Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

2361 results about "Resource utilization" patented technology

Resource utilization is the amount of a good or service consumed or the pattern of use of a good or service within a specified time.

Distributed component dynamic resource allocation method based on multi-objective optimization

The invention discloses a distributed component dynamic resource allocation method based on multi-objective optimization, which is characterized in that a PPO algorithm is introduced into a distributed system, dynamic adjustment is carried out aiming at a plurality of optimization objectives to optimize the overall configuration of resources, and the system firstly collects the real-time state, the task demand and the resource use condition of a distributed component; and then training an intelligent agent by using a PPO algorithm to gradually optimize a resource allocation strategy according to environment feedback, and finally realizing long-term optimization of a resource scheduling process by continuously interacting with the environment and continuously adjusting the strategy through the PPO algorithm. According to the method, the PPO algorithm in reinforcement learning is combined, efficient resource allocation of the distributed components in the complex dynamic environment is achieved, different from an existing rule driving or static optimization method, the allocation strategy can be adjusted in a self-adaptive mode according to task requirements, resource use conditions and system loads which change in real time, the resource utilization rate is increased, and the resource utilization rate is increased. And the system burden is reduced, and efficient operation of the system under variable conditions is ensured.
Owner:CHENGDU HAIQING TECH CO LTD

Computing power scheduling method and system based on dynamic load prediction and resource priority ranking

The invention discloses a computing power scheduling method and system based on dynamic load prediction and resource priority ranking. The computing power scheduling method comprises the following steps: collecting historical load data, task submission data and resource state data of each node in a computing power cluster; on the basis of the preprocessed multi-dimensional load feature data set, constructing an improved hybrid prediction model, optimizing model parameters through training, and predicting the load change trend of each computing power node in a future preset time period by using the trained model to obtain a node load prediction result; extracting a service level protocol parameter, a resource demand type and historical execution efficiency data of a to-be-scheduled task, and establishing a multi-dimensional resource priority evaluation index system; according to the computing power scheduling method, the problems of low resource utilization rate and high task response delay caused by low load prediction precision and mismatching of resource allocation and task priority in a traditional computing power scheduling method are solved, and the overall operation efficiency and service quality of a computing power cluster are improved.
Owner:SHAOGUAN DATA IND RESEARCH INSTITUTE

Production process state monitoring scheduling optimization method based on real-time data acquisition

The invention discloses a production process state monitoring scheduling optimization method based on real-time data acquisition, relates to the technical field of manufacturing process scheduling, and is used for solving the problem of insufficient real-time performance and stability of process scheduling. According to the method, a process monitoring mechanism based on real-time acquisition and closed-loop scheduling is constructed, a time sequence structured data frame is formed under a unified time reference, operation stability and quality offset characteristics are extracted, a data credible label and a current process state factor vector are generated, an optimized scheduling model is input, and task conflicts and resource bottlenecks are identified according to the data credible label and the current process state factor vector. According to the method, path compression and sequence adjustment are implemented in combination with scheduling priority mapping and a resource path diagram, scheduling deviation vectors are constructed through task response time delay and process blocking in operation, rules and parameters are triggered to be updated online and locally rearranged, and solidification is performed after verification in a prediction window, so that equipment idling and switching fragmentization in the production process are reduced, and the production efficiency is improved. And the real-time performance of the production process, the resource utilization rate and the system stability are improved.
Owner:ANHUI JINSHENG INFORMATION TECHNOLOGY CO LTD

5G network slice dynamic scheduling method and system based on multi-modal space-time perception and event knowledge graph

