Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

57 results about "Optimal management" patented technology

Docker Registry management optimization mode and device

The invention provides a Docker Registry management optimization mode. The Docker Registry management optimization mode comprises the steps that based on Docker Registry management requirements, a Docker Registry native management mode corresponding to the management requirements is determined; based on the management requirements, a corresponding optimization management mode is determined; optimization is conducted on the native management mode through the optimization management mode, and corresponding Docker Registry management operation is conducted through an optimized operational order. According to the embodiment, the problems that the native Docker Registry control operational mode is unfriendly, management operation is complex, and the network operation and maintenance cost is too high are solved. For example, storage catalogs of mirrored documents are changed to cluster-type share mirrored storage equipment from a local storage area, namely, single-machine mirrored storage is changed to cluster-type mirrored storage, and on the condition of large-scale cluster-type machinery equipment, the mirrored document maintenance cost can be greatly lowered. For another example, by means of the mode that multiple Registry service operation is simplified, the operating difficulty of Docker Registry management is lowered, and the network maintenance operational experience is improved.
Owner:360 TECH GRP CO LTD

Energy consumption optimization management system and method thereof

The invention discloses an energy consumption optimization management system and method, and particularly relates to the field of energy management, and the system comprises an intelligent information collection terminal collection module, an energy data preprocessing module, an intelligent prediction module, a multi-target optimization scheduling module, a real-time feedback module, an abnormity alarm module, and a scheduling scheme output module. According to the energy consumption optimization management system and the method thereof, data are acquired through the intelligent information acquisition terminal acquisition module by means of various intelligent information acquisition terminals, so that efficient management of energy consumption is realized; dynamic prediction, optimal scheduling and efficient management of energy consumption are realized through the intelligent prediction module, and the accuracy of energy consumption trend prediction is improved. And a multi-target optimization scheduling scheme is obtained by applying a multi-target optimization algorithm through the multi-target optimization scheduling module, so that the scientificity and rationality of energy scheduling are improved, and energy waste caused by unreasonable scheduling is reduced.
Owner:QINGDAO ZHISHENG INTELLIGENT EQUIPMENT CO LTD

Medical equipment full life cycle management system based on digital twinning technology

The invention discloses a medical equipment full-life-cycle management system based on a digital twinning technology. The medical equipment full-life-cycle management system comprises four modules. The digital twinborn model construction module constructs and updates a simulation medical equipment digital model in real time; the intelligent data acquisition and monitoring module is responsible for data acquisition, transmission, monitoring and interface design; the intelligent decision and maintenance module realizes fault prediction, maintenance plan generation and record management; and the comprehensive analysis and optimization management module performs data analysis, optimization decision and life cycle planning. The system has the remarkable advantages that when equipment is used, the running state of the equipment is adjusted in time through real-time monitoring and intelligent analysis, and the fault rate and the maintenance and replacement frequency are reduced; in the aspect of cost control, a maintenance strategy and a purchase decision are optimized, and expenditure is reduced; at the medical service quality level, stable and efficient operation of equipment is guaranteed, patient safety is improved, and reasonable utilization of medical resources is achieved.
Owner:LESHAN NORMAL UNIV +1

Electric power system optimization scheduling method based on artificial intelligence

The invention discloses a power system optimization scheduling method based on artificial intelligence, and relates to the technical field of power system fault testing. The method comprises the steps of obtaining production monitoring data, operation data and management data under a target power system as a power data set, and performing preprocessing; constructing a load prediction model, inputting historical load data, user power consumption behaviors, meteorological data and calendar characteristics, and outputting a predicted power grid load curve; the technical key points are as follows: through combination with an equipment health state evaluation model, dynamic adjustment of health scores and subsequent real-time scheduling optimization, an optimal management scheme with extremely high linkage is formed, the effect of accurately identifying potential fault risks is realized, operation and maintenance personnel can take prevention measures in advance, and the risk of potential faults is prevented. The situation of misjudgment or missing report caused by neglecting external factors is avoided, and the pre-judgment and response capability of the whole scheduling scheme to the equipment health risk is enhanced.
Owner:GANSU SHINING SCI & TECH

