency is improved. And the real-time performance of the production process, the resource utilization rate and the system stability are improved.
Owner:ANHUI JINSHENG INFORMATION TECHNOLOGY CO LTD

5G network slice dynamic scheduling method and system based on multi-modal space-time perception and event knowledge graph

The invention relates to a 5G network slice dynamic scheduling method and system based on multi-modal space-time perception and an event knowledge graph, and belongs to the technical field of mobile communication network resource management. According to the method, the change of a physical scene is sensed in real time by constructing a dynamically evolved event knowledge graph and designing a double-flow space-time cross network in combination with visual semantic analysis; dynamically adjusting the resource prediction model by adopting an event-scene dual-drive mechanism, dynamically adjusting parameters of the gated recurrent neural network through an elastic adjustment factor, and optimizing a multi-target resource allocation strategy based on a reinforcement learning algorithm; a two-stage resource scheduling mode is adopted, non-preemptive resource allocation of priority guarantee is implemented in an event triggering stage, and an optimization strategy of continuous adjustment is deployed in a steady-state stage. According to the method, the resource utilization efficiency and the service quality in a high-concurrency scene are remarkably improved, the method is compatible with an O-RAN standard interface, and the method is suitable for high-reliability and low-delay communication scenes such as smart cities and industrial internet.
Owner:SOUTHWEST FORESTRY UNIVERSITY

Multi-level storage control method based on access popularity

The invention discloses a multi-level storage control method based on access popularity, and relates to the technical field of information, the method comprises the following steps: building a storage resource monitoring module, and collecting data volume change, read-write frequency and capacity occupation proportion information of each node from a storage system in real time; the method comprises the following steps: collecting original data, carrying out preliminary cleaning and formatting processing on the collected original data to obtain a standardized resource state data set, comparing predicted data with operation parameters of a current storage system, and if a predicted demand exceeds a current capacity limit, automatically generating a capacity expansion scheduling task to obtain a final resource optimization configuration scheme; according to the multi-level storage control method and device based on the access popularity, intelligent monitoring, load balancing and capacity planning of storage resources are achieved, the resource utilization efficiency and expandability of a storage system are improved, and an effective solution is provided for stable operation and performance optimization of a large-scale storage system.
Owner:SICHUAN HENTAI SEMICON CO LTD

Computer system service optimization scheduling method for photoelectric system

The invention discloses a computer system service optimization scheduling method for a photoelectric system, and particularly relates to the technical field of computer service optimization, which comprises the following steps of: sensing and extracting information such as task types and time constraints through task characteristics, and constructing a multi-dimensional resource model such as processing capability and idle degree by combining resource modeling; a weighting mechanism is used for evaluating task priorities and generating a scheduling queue, tasks are dynamically mapped to matched resources, a scheduling strategy is adjusted according to system loads and feedback, model parameters are optimized through service feedback, and efficient, self-adaptive and intelligent optimization of task scheduling of the photoelectric system is achieved; according to the method, a dynamic scheduling mechanism based on task characteristics and resource prediction is realized, and the response speed of the high-optimal task is improved; optimizing the resource utilization rate by adopting resource state modeling and prospective mapping; and reinforcement learning and a feedback closed loop are introduced, a sustainable optimization scheduling system is constructed, and the adaptability and stability of the system in a complex photoelectric task environment are enhanced.
Owner:CHANGZHOU WANTUO OPTOELECTRONICS TECHNOLOGY CO LTD

Intelligent supply chain optimization management method and system based on digital AI analysis

The invention relates to the technical field of data processing, and discloses an intelligent supply chain optimization management method and system based on digital AI analysis. The method comprises the steps of collecting supply chain data to construct a resource library; analyzing a sales mode and K-means + + clustering customer features by using LSTM, and predicting demands; inventory parameters and supplier scores are calculated, and a collaborative data set is formed; commodity association is analyzed through a knowledge graph, and a commodity selection decision is generated; resource allocation is carried out by applying multi-objective optimization, and cross-channel inventory collaboration is realized; and an integral rule and a merchant enabling scheme are constructed based on the transaction data, and a digital asset closed-loop mechanism is formed. According to the intelligent supply chain optimization management method based on AI analysis, global visualization, dynamic scheduling and accurate allocation of inventory resources are realized, the technical problem of cross-channel inventory collaborative allocation is solved, and the operation efficiency and the resource utilization rate of the whole supply chain are remarkably improved.
Owner:SHANGHAI DUOKE SHANGPING NETWORK TECHNOLOGY CO LTD