The invention relates to a 5G network slice dynamic scheduling method and system based on multi-modal space-time perception and an event knowledge graph, and belongs to the technical field of mobile communication network resource management. According to the method, the change of a physical scene is sensed in real time by constructing a dynamically evolved event knowledge graph and designing a double-flow space-time cross network in combination with visual semantic analysis; dynamically adjusting the resource prediction model by adopting an event-scene dual-drive mechanism, dynamically adjusting parameters of the gated recurrent neural network through an elastic adjustment factor, and optimizing a multi-target resource allocation strategy based on a reinforcement learning algorithm; a two-stage resource scheduling mode is adopted, non-preemptive resource allocation of priority guarantee is implemented in an event triggering stage, and an optimization strategy of continuous adjustment is deployed in a steady-state stage. According to the method, the resource utilization efficiency and the service quality in a high-concurrency scene are remarkably improved, the method is compatible with an O-RAN standard interface, and the method is suitable for high-reliability and low-delay communication scenes such as smart cities and industrial internet.
Owner:SOUTHWEST FORESTRY UNIVERSITY

Multi-level storage control method based on access popularity

The invention discloses a multi-level storage control method based on access popularity, and relates to the technical field of information, the method comprises the following steps: building a storage resource monitoring module, and collecting data volume change, read-write frequency and capacity occupation proportion information of each node from a storage system in real time; the method comprises the following steps: collecting original data, carrying out preliminary cleaning and formatting processing on the collected original data to obtain a standardized resource state data set, comparing predicted data with operation parameters of a current storage system, and if a predicted demand exceeds a current capacity limit, automatically generating a capacity expansion scheduling task to obtain a final resource optimization configuration scheme; according to the multi-level storage control method and device based on the access popularity, intelligent monitoring, load balancing and capacity planning of storage resources are achieved, the resource utilization efficiency and expandability of a storage system are improved, and an effective solution is provided for stable operation and performance optimization of a large-scale storage system.
Owner:SICHUAN HENTAI SEMICON CO LTD

Computer system service optimization scheduling method for photoelectric system

The invention discloses a computer system service optimization scheduling method for a photoelectric system, and particularly relates to the technical field of computer service optimization, which comprises the following steps of: sensing and extracting information such as task types and time constraints through task characteristics, and constructing a multi-dimensional resource model such as processing capability and idle degree by combining resource modeling; a weighting mechanism is used for evaluating task priorities and generating a scheduling queue, tasks are dynamically mapped to matched resources, a scheduling strategy is adjusted according to system loads and feedback, model parameters are optimized through service feedback, and efficient, self-adaptive and intelligent optimization of task scheduling of the photoelectric system is achieved; according to the method, a dynamic scheduling mechanism based on task characteristics and resource prediction is realized, and the response speed of the high-optimal task is improved; optimizing the resource utilization rate by adopting resource state modeling and prospective mapping; and reinforcement learning and a feedback closed loop are introduced, a sustainable optimization scheduling system is constructed, and the adaptability and stability of the system in a complex photoelectric task environment are enhanced.
Owner:CHANGZHOU WANTUO OPTOELECTRONICS TECHNOLOGY CO LTD

Intelligent supply chain optimization management method and system based on digital AI analysis

The invention relates to the technical field of data processing, and discloses an intelligent supply chain optimization management method and system based on digital AI analysis. The method comprises the steps of collecting supply chain data to construct a resource library; analyzing a sales mode and K-means + + clustering customer features by using LSTM, and predicting demands; inventory parameters and supplier scores are calculated, and a collaborative data set is formed; commodity association is analyzed through a knowledge graph, and a commodity selection decision is generated; resource allocation is carried out by applying multi-objective optimization, and cross-channel inventory collaboration is realized; and an integral rule and a merchant enabling scheme are constructed based on the transaction data, and a digital asset closed-loop mechanism is formed. According to the intelligent supply chain optimization management method based on AI analysis, global visualization, dynamic scheduling and accurate allocation of inventory resources are realized, the technical problem of cross-channel inventory collaborative allocation is solved, and the operation efficiency and the resource utilization rate of the whole supply chain are remarkably improved.
Owner:SHANGHAI DUOKE SHANGPING NETWORK TECHNOLOGY CO LTD

Optical transmission network hidden danger detection method and device and computer program product