Safety penetration type management method and system for engineering construction project

The invention discloses a safe penetration type management method and system for an engineering construction project, and relates to the technical field of constructional engineering, and the method comprises the steps: collecting engineering entity data in real time, carrying out the preprocessing, and generating an engineering state vector; based on the engineering state vector, constructing a digital twinborn model, calling multi-physics field coupling simulation to simulate the whole construction process, and generating a risk early warning report; uploading the risk early warning report and historical construction data to a federated platform, and constructing a dynamic security knowledge graph; performing hierarchical feature learning on nodes in the dynamic security knowledge graph, simulating decision behaviors of a manager, and generating an optimal management and control rule; based on the optimal management and control rule, driving a construction site management mechanism to operate, and forming a closed loop report; by using the digital twin model and the multi-physics field simulation technology, the accurate prediction of potential safety hazards possibly occurring in the construction process is realized, and the accuracy and timeliness of risk early warning are greatly improved.
Owner:SHENZHEN CHUANGTIE TECH CO LTD

Management method and system for coping with nursing rehabilitation service

The invention discloses a management method and system for coping with nursing rehabilitation service, and relates to the technical field of nursing management. The method comprises the following steps: collecting and maintaining personal information of all users; health assessment is conducted on the target user regularly, and a rehabilitation state data set is obtained; the technical key points are as follows: the daily average nursing duration fine adjustment operation when the nursing grade reaches the limit is constructed, and the Barthel index, the PEI value and the ideal range deviation degree of the physical state evaluation value are introduced, so that the whole scheme can flexibly adjust the nursing duration to adapt to the rehabilitation trend change on the premise that the nursing grade is not changed or cannot be continuously adjusted, and the rehabilitation effect is improved. On one hand, personalized nursing resource configuration is carried out according to functional state differences, service flexibility is enhanced while nursing grade stability is maintained, on the other hand, the nursing disjunction phenomenon caused by grade limitation is avoided, and optimal management operation on nursing operation is completed.
Owner:SHANGHAI PUDONG HOSPITAL

Intelligent construction site equipment remote monitoring management method and system based on Internet of Things

The invention provides an intelligent construction site equipment remote monitoring management method and system based on the Internet of Things, and relates to the technical field of monitoring management, and the method comprises the steps: collecting the operation parameters of target construction site equipment through an Internet of Things sensor; constructing a life monitoring model in combination with the operation parameters; performing remote monitoring on the target construction site equipment based on the life monitoring model to obtain an equipment operation condition; and performing equipment maintenance management according to the equipment operation condition. According to the invention, the technical problem that the construction progress and the engineering efficiency are further influenced due to the lack of personalization and precision of maintenance decisions caused by insufficient management of the life cycle of construction site equipment in the prior art can be solved, the technical targets of intelligent monitoring and optimal management of the whole life cycle of the equipment are achieved, and the purposes of improving the operation efficiency of the equipment and reducing the construction cost are achieved. And the technical effect of finishing the project on time is ensured.
Owner:SHENZHEN ZHONGKE SHUJIAN TECH CO LTD

A service optimization management system for remote medical services

The present invention provides a service optimization management system for telemedicine services, which relates to the field of data processing technology. The system includes: retrieving multiple queue information sets based on the reception window, extracting multiple queue personnel characteristics for differential identification of consultation time, generating multiple consultation time prediction data, monitoring queue conflicts based on the appointment queue information set and the online queue information set, building a queue time prediction model, generating a consultation queue time data set, formulating multiple exclusive channels, performing feedback response through the user terminal, optimizing the multiple consultation time prediction data according to the feedback response results, updating the consultation queue time data set, and realizing the optimization management of telemedicine services. The technical effects of more accurate resource allocation and service optimization, improving service efficiency and quality, reducing patient waiting time, and improving patient satisfaction are achieved.
Owner:CANGLAN LINGXING (NANJING) INFORMATION TECH CO LTD