Optical transmission network hidden danger detection method and device and computer program product

The invention discloses an optical transmission network hidden danger detection method and device and a computer program product, which can realize dynamic adjustment of differentiated bandwidth requirements by acquiring optical network state information in real time, evaluating service priority and establishing an optical channel resource allocation model. And when a topology anomaly is detected, constructing a service quality evaluation model by using a long-short-term memory neural network, and quantitatively analyzing the influence of the anomaly on the service. When a fault occurs, distributed link fault detection and a fault diagnosis engine based on a decision tree are adopted, and fault hidden dangers are quickly positioned and classified. And then, through an elastic recovery mechanism oriented to service sensitivity, the service quality level of a standby optical path is adjusted, and an optical layer topology connection relationship is optimized. According to the method, the resource utilization efficiency, the fault recovery capability and the service quality of the optical network are remarkably improved, and an innovative solution is provided for intelligent optical network management.
Owner:SHENZHEN POWER SUPPLY BUREAU

Building project resource scheduling optimization method based on BIM

The invention relates to the technical field of project management, in particular to a BIM-based building project resource scheduling optimization method, which comprises the following steps: based on the current progress state of a construction task, collecting the consumption of constructors, mechanical equipment and materials, comparing the task plan progress with the real-time progress, screening out construction links with the backward task progress, and establishing a construction project resource scheduling optimization model; and judging a resource type, and establishing a task progress offset. According to the method, the construction progress is accurately monitored, real-time evaluation of resource consumption is achieved, waste and scheduling lag are avoided, the construction path is optimized by means of the BIM model, the key path monitoring precision is improved, progress management and control effectiveness is ensured, key path progress deviation is analyzed, the resource shortage risk is recognized, stable supply of construction resources is guaranteed, and on the basis of the influence of resource shortage, the construction efficiency is improved. The resource distribution sequence is optimized, the resource utilization efficiency is improved, the supply chain delivery cycle is matched, the resource scheduling is optimized, the influence of resource supply and demand imbalance on the construction progress is reduced, and the continuous and stable construction progress is ensured.
Owner:SHENZHEN LEZAO PACKAGING TECH CO LTD

Resource allocation method and device of server, storage medium and electronic equipment

The invention discloses a resource allocation method and device of a server, a storage medium and electronic equipment, and relates to the technical field of computers.The method comprises the steps that firstly, hardware state data of the server, task queue data of a data processing task corresponding to the server and timestamp data of the data processing task are obtained; inputting the hardware state data, the task queue data and the timestamp data into a target resource prediction model, and predicting a resource utilization rate corresponding to a data processing task executed by the server within a preset time period; based on the resource utilization rate, generating a resource allocation strategy corresponding to the server; and executing real-time dynamic allocation of the computing resources of the server according to the resource allocation strategy. Compared with the prior art, the resource allocation can be flexibly adjusted according to the actual load change, the resource utilization rate is remarkably improved, the resource waste is reduced, the task execution efficiency and the service quality are guaranteed, and the intelligent management level and the operation efficiency of the system are improved.
Owner:INSPUR SUZHOU INTELLIGENT TECH CO LTD

AGV scheduling system optimization method based on dynamic priority adjustment and real-time load balance

The invention discloses an AGV scheduling system optimization method based on dynamic priority adjustment and real-time load balance, and the method comprises the steps: dynamically monitoring the emergency degree and arrival time of cargos, enabling a system to adjust the task priority in real time, guaranteeing the priority processing of emergency cargos, and giving consideration to the scheduling efficiency of common cargos; information such as current positions, loads and electric quantity of the AGVs is collected, weighted load values are calculated, weight factors are dynamically adjusted according to task types, load balance is achieved, and the situation that part of the AGVs are overloaded and part of the AGVs are insufficient in load is avoided; and finally, scheduling optimization is carried out by comprehensively considering factors such as the adaptation degree between the task and the AGV, the path distance, the predicted completion time and the load balance, and the overall performance of the AGV system is fully exerted. The flexibility, efficiency and resource utilization rate of the AGV scheduling system are effectively improved, and the AGV scheduling system is suitable for various scenes such as logistics storage and production and manufacturing.
Owner:ANHUI UNIV