The invention discloses an optical transmission network hidden danger detection method and device and a computer program product, which can realize dynamic adjustment of differentiated bandwidth requirements by acquiring optical network state information in real time, evaluating service priority and establishing an optical channel resource allocation model. And when a topology anomaly is detected, constructing a service quality evaluation model by using a long-short-term memory neural network, and quantitatively analyzing the influence of the anomaly on the service. When a fault occurs, distributed link fault detection and a fault diagnosis engine based on a decision tree are adopted, and fault hidden dangers are quickly positioned and classified. And then, through an elastic recovery mechanism oriented to service sensitivity, the service quality level of a standby optical path is adjusted, and an optical layer topology connection relationship is optimized. According to the method, the resource utilization efficiency, the fault recovery capability and the service quality of the optical network are remarkably improved, and an innovative solution is provided for intelligent optical network management.
Owner:SHENZHEN POWER SUPPLY BUREAU

Resource allocation method and device of server, storage medium and electronic equipment

The invention discloses a resource allocation method and device of a server, a storage medium and electronic equipment, and relates to the technical field of computers.The method comprises the steps that firstly, hardware state data of the server, task queue data of a data processing task corresponding to the server and timestamp data of the data processing task are obtained; inputting the hardware state data, the task queue data and the timestamp data into a target resource prediction model, and predicting a resource utilization rate corresponding to a data processing task executed by the server within a preset time period; based on the resource utilization rate, generating a resource allocation strategy corresponding to the server; and executing real-time dynamic allocation of the computing resources of the server according to the resource allocation strategy. Compared with the prior art, the resource allocation can be flexibly adjusted according to the actual load change, the resource utilization rate is remarkably improved, the resource waste is reduced, the task execution efficiency and the service quality are guaranteed, and the intelligent management level and the operation efficiency of the system are improved.
Owner:INSPUR SUZHOU INTELLIGENT TECH CO LTD

Project progress and resource early warning method and system based on dynamic regulation and control

The invention discloses a project progress and resource early warning method and system based on dynamic regulation and control, and the method comprises the steps: 1) collecting project progress and resource data in real time, and constructing a multi-source data fusion model; 2) based on the constructed multi-source data fusion model, judging whether the construction progress and the resource consumption are abnormal or not, and if so, executing the step 3); otherwise, continuing conventional construction progress tracking and resource management; 3) triggering a grading early warning mechanism, generating and executing an optimization regulation and control strategy, and adjusting the construction progress and resource configuration; and 4) evaluating the regulation and control effect, and returning to the step 2) after collecting feedback data. According to the method, the actual construction progress deviation and the resource supply and demand imbalance condition are comprehensively considered, the current overall operation condition of the construction project is analyzed, the construction management strategies are flexibly switched, the management parameters are flexibly adjusted, the construction progress can be rapidly and effectively guaranteed, resource utilization is optimized, and the construction efficiency is improved. And the intelligent level and the response efficiency of construction management are obviously improved.
Owner:EAST CHINA JIAOTONG UNIVERSITY

Computing task scheduling method and system applied to numerical control machining system

The invention provides a calculation task scheduling method and system applied to a numerical control machining system, and the method comprises the steps: obtaining a task request set containing a machining process type and a real-time constraint identifier, extracting a processing complexity feature and a resource demand feature, calling a task priority evaluation model to generate a priority sequence, and carrying out the calculation of a task. Generating an initial scheduling scheme according to the sequence and current available resource information of the system, adaptively adjusting the initial scheduling scheme based on task execution state information fed back in real time, and generating a final scheduling scheme including a task execution sequence and resource allocation parameters, thereby comprehensively considering task complexity, resource requirements and real-time constraints, and improving the scheduling efficiency. Dynamic matching and optimal scheduling of tasks and resources are achieved, and the machining efficiency and the resource utilization rate of the numerical control machining system are effectively improved.
Owner:SHANGHAI DIANSI INTELLIGENT TECH CO LTD

Data hierarchical storage method and device based on access characterization, equipment and medium