A management method and system for nursing rehabilitation services

The application discloses a kind of management methods and systems to cope with nursing rehabilitation service, it is related to nursing management technical field;The method includes the steps of: collecting and maintaining the personal information of all users;Regular health assessment is carried out to target user, and obtains rehabilitation state data set;Its technical points are: the daily nursing time length fine tuning operation when the nursing level has reached the limit is constructed, and the ideal range deviation degree of Barthel index, PEI value and body state evaluation value is introduced therein, so that the overall scheme can flexibly adjust the nursing time length under the premise that the nursing level is unchanged or cannot continue to adjust, to adapt to the rehabilitation trend change, on the one hand, individualized nursing resource allocation is realized according to functional state difference, while maintaining the stability of nursing level, enhance service flexibility, on the other hand, avoid the nursing disjointedness phenomenon caused by level limit, complete the optimization management operation of nursing operation.
Owner:SHANGHAI PUDONG HOSPITAL

system

We provide the system. [Solution] A means of communication for receiving information on the health status of residents, An analytical means for analyzing the aforementioned health status information and extracting estimated diseases, A means for presenting management methods that proposes the optimal management method based on the analysis results, A monitoring system for collecting residents' biometric information and detecting abnormalities, A warning generation means that generates a notification when an anomaly is detected, A report generation means for generating an evaluation report including the aforementioned analysis results and management method, A system that includes this.
Owner:SOFTBANK GROUP CORP

Data center pipeline optimization management method and system

The invention provides a data center pipeline optimization management method and system, and belongs to the technical field of optimization management, and the method specifically comprises the steps: according to the coincidence condition of the distribution data of a harmonic monitoring abnormal time period and the data processing busy time period of a corresponding server, when it is determined that the optimization processing of a matched optical cable line does not need to be carried out, carrying out the optimization processing of the matched optical cable line; and determining an abnormal condition of a data processing result of the corresponding server in the harmonic monitoring abnormal time period based on the distribution data of the harmonic monitoring abnormal time period, and determining an interference risk server in the servers based on the abnormal condition, according to the method, the optimal management method of the matched optical cable line is determined according to the interference risk server data in different harmonic monitoring abnormal time periods and the data processing busy time periods of different interference risk servers, so that the operation reliability of the servers is improved, and the risk of electromagnetic interference is reduced.
Owner:ZHEJIANG POST & TELECOMM

system

PendingJP2026045034AInstrumentsEvaluation resultManagerial decision
The system according to the embodiment aims to simulate multiple scenarios and derive an optimal management pattern. [Solution] A system according to an embodiment includes a setting unit, a judgment unit, an evaluation unit, and a derivation unit. The setting unit sets a job title, personality, and judgment tendency. The judgment unit makes a management decision based on the job title, personality, and judgment tendency set by the setting unit. The evaluation unit evaluates the management decision made by the judgment unit. The derivation unit derives an optimal management pattern based on the evaluation results obtained by the evaluation unit.
Owner:SOFTBANK GROUP CORP

Ultrasonic amplitude-change pole optimization management method and system

The invention provides an ultrasonic amplitude-change pole optimization management method and system. The method comprises the following steps: receiving a performance target parameter set which is set when the system is initialized; dividing the amplitude-change pole into an input section, a middle transition section and an output section to construct a structure design model, and reversely optimizing the structure design model through a performance prediction module to generate a corresponding parameter set; sLM process parameters are collected, the parameter set is combined to be input into a pre-constructed error prediction module, and manufacturing error prediction is generated; real-time amplitude-change pole performance data are collected and combined, the manufacturing error prediction and the performance offset are combined, an individual final performance value is generated through Bayesian weighted fusion, and an individual performance label of each individual amplitude-change pole is constructed; the tissue electrical impedance, the cutter head temperature and the ultrasonic echo signal are collected in real time in the operation, the driving voltage of the transducer is dynamically adjusted by combining the individual performance label, and closed-loop control over the amplitude is carried out. According to the invention, a safer and more intelligent energy output scheme is provided for a high-complexity operation scene.
Owner:MINJIANG UNIVERSITY

Method for adjusting quality criteria of model mounted on edge device by using management situation data