Project progress and resource early warning method and system based on dynamic regulation and control

The invention discloses a project progress and resource early warning method and system based on dynamic regulation and control, and the method comprises the steps: 1) collecting project progress and resource data in real time, and constructing a multi-source data fusion model; 2) based on the constructed multi-source data fusion model, judging whether the construction progress and the resource consumption are abnormal or not, and if so, executing the step 3); otherwise, continuing conventional construction progress tracking and resource management; 3) triggering a grading early warning mechanism, generating and executing an optimization regulation and control strategy, and adjusting the construction progress and resource configuration; and 4) evaluating the regulation and control effect, and returning to the step 2) after collecting feedback data. According to the method, the actual construction progress deviation and the resource supply and demand imbalance condition are comprehensively considered, the current overall operation condition of the construction project is analyzed, the construction management strategies are flexibly switched, the management parameters are flexibly adjusted, the construction progress can be rapidly and effectively guaranteed, resource utilization is optimized, and the construction efficiency is improved. And the intelligent level and the response efficiency of construction management are obviously improved.
Owner:EAST CHINA JIAOTONG UNIVERSITY

Computing task scheduling method and system applied to numerical control machining system

The invention provides a calculation task scheduling method and system applied to a numerical control machining system, and the method comprises the steps: obtaining a task request set containing a machining process type and a real-time constraint identifier, extracting a processing complexity feature and a resource demand feature, calling a task priority evaluation model to generate a priority sequence, and carrying out the calculation of a task. Generating an initial scheduling scheme according to the sequence and current available resource information of the system, adaptively adjusting the initial scheduling scheme based on task execution state information fed back in real time, and generating a final scheduling scheme including a task execution sequence and resource allocation parameters, thereby comprehensively considering task complexity, resource requirements and real-time constraints, and improving the scheduling efficiency. Dynamic matching and optimal scheduling of tasks and resources are achieved, and the machining efficiency and the resource utilization rate of the numerical control machining system are effectively improved.
Owner:SHANGHAI DIANSI INTELLIGENT TECH CO LTD

Data hierarchical storage method and device based on access characterization, equipment and medium

The invention relates to the technical field of data processing, can be applied to business scenes of financial science and technology, medical treatment and health and the like, and discloses a data hierarchical storage method, device, equipment and medium based on access characterization. Writing the data into a matched first target storage device according to a preset device performance corresponding relation; after the data are stored, continuously monitoring subsequent access characteristics of the data, and dynamically judging whether the heat state is changed or not; and if the popularity state is changed and a specific migration condition is met, redistributing the second target storage device and completing data migration operation so as to realize automatic hierarchical storage management of cold and hot data. By acquiring the data access representation and dynamically identifying the popularity state, hierarchical migration of data with different popularity among storage devices with different performances is realized, the resource use efficiency and access performance of a storage system are improved, and the storage cost is reduced.
Owner:PING AN TECH (SHENZHEN) CO LTD

Resource scheduling control method and system for big data server

The invention provides a resource scheduling control method and system for a big data server, and the method comprises the steps: constructing a multi-dimensional resource portrait module, collecting the CPU, memory, network, storage I / O load and task queue length of each node in real time, and predicting a resource demand trend through a time sequence algorithm; extracting characteristics such as calculation intensity, data dependence, memory requirements, network transmission quantity and the like; adjusting the weight coefficients of the resource utilization rate, the task completion time and the energy consumption efficiency according to the system load and the historical effect; establishing a bipartite graph model by taking a resource trend as a node feature and a task vector as an edge feature, and calculating a matching score through graph convolution and a multi-objective optimization function; the scheduling scheme is synchronized by adopting a consistency algorithm; automatic rollback and reallocation are carried out when resources are detected to be insufficient; and optimizing a weight coefficient and a network parameter through reinforcement learning. Through the method, the system resource utilization rate can be improved, the task execution efficiency is improved, the overall scheduling effect stability is improved, and the system fault recovery time is shortened.
Owner:SHANGHAI HONGXING INFORMATION TECH CO LTD

Dynamic load balancing optimization method of AI intelligent computing system server equipment