The invention relates to the technical field of data processing, can be applied to business scenes of financial science and technology, medical treatment and health and the like, and discloses a data hierarchical storage method, device, equipment and medium based on access characterization. Writing the data into a matched first target storage device according to a preset device performance corresponding relation; after the data are stored, continuously monitoring subsequent access characteristics of the data, and dynamically judging whether the heat state is changed or not; and if the popularity state is changed and a specific migration condition is met, redistributing the second target storage device and completing data migration operation so as to realize automatic hierarchical storage management of cold and hot data. By acquiring the data access representation and dynamically identifying the popularity state, hierarchical migration of data with different popularity among storage devices with different performances is realized, the resource use efficiency and access performance of a storage system are improved, and the storage cost is reduced.
Owner:PING AN TECH (SHENZHEN) CO LTD

Resource scheduling control method and system for big data server

The invention provides a resource scheduling control method and system for a big data server, and the method comprises the steps: constructing a multi-dimensional resource portrait module, collecting the CPU, memory, network, storage I / O load and task queue length of each node in real time, and predicting a resource demand trend through a time sequence algorithm; extracting characteristics such as calculation intensity, data dependence, memory requirements, network transmission quantity and the like; adjusting the weight coefficients of the resource utilization rate, the task completion time and the energy consumption efficiency according to the system load and the historical effect; establishing a bipartite graph model by taking a resource trend as a node feature and a task vector as an edge feature, and calculating a matching score through graph convolution and a multi-objective optimization function; the scheduling scheme is synchronized by adopting a consistency algorithm; automatic rollback and reallocation are carried out when resources are detected to be insufficient; and optimizing a weight coefficient and a network parameter through reinforcement learning. Through the method, the system resource utilization rate can be improved, the task execution efficiency is improved, the overall scheduling effect stability is improved, and the system fault recovery time is shortened.
Owner:SHANGHAI HONGXING INFORMATION TECH CO LTD

QoS guarantee method and system of communication network

The invention discloses a QoS guarantee method and system for a communication network, and relates to the technical field of communication networks, and the method comprises the steps: collecting and preprocessing network state data, and forming a standardized data set; dynamically classifying service types based on an improved random forest algorithm, and predicting a future QoS demand trend of each priority service in combination with an LSTM neural network; establishing a mapping model of QoS demands and resource parameters, converting predicted demands into allocable resource indexes, monitoring the resource utilization rate in real time, and setting an elastic reservation mechanism and conflict early warning; when early warning is triggered, selecting an optimal transmission link by adopting a multi-path collaborative algorithm, and implementing differentiated resource allocation according to service priorities; and a closed-loop feedback mechanism is triggered to dynamically adjust resource allocation by monitoring the deviation between the actual QoS and a predicted value in real time. The method has the advantages that through multi-dimensional perception, LSTM prediction, dynamic resource management and multi-path scheduling, QoS requirements of services with different priorities are accurately matched, and dynamic changes of the network are efficiently coped with.
Owner:GUANGDONG XUKE NETWORK TECHNOLOGY CO LTD

Farmland environment intelligent monitoring system based on multi-source data fusion

The invention relates to the technical field of environment monitoring, in particular to a farmland environment intelligent monitoring system based on multi-source data fusion, which comprises a multi-source data acquisition module for synchronously acquiring original data; the dynamic compensation preprocessing module is used for receiving the original data and generating standard data with aligned time axes through a dynamic timestamp compensation mechanism; the spatial-temporal feature decoupling module is used for performing multi-scale feature extraction on the standardized data and separating spatial distribution features, time sequence features and environment coupling features; the multi-modal fusion analysis module is used for fusing the spatial distribution characteristics, the time sequence characteristics and the environment coupling characteristics by adopting an evidence chain fusion algorithm to generate farmland environment state evaluation parameters; and the edge decision optimization module is used for dynamically adjusting a resource allocation strategy of an edge computing node according to the farmland environment state evaluation parameters. Priority processing of key tasks is achieved under limited computing power, and the response efficiency and the resource utilization rate of the system are effectively improved.
Owner:新疆农业职业技术大学