PCT designated stage expiredWO2025121469A1Image analysisBiological modelsAnomaly detectionQuality control
The present invention relates to optimizing a management environment and a quality control, by adjusting quality criteria of an abnormality detection model applied to an edge device according to a management situation. In addition, an objective of the present invention is to establish optimal quality criteria by comprehensively calculating a production disruption caused by increasing quality criteria of a model, a loss amount of a sales profit according to a missed sales opportunity due to the production disruption, and a risk of quality costs that may occur when the quality criteria is lowered.
Owner:LG ELECTRONICS INC

system

PendingJP2026103481AForecastingResourcesManagement planningVirtual conference
We provide the system. [Solution] A means including multiple artificial intelligences that collect data related to urban management and perform analyses on energy, transportation, and the environment based on said data, A means for conducting virtual meetings among multiple artificial intelligences, integrating urban management information, and generating an optimal management plan, A means for automatically executing urgent management instructions based on the generated management plan, A means of notifying the user of the results of the execution and enabling them to make further decisions, A system that includes this.
Owner:SOFTBANK GROUP CORP

Pre-class meeting intelligent management control method and system

The invention relates to the technical field of mine field meeting before class, solves the technical problems that in the prior art, data analysis is low in accuracy and robustness, and the analysis process is tedious and difficult to learn, and particularly relates to a meeting before class intelligent management control method and system. Pre-processing the reference data Ck to obtain pre-processed data; s2, calculating an environment equipment personnel index Hsrh according to the preprocessed data; the optimal management control scheme is obtained through calculation of the cross experiment value, the process is simple and efficient, workers can rapidly obtain analysis results of the conference before class, the working efficiency of the conference before class is improved, the complexity can be reduced, rapid learning of the workers is facilitated, the global search ability is high, the convergence speed is high, and the method is suitable for popularization and application. And the accuracy of an analysis result and the working efficiency are greatly improved.
Owner:HUAIBEI MINING CO LTD +1

Intelligent decision support system based on big data

The invention discloses an intelligent decision support system based on big data, which relates to the technical field of decision support systems, and is characterized in that limiting elements are generated based on historical planting scenes, a plurality of parameter spaces are generated by using a random generation tool according to a preset space number, and a loss degree value of each parameter space is calculated through an information function; the loss degree values of all the parameter spaces are substituted into a dynamic screening algorithm for calculation, after part of the parameter spaces are screened out, content randomization operation is carried out on the reserved parameter spaces, space sets are established for all the parameter spaces completing the randomization operation, multiple sets of space sets are output, loss degree value comparison is carried out on the multiple sets of space sets, and the loss degree values of all the parameter spaces are obtained. And selecting the parameter space with the minimum loss degree value as a management scheme of the current planting scene of the enterprise. According to the support system, through dynamic scheme generation and screening, the optimal management scheme can be globally selected to adapt to the current planting scene of an enterprise, the adaptability is high, and the decision making efficiency is improved.
Owner:NANJING YINGFU TECHNOLOGY CO LTD

Construction management system and method for complex construction scene

The invention relates to a construction management system and method for a complex construction scene, and relates to the technical field of construction management, and the system comprises a monitoring module which obtains the construction progress and construction monitoring information of the construction scene in real time, and a digital twinborn model recognition module which builds a three-dimensional digital twinborn model and determines the risk recognition result of equipment and personnel; the decision module determines a plurality of initial management strategies based on the risk identification result and a pre-constructed construction safety knowledge graph; and based on the construction progress, the construction plan, the environment information and a preset multi-objective optimization algorithm, optimizing the plurality of initial management strategies, determining an optimal management strategy, and sending the optimal management strategy to a corresponding management terminal in the optimal management strategy. The method has the effects of effectively identifying the construction risk, optimizing the management strategy, guaranteeing the construction safety and improving the construction efficiency.
Owner:BEIJING TAIHE ZONGHENG TECH CO LTD