The invention discloses a dynamic load balancing optimization method for AI intelligent computing system server equipment, which relates to the technical field of load balancing optimization, and comprises the following steps: acquiring equipment performance data, and preprocessing the acquired equipment performance data; based on the preprocessed equipment performance data, extracting equipment state features through time sequence analysis and periodic fluctuation detection; predicting the future load change of the equipment based on the state characteristics of the equipment, dividing the priority of the equipment according to the prediction result, and analyzing the resource demand; generating a resource allocation strategy by applying a resource matching algorithm according to the device priority and the resource demand; and executing the resource allocation strategy, receiving feedback information in real time in the execution process, and optimizing the resource allocation strategy according to the feedback information. According to the method, the response speed and the service quality of the server equipment are remarkably improved, and the resource utilization efficiency is maximized.
Owner:CHANGSHA SHAOGUANG SEMICONDUCTOR CO LTD

QoS guarantee method and system of communication network

The invention discloses a QoS guarantee method and system for a communication network, and relates to the technical field of communication networks, and the method comprises the steps: collecting and preprocessing network state data, and forming a standardized data set; dynamically classifying service types based on an improved random forest algorithm, and predicting a future QoS demand trend of each priority service in combination with an LSTM neural network; establishing a mapping model of QoS demands and resource parameters, converting predicted demands into allocable resource indexes, monitoring the resource utilization rate in real time, and setting an elastic reservation mechanism and conflict early warning; when early warning is triggered, selecting an optimal transmission link by adopting a multi-path collaborative algorithm, and implementing differentiated resource allocation according to service priorities; and a closed-loop feedback mechanism is triggered to dynamically adjust resource allocation by monitoring the deviation between the actual QoS and a predicted value in real time. The method has the advantages that through multi-dimensional perception, LSTM prediction, dynamic resource management and multi-path scheduling, QoS requirements of services with different priorities are accurately matched, and dynamic changes of the network are efficiently coped with.
Owner:GUANGDONG XUKE NETWORK TECHNOLOGY CO LTD

Task concurrent scheduling method and related device

The invention relates to the field of data processing, in particular to a task concurrent scheduling method and a related device. The method comprises the following steps: analyzing task information of a target task to obtain a task demand of the target task; comparing the task demand with a system resource state monitored in real time; if the system resource state meets the task requirement, allocating the target task to an execution queue to start execution of the target task, and marking system resources allocated to the target task in a resource management table; if the system resource state does not meet the task requirement, the target task is allocated to a waiting queue, and a resource matching period corresponding to the target task is set; and according to the resource matching period corresponding to the target task in the waiting queue, re-comparing whether the system resource state monitored in real time meets the task requirement or not. According to the method, the resource utilization efficiency can be improved, the task waiting time is shortened, and the tasks can be scheduled and executed orderly and efficiently in a complex resource environment.
Owner:SINNET CLOUD DATA CO LTD

Farmland environment intelligent monitoring system based on multi-source data fusion

The invention relates to the technical field of environment monitoring, in particular to a farmland environment intelligent monitoring system based on multi-source data fusion, which comprises a multi-source data acquisition module for synchronously acquiring original data; the dynamic compensation preprocessing module is used for receiving the original data and generating standard data with aligned time axes through a dynamic timestamp compensation mechanism; the spatial-temporal feature decoupling module is used for performing multi-scale feature extraction on the standardized data and separating spatial distribution features, time sequence features and environment coupling features; the multi-modal fusion analysis module is used for fusing the spatial distribution characteristics, the time sequence characteristics and the environment coupling characteristics by adopting an evidence chain fusion algorithm to generate farmland environment state evaluation parameters; and the edge decision optimization module is used for dynamically adjusting a resource allocation strategy of an edge computing node according to the farmland environment state evaluation parameters. Priority processing of key tasks is achieved under limited computing power, and the response efficiency and the resource utilization rate of the system are effectively improved.
Owner:新疆农业职业技术大学

Artificial intelligence-based cargo transportation path planning method for automatic warehouse logistics

The invention relates to an artificial intelligence-based cargo transportation path planning method and system for automatic warehouse logistics. The method comprises the steps of performing weighted scoring calculation based on customer historical transaction data and cargo attributes, and generating service label data for distinguishing a high-value hierarchy and a common hierarchy; a differentiation algorithm strategy is called according to the service label, an exclusive transportation path is distributed to the high-value goods, obstacle avoidance is optimized in real time, and adjacent orders are matched for common goods to be merged and distributed; in combination with real-time road conditions and storage scheduling data, through path weight dynamic calculation and genetic algorithm iterative optimization, generating a global transportation scheme considering both time efficiency and cost; customer preference parameters are updated in a closed loop mode based on execution feedback data, and system self-adaptive learning is achieved. According to the method, the problems that differentiated services, dynamic response to environment changes and low-efficiency resource utilization cannot be achieved in a traditional method are solved, the punctuality rate of high-value orders and common orders can be increased, and meanwhile the transportation cost of the common orders can be reduced.
Owner:SUZHOU VOCATIONAL INSTITUTE OF INDUSTRIAL TECHNOLOGY