Order-driven cross-factory collaborative production system

The invention discloses an order-driven cross-factory collaborative production system, and relates to the technical field of intelligent manufacturing and supply chain collaboration, and the system obtains the productivity data, logistics cost and tax policies of a plurality of production bases such as Ningbo, Thailand and America in real time, and carries out the intelligent splitting and distribution of orders through a multi-base productivity game algorithm. And dynamic optimal matching of the order and the productivity is realized. Meanwhile, the system integrates WMS inventory data and third-party logistics real-time quotation, a transportation scheme with the lowest total cost is generated by adopting a genetic algorithm, and cross-border logistics and tax expenditure are remarkably reduced. The system overcomes the problems of information isolated island, response lag, extensive cost control and the like in traditional multi-factory production, realizes global productivity collaborative optimization and supply chain integrated intelligent decision, and improves the enterprise order performance efficiency and the overall resource utilization rate.
Owner:NINGBO HOMELINK ECO ITECH CO LTD

Computing-storage stream joint scheduling optimization method and system based on DDQN and heuristic strategy

The invention relates to a calculation-storage stream joint scheduling optimization method and system based on DDQN and a heuristic strategy, and belongs to the technical field of distributed calculation and intelligent scheduling. The calculation-storage stream joint scheduling optimization method comprises the following steps: (1) defining a calculation stream and a storage stream; (2) workflow scheduling and execution: when the workflow is triggered, a scheduler evaluates the executable states of the tasks one by one according to the dependency relationship between the tasks and a scheduling strategy, and submits the executable tasks to a task executor; the task executor is responsible for executing the tasks on the working nodes and ensuring that the tasks are completed according to a preset sequence and priority; (3) collecting a DAG structure, queue information and an operation number; (4) task operation time and resource use prediction based on historical operation data; (5) scheduling optimization based on DDQN and a heuristic strategy; and (6) acquiring and storing scheduling information. The task execution efficiency and the resource utilization rate of the system are remarkably improved.
Owner:QILU UNIVERSITY OF TECHNOLOGY (SHANDONG ACADEMY OF SCIENCES) +1

Intelligent scheduling method and system for load balancing of server cluster

The invention relates to the technical field of computers, discloses an intelligent scheduling method and system for server cluster load balancing, and aims to solve the defects of the existing server cluster load balancing technology in response lag, non-uniform resource utilization rate, service quality guarantee, global optimization capability, fine-grained state perception and scheduling decision. The method comprises the following steps: collecting server state and request feature data, constructing a cluster state and service capability model, and predicting a load trend; and generating an optimal routing strategy by using deep reinforcement learning and multi-objective optimization, and issuing adjustment request distribution. The system comprises a data acquisition module, an application request feature acquisition module, a state sensing and modeling module, a load prediction module, an intelligent scheduling decision module and an instruction execution module. By adopting the technical scheme, the resource utilization rate can be improved, the response time can be reduced, the throughput can be improved, the system stability and elasticity can be enhanced, and the operation cost and energy consumption can be reduced.
Owner:LIANYUNGANG DONGLING TECHNOLOGY CO LTD

Layered agent-based space-air-ground caching and resource optimization method and system

The invention discloses an air-space-ground caching and resource optimization method and system based on a hierarchical intelligent agent, and aims to construct a deep reinforcement learning architecture in which a high-layer DQN and a low-layer DDPG are coordinated for high dynamics and information uncertainty of an air-space-ground integrated network. The high-level intelligent agent generates a period-level content cache and access control strategy based on global states including a cache state, a task request, a node resource and the like, and the low-level intelligent agent executes time slot-level resource allocation, task unloading rate control and UAV deployment optimization under the constraint of the high-level strategy. The system triggers low-level optimization through a double-stage reward mechanism and constraint verification, evaluates a strategy effect based on time slot income and full-period income, and combines state perception and experience playback technologies to realize collaborative optimization of high and low-level decisions. A simulation result shows that compared with a traditional method, the method has remarkable advantages in the aspects of reducing content acquisition delay, reducing return communication overhead, improving task processing success rate and the like, and the space-air-ground MEC network resource utilization rate and user experience are effectively improved.
Owner:XIAN UNIV OF POSTS & TELECOMM