A power distribution network diagram data intelligent management system

This invention discloses an intelligent management system for distribution network diagram and model data, belonging to the field of distribution network diagram and model data management technology. It includes an application analysis module, an optimization analysis module, and an optimization management module. The application analysis module performs application analysis on the diagram and model data to determine optimization items, which are data items requiring optimization of diagram and model data transmission. The optimization analysis module performs optimization analysis on the optimization items, obtains diagram and model flow association data for each optimization item, generates a diagram and model flow information diagram for each optimization item based on the association data, identifies the transmission items present in each optimization item based on the flow information diagram, determines the baseline optimization method for each transmission item, determines the evaluation order of each transmission item based on the baseline optimization method, performs optimization analysis based on the evaluation order, and forms an optimization combination curve. The optimization management module manages the optimization items for each diagram and model.
Owner:STATE GRID ANHUI ELECTRIC POWER CO LTD FEIXI POWER SUPPLY CO

Distributed power supply grid-connected optimization management system and control method thereof

The invention discloses a distributed power supply grid-connected optimization management system and a control method thereof, and belongs to the technical field of distributed power supply grid-connected management, and the control method comprises the steps: judging the operation state of distributed power supply equipment according to natural microenvironment data and operation state data in real time, and when the distributed power supply equipment is judged to be abnormal, executing the operation of the distributed power supply equipment; and issuing a control instruction of equipment shutdown to the distributed interface equipment in the region, predicting the output state of each region based on the operation state judgment result of the distributed power supply equipment in the region, and comprehensively considering the power market transaction and power selling market conditions. And the output state of the distributed power supply equipment in each region is coordinated and distributed based on the overall optimization target, so that the whole distributed power supply grid-connected optimization management system achieves optimal scheduling. According to the method, the comprehensive effect of multiple influence factors can be comprehensively considered, the operation state of the equipment can be accurately judged in a complex operation environment, and then the optimal management strategy is formulated according to different conditions.
Owner:WUHAN UNIV

A distributed energy optimization management method and system for rapidly deploying a mobile shelter hospital

This invention provides a distributed energy optimization management method and system for rapidly deploying mobile makeshift hospitals. In this embodiment, the invention dynamically adjusts energy allocation by constructing a multi-layered virtual energy network model for the mobile makeshift hospital; it uses time series forecasting technology to predict energy consumption demand and power generation potential, generating an energy supply and demand balance plan; it introduces a multi-objective optimization algorithm to intelligently schedule the charging and discharging process of the energy storage system, obtaining the optimal charging and discharging plan; it collects and analyzes the operating data of the distributed energy system at preset time nodes, uses a machine learning model to predict fault risks from the operating data, and optimizes the optimal energy allocation strategy and multi-objective optimization algorithm based on the results, forming an adaptive and self-learning energy closed-loop management system. The technical solution provided by this invention enables dynamic optimization management of energy in mobile makeshift hospitals, ensuring efficient, flexible, and adaptive energy allocation and scheduling, and improving the overall performance and reliability of the system.
Owner:CSSC HAISHEN MEDICAL TECH CO LTD

A method, system, device and medium for optimizing and managing the energy of a microgrid

A method, system, device and medium for microgrid energy optimization management proposed by an embodiment of the present application relate to the technical field of power system automation. The method includes: dividing the management stage to obtain a day-ahead robust energy optimization management stage and an intra-day real-time rolling energy optimization management stage; establishing a day-ahead robust energy optimization management model and an intra-day real-time rolling energy optimization management model; obtaining first operation data of the microgrid; solving the day-ahead robust energy optimization management model according to the first operation data to obtain a day-ahead robust energy optimization management strategy; obtaining second operation data of the microgrid; solving the intra-day real-time rolling energy optimization management model according to the day-ahead robust energy optimization management strategy and the second operation data to obtain a target microgrid energy optimization management strategy. The embodiment of the present application improves the reliability of energy optimization management.
Owner:SOUTHERN UNIVERSITY OF SCIENCE AND TECHNOLOGY