Digital intelligent service system for enterprise service

The invention discloses a digital intelligent service system for enterprise services, which belongs to the field of enterprise digital services and comprises a user demand analysis module, an intelligent data adaptation module, a service resource matching module, a service efficiency evaluation module and a user-friendly interface. The user demand analysis module is used for semantic analysis and classification decision making; the intelligent data adaptation module identifies and analyzes the protocol type, and establishes an intelligent data transmission channel; the service resource matching module carries out resource pre-screening and accurate matching; the service efficiency evaluation module tracks an identifier and captures a four-dimensional index system in real time, and the dynamic evaluation unit realizes service state grading early warning through a sliding window algorithm; according to the invention, accurate demand identification is realized, the response speed and the data transmission efficiency are improved, the user satisfaction is improved, the service matching accuracy is enhanced, the resource utilization efficiency is optimized, the service capability and the customer experience are improved, and maximization of economic benefits and social values is realized.
Owner:KERONG TECHNOLOGY (BEIJING) CO LTD

Order-driven cross-factory collaborative production system

The invention discloses an order-driven cross-factory collaborative production system, and relates to the technical field of intelligent manufacturing and supply chain collaboration, and the system obtains the productivity data, logistics cost and tax policies of a plurality of production bases such as Ningbo, Thailand and America in real time, and carries out the intelligent splitting and distribution of orders through a multi-base productivity game algorithm. And dynamic optimal matching of the order and the productivity is realized. Meanwhile, the system integrates WMS inventory data and third-party logistics real-time quotation, a transportation scheme with the lowest total cost is generated by adopting a genetic algorithm, and cross-border logistics and tax expenditure are remarkably reduced. The system overcomes the problems of information isolated island, response lag, extensive cost control and the like in traditional multi-factory production, realizes global productivity collaborative optimization and supply chain integrated intelligent decision, and improves the enterprise order performance efficiency and the overall resource utilization rate.
Owner:NINGBO HOMELINK ECO ITECH CO LTD

Computing power sharing system and method in multi-tenant environment

The invention relates to the technical field of computing power sharing, in particular to a computing power sharing system and method in a multi-tenant environment, and the system comprises a computing power monitoring module, a load analysis and prediction module, a task priority judgment module, a resource optimization configuration module and a fault management module. According to the invention, by implementing real-time resource monitoring and data analysis and accurately capturing the speed and mode of resource consumption, the resource allocation is more accurate, the waste of computing power resources is avoided, the response capability is improved, the load prediction is generated by using historical and real-time data, the computing power resources can be ensured to be fully utilized in the peak period of demand, overload is avoided, and the service life of the system is prolonged. Through intelligent analysis of the resource utilization rate and the predicted completion time and optimization of priority ranking of the tasks, the emergency tasks can be rapidly responded, implementation of a real-time computing power distribution strategy is achieved, high-efficiency computing power resource use is guaranteed, the stability and reliability of the system are improved, and the cost problem caused by fault response delay is reduced.
Owner:YUNJU DATA TECH (SHANGHAI) CO LTD

MES-based garment regulation and control production method and system

The invention relates to the field of manufacturing execution systems, intelligent production scheduling and industrial data integration, in particular to a clothing regulation and control production method and system based on MES, by integrating production state data and clothing order data which are collected in real time, a production graph model is constructed, Bayesian variational inference is adopted to carry out uncertainty modeling to generate graph representation data, and the production state data and the clothing order data are integrated. And constructing a hypergraph model based on graph representation data, generating a scheduling command by using non-Euclidean embedding and agent collaborative decision, issuing the scheduling command to each production unit for execution, collecting execution data and monitoring abnormality, triggering dynamic rescheduling according to abnormality feedback, and realizing continuous closed-loop optimization of the garment production process. The production efficiency and the resource utilization rate are remarkably improved, and the production risk is reduced.
Owner:QINSILK COM