Complex project-oriented task priority adaptive adjustment system and method

The invention relates to the technical field of task scheduling, in particular to a task priority self-adaptive adjustment system and method for a complex project, and provides the following scheme that a plurality of dependency graphs are constructed by obtaining a plurality of task data sets of a target project and extracting multi-dimensional features of time, resources and dependency relationships; and the tasks are divided into a first-layer task, a second-layer task and a third-layer task. And calculating the priority of each layer of tasks in sequence, and generating a global task execution sequence in combination with the time urgency of the first priority, the resource demand of the second priority and the dependency relationship of the third priority. And when an adjustment condition is triggered, sequentially adjusting the priorities according to the priority levels, and dynamically updating a task execution sequence. The task scheduling efficiency and the global adaptability of the complex project can be improved, and the production efficiency and the resource utilization rate are improved.
Owner:SHANGHAI XINGANG INFORMATION TECH CO LTD

AmBC-NOMA communication resource joint optimization method for high mobility V2X scene

The invention provides an AmBC-NOMA communication resource joint optimization method for a high mobility V2X scene, and relates to the technical field of communication resource joint optimization. Aiming at channel dynamic change caused by high-speed motion of a vehicle and the influence of the channel dynamic change on short packet communication reliability and rate performance, the method combines reflection type communication and non-orthogonal multiple access technologies, and on the basis of fully considering channel time-varying characteristics, a reflection coefficient, a power distribution coefficient and block length resource distribution in a system are jointly optimized, so that the reliability and the rate performance of short packet communication are improved. Therefore, the communication rate performance and the resource utilization efficiency under the requirements of short time delay and low error rate are improved. Through the method, the short packet transmission rate of the system can be remarkably improved under the conditions of limited time delay and channel uncertainty, and the actual application requirements of the future Internet of Vehicles system for efficient, low-time-delay and high-reliability short packet communication are met.
Owner:NORTHEASTERN UNIV CHINA

Resource urgency assessment and dynamic scheduling method and system based on behavior characteristics

The invention provides a resource urgency degree evaluation and dynamic scheduling method and system based on behavior characteristics, and the method comprises the steps: collecting equipment protocol characteristic data, equipment resource state data and user historical behavior data, and carrying out the preprocessing, and obtaining a standardized data set; by fusing a convolutional neural network, a bidirectional gating circulation unit and a network model of an attention mechanism, extracting spatial-temporal characteristics and a long and short term dependency relationship of the standardized data set, and generating depth behavior characteristics; dynamically calculating a task urgency degree weight from three dimensions of business priority, an equipment performance baseline and environment health degree by adopting a fuzzy analytic hierarchy process based on the depth behavior characteristics, and generating a comprehensive urgency degree score; according to the comprehensive urgency score, generating a dynamic scheduling strategy and executing resource allocation; and monitoring the resource utilization rate and the service level agreement compliance rate, and feeding back for optimizing a subsequent scheduling strategy.
Owner:SHANDONG COMP SCI CENTNAT SUPERCOMP CENT IN JINAN +1

Outpatient automatic triage method based on multi-modal data fusion

The invention relates to the technical field of intelligent triage, in particular to an outpatient service automatic triage method based on multi-modal data fusion, which comprises the following steps of: acquiring the number of reception people, queue length and registration increment through a platform, inputting K-means clustering to evaluate reception load, calculating reception efficiency per unit time, extracting a chief complaint feature vector, and inputting the chief complaint feature vector into an SVM (Support Vector Machine) matching department. A matching degree and queue length weighted sorting path is combined, a dynamic threshold value and diversity constraints are introduced, the reception pressure and the emergency level are fused to adjust the priority, and a triage result is output. According to the method, the matching degree and balance are improved and the path flexibility and fault tolerance are optimized by fusing the three-dimensional pressure level and the sliding window calculation efficiency, extracting the symptom vector to optimize the matching precision, fusing the matching degree and the queue dynamic weight, introducing the diversity factor to expand the path and constructing the multi-dimensional evaluation model dynamic response; and the waiting stability, the resource utilization efficiency and the service quality are improved.
Owner:THE FIRST AFFILIATED HOSPITAL OF ARMY MEDICAL UNIV

Resource and task aware visual processing edge adaptive decision-making method

The invention belongs to the technical field of artificial intelligence and computer vision, particularly relates to a visual processing edge adaptive decision-making method for resource and task perception, and aims to solve the problem of scheduling mismatch caused by resource dynamic change and task demand diversity in visual task processing in an edge computing environment. The method comprises the following steps: collecting multi-dimensional resource state data of edge nodes in real time to form a resource state vector with high time resolution; analyzing the visual task request, and constructing a quantifiable task feature vector; and establishing a resource-task association mapping model based on a dynamic weight distribution mechanism. The method also supports cross-edge domain collaborative decision, and processes a pipeline dynamic reconstruction and security isolation mechanism. According to the technical scheme, the fluctuation of the resource utilization rate is reduced to 15% or below, the average task processing delay is reduced to 60%, the scheduling satisfaction degree is improved by 40% or above, and the self-adaptability and the service quality guarantee capability of the edge vision system are remarkably enhanced.
Owner:SHENZHEN IBD INTELLIGENT TECH CO LTD

Server resource dynamic scheduling method for dealing with video stream high concurrent access

The invention discloses a server resource dynamic scheduling method for dealing with video stream high concurrent access, and particularly relates to the technical field of computer network and intelligent scheduling. A user access behavior data set is constructed; a deep learning model is adopted to train an access hot spot prediction model based on the time sequence features to predict a future access hot spot area and a peak trend; acquiring response delay, CPU / GPU occupancy rate and bandwidth load information of the heterogeneous server group, and generating a resource state multi-dimensional parameter set; carrying out joint modeling on the model and the parameter set, constructing a resource scheduling priority model by adopting a graph neural network, and generating an optimal scheduling path graph based on an A * improved algorithm; task transfer, instance elastic expansion, cache preheating and other scheduling operations are executed according to the model; according to the method, the resource utilization efficiency and the service quality of the video system in a high-concurrency scene can be improved, and the method has the advantages of being high in real-time performance, intelligent in scheduling and high in self-learning capability.
Owner:SBAIDA INTERNET OF THINGS TECH (BEIJING) CO LTD +1

Production scheduling method, production scheduling system and electronic equipment

The invention discloses a production scheduling method, a production scheduling system and electronic equipment, and belongs to the technical field of production management and scheduling. The production scheduling method comprises the steps that according to production requirements and a preset production correlation model, a fitness function and an initial production scheduling scheme set are determined, and the fitness function comprises at least two of the following production scheduling strategies: total delay time minimization, resource utilization rate maximization, production line load balancing and intermediate product minimization; at least two preset algorithms are fused, the initial production scheduling scheme set is optimized based on the fitness function, the optimal production scheduling scheme is obtained, and the preset algorithms comprise any one of a genetic algorithm, a simulated annealing algorithm and a tabu search algorithm. The method can solve the problems of insufficient processing of resource constraints, low production scheduling efficiency and incapability of effectively finding the optimal production scheduling scheme in related technologies.
Owner:CHINA NUCLEAR POWER ENGINEERING CO LTD

Priority scheduling generation method and system for Beidou satellite short message communication