Computing-storage stream joint scheduling optimization method and system based on DDQN and heuristic strategy

The invention relates to a calculation-storage stream joint scheduling optimization method and system based on DDQN and a heuristic strategy, and belongs to the technical field of distributed calculation and intelligent scheduling. The calculation-storage stream joint scheduling optimization method comprises the following steps: (1) defining a calculation stream and a storage stream; (2) workflow scheduling and execution: when the workflow is triggered, a scheduler evaluates the executable states of the tasks one by one according to the dependency relationship between the tasks and a scheduling strategy, and submits the executable tasks to a task executor; the task executor is responsible for executing the tasks on the working nodes and ensuring that the tasks are completed according to a preset sequence and priority; (3) collecting a DAG structure, queue information and an operation number; (4) task operation time and resource use prediction based on historical operation data; (5) scheduling optimization based on DDQN and a heuristic strategy; and (6) acquiring and storing scheduling information. The task execution efficiency and the resource utilization rate of the system are remarkably improved.
Owner:QILU UNIVERSITY OF TECHNOLOGY (SHANDONG ACADEMY OF SCIENCES) +1

Intelligent scheduling method and system for load balancing of server cluster

The invention relates to the technical field of computers, discloses an intelligent scheduling method and system for server cluster load balancing, and aims to solve the defects of the existing server cluster load balancing technology in response lag, non-uniform resource utilization rate, service quality guarantee, global optimization capability, fine-grained state perception and scheduling decision. The method comprises the following steps: collecting server state and request feature data, constructing a cluster state and service capability model, and predicting a load trend; and generating an optimal routing strategy by using deep reinforcement learning and multi-objective optimization, and issuing adjustment request distribution. The system comprises a data acquisition module, an application request feature acquisition module, a state sensing and modeling module, a load prediction module, an intelligent scheduling decision module and an instruction execution module. By adopting the technical scheme, the resource utilization rate can be improved, the response time can be reduced, the throughput can be improved, the system stability and elasticity can be enhanced, and the operation cost and energy consumption can be reduced.
Owner:LIANYUNGANG DONGLING TECHNOLOGY CO LTD

Layered agent-based space-air-ground caching and resource optimization method and system

The invention discloses an air-space-ground caching and resource optimization method and system based on a hierarchical intelligent agent, and aims to construct a deep reinforcement learning architecture in which a high-layer DQN and a low-layer DDPG are coordinated for high dynamics and information uncertainty of an air-space-ground integrated network. The high-level intelligent agent generates a period-level content cache and access control strategy based on global states including a cache state, a task request, a node resource and the like, and the low-level intelligent agent executes time slot-level resource allocation, task unloading rate control and UAV deployment optimization under the constraint of the high-level strategy. The system triggers low-level optimization through a double-stage reward mechanism and constraint verification, evaluates a strategy effect based on time slot income and full-period income, and combines state perception and experience playback technologies to realize collaborative optimization of high and low-level decisions. A simulation result shows that compared with a traditional method, the method has remarkable advantages in the aspects of reducing content acquisition delay, reducing return communication overhead, improving task processing success rate and the like, and the space-air-ground MEC network resource utilization rate and user experience are effectively improved.
Owner:XIAN UNIV OF POSTS & TELECOMM

Supply chain production scheduling optimization method and system based on multi-source data

The invention discloses a supply chain production scheduling optimization method and system based on multi-source data. According to the method, supplier purchase data is extracted through a data crawler, raw material sharing is analyzed in combination with a knowledge graph, and a raw material sharing list is generated; on the basis of delivery records and product attributes, a quality stable value is predicted through linear regression, process similarity is calculated through a text similarity algorithm, and a process similarity matrix is constructed; in combination with historical sales data, a market demand prediction model is constructed by applying multiple linear regression and time sequence analysis. A complex relation among raw material sharing, process similarity and market demands is described through a graph neural network, a product association network graph is generated, an optimal balance point is found between delivery time and a resource utilization rate through Pareto optimization, and a production scheduling scheme is formed; and finally, integrating the performance score, the quality stable value, the raw material sharing list and the production scheduling scheme through an integer programming algorithm, and optimizing a supplier combination. According to the invention, the production scheduling efficiency and precision are improved, and complex business requirements are met.
Owner:NINGBO XINWU CLOUD TECHNOLOGY CO LTD