The invention relates to a priority scheduling generation method and system for Beidou satellite short message communication, and the method comprises the steps: collecting multi-dimensional features, such as message service types, user identities, spatio-temporal information, channel states and the like, dynamically calculating the priority score of each message through a configurable weighting model, and then, carrying out the dynamic calculation of the priority score of each message; the method comprises the following steps of: abstracting a message into a conflict graph vertex, establishing an edge according to a receiving conflict relationship, distributing candidate message sets which are not conflicted with each other for each scheduling time slot by adopting an independent set selection algorithm, and performing joint optimization on a message sending sequence and power distribution by using a genetic algorithm in each time slot by taking a maximized comprehensive utility value as a target, and generating a final scheduling instruction. Through dynamic evaluation, conflict avoidance and resource collaboration, intelligence and self-adaption of a scheduling strategy are realized, and the guarantee capability of a system for key messages and the overall resource utilization efficiency are remarkably improved.
Owner:HUAXIN ZHENGNENG GRP CO LTD

Front-end resource dynamic preloading method and system based on user behavior intention prediction

The invention provides a front-end resource dynamic preloading method and system based on user behavior intention prediction, and relates to the technical field of computers, and the method comprises the steps: collecting continuous behavior data of a user in real time in a client browser, carrying out the feature extraction of the collected behavior data, and generating a behavior feature vector; on the basis of an intention prediction model deployed at a client, according to the behavior feature vector, performing real-time prediction on the click intention probability of each interactive element in the page; when the predicted click intention probability exceeds a preset threshold value, triggering a resource preloading instruction; and according to the resource preloading instruction, dynamically creating a browser preloading label, and starting background downloading of a target resource so as to perform dynamic preloading of a front-end resource. According to the method and the device, the resource utilization rate and the page loading efficiency are improved, so that the waste of a server and network resources is reduced while the user experience is improved.
Owner:BEIJING HESI HUIZHI INFORMATION TECHNOLOGY CO LTD

Building solid waste intelligent disposal and recycling system and method based on Internet of Things

The invention relates to the technical field of waste management, in particular to a building solid waste intelligent disposal and reutilization system and method based on the Internet of Things, and the system comprises a solid waste classification optimization module, a solid waste disposal adaptation module, a recycling path planning module, an environmental impact evaluation module and a scheduling optimization module. According to the method, the sorting priority is dynamically adjusted by recognizing the particle size, density and energy consumption change of the solid waste, the recognition precision and separation efficiency of the mixed materials are improved, the path is compared and adjusted in combination with the equipment capacity, the solid waste attributes are matched, resource loss and mistaken sorting are avoided, the trend and concentration degree are extracted in the recycling link, and the path matching degree is improved; according to the method, the proportion of unavailable components is reduced, environmental load and energy consumption change are fused in the processing process, a high-emission section is adjusted, environmental impact is relieved, jump frequency is analyzed in combination with task switching, the adaptability and scheduling continuity of the system to change interference are enhanced, and resource utilization continuity, response sensitivity and environmental adaptation level are integrally improved.
Owner:XIANYANG VOCATIONAL TECHN COLLEGE

Construction progress control system based on BIM

The invention relates to the technical field of progress management, in particular to a BIM (Building Information Modeling)-based construction progress control system, which comprises a component list analysis module, a node task sorting module, a connection sequence conflict verification module, a process compression allocation module and a component path intensive control module. According to the method, unified expression of the construction tasks under multi-dimensional parameters can be realized by analyzing the component labeling information and performing weighted merging on the volumes and the working hours of the node tasks, and the matching degree of task sorting priority adjustment is improved by comparing standardized vector sorting with a construction logic sequence; the consistency verification of the connection direction and the scheduling sequence of the adjacent components in the construction path ensures that the component connection logic is not damaged, and by setting the compression ratio and resource utilization rate parameters, the time window fine compression of the tasks in the conflict path is realized, the dynamic coordination capability of the construction resources is improved, and the process stacking risk caused by scheduling congestion is reduced.
Owner:JIANGSU DAHAN CONSTR INDAL GROUP