Building construction management method based on BIM

The invention discloses a BIM-based building construction management method, and relates to the technical field of BIM, and the method comprises the steps: obtaining a BIM model of a target building, carrying out the key region extraction, and obtaining a plurality of key region integration levels; extracting BIM parameters of each key area, and performing construction error analysis to obtain a plurality of construction error parameters; sorting the key region set, and performing error conduction analysis to obtain a first conduction error parameter; according to the first conduction error parameter and the first key area integration level, management standard optimization of the first key area is carried out, a first optimal management standard is obtained, multiple optimal management standards of the multiple key areas are obtained through processing, and construction management is carried out. The problem that existing building construction management is lack of accuracy and high efficiency is solved.
Owner:AVIC CONSTR GRP CO LTD

system

We provide the system. [Solution] A means of analyzing past information and automatically generating the optimal document, A means of providing immediate solutions based on past cases of troubleshooting, A means to visualize the technology and knowledge within an organization and automatically identify the appropriate consultant, A means of improving operational efficiency in facility management by analyzing past management cases and proposing the optimal management strategy, A system that includes this.
Owner:SOFTBANK GROUP CORP

Optimal management method for ship grouping joint hydraulic reclamation construction

The invention discloses an optimal management method for combined hydraulic reclamation construction of a ship group. The method comprises the following steps: acquiring resource configuration parameters of combined construction of multiple types of ships and sea condition grades in a planned construction period; constructing an objective function and a joint scheduling constraint expression for maximizing the hydraulic reclamation efficiency in unit time under the ideal sea condition; calculating the maximum theoretical construction efficiency and the construction management coefficient of the construction site; constructing an objective function for maximizing the construction efficiency under the adverse sea condition and a sea condition change combined constraint expression; determining the maximum expected construction efficiency and a construction management coefficient based on the estimated probability of occurrence of different levels of sea conditions; and pre-evaluating the construction scheme, and formulating and optimizing a dynamic adjustment strategy of the construction management coefficient. The invention provides the optimal management method for combined hydraulic reclamation construction of the ship group, so that the construction efficiency is greatly improved, the operation cost and time waste caused by improper management are reduced, and the high-efficiency, controllable and high-quality completion of a project on schedule is ensured.
Owner:CCCC GUANGZHOU DREDGING CO LTD +1

Fuzzy hierarchical simulation-optimization-evaluation method for best management practices of non-point source pollution

PendingCN122636364AFuzzy decisionFuzzy expected value
The application discloses a fuzzy hierarchical simulation-optimization-evaluation method for optimal management measures of non-point source pollution. The method builds a double-level intelligent algorithm model containing environmental and economic targets and corresponding constraint conditions, and couples with a hydrological model to form a hierarchical simulation-optimization algorithm. In the optimization calculation, the fuzzy expected value and fuzzy reliability are used to handle uncertainty, and the hierarchical iteration linkage optimization of sub-basins and whole basins is executed to obtain the Pareto optimal solution of the optimal management measure space configuration scheme. Then, the scheme attribute value is extracted to build a fuzzy decision matrix, the weight is calculated by combining the fuzzy maximum deviation method, and the relative closeness of each scheme is calculated by the fuzzy TOPSIS, and the optimal configuration scheme is output. The application solves the problems of long time consumption of dynamic link formed by existing effect simulation and spatial optimization of optimal management measures, and the problems of insufficient uncertainty processing, and improves the efficiency and comprehensive benefits of scientific control of basin non-point source pollution.
Owner:JIANGXI NORMAL UNIV

A motor control management system

The present invention belongs to the technical field of motor management, and discloses a motor control and management system; the present invention comprises: collecting historical motor comprehensive data, pre-processing the historical motor comprehensive data, and obtaining fused feature data; clustering and grouping the motors based on the fused feature data, and obtaining n motor groups; establishing a grid model of the motors, updating the states of the motors in each motor group according to the grid model, and simulating and obtaining the aging curve and failure rate of the corresponding motors within a preset time; determining the optimal management path for each motor group based on the aging curve and failure rate of the motors within the preset time using a path planning algorithm, and executing the optimal management path to perform patrol management on the motors in each motor group; the optimal management path can be planned, so that management resources are reasonably allocated and utilized, ensuring timely maintenance, thereby extending the service life of the motors and reducing operation and maintenance costs.
Owner:GUANGDONG INST OF SCI & TECH

Face anti-aging optimization management system and method

The invention relates to the technical field of medical cosmetology, in particular to an optimal management system and method for facial anti-aging. The method comprises the following steps: acquiring a facial three-dimensional model and a dynamic expression video, extracting a strain field and identifying high and low dynamic strain areas; after the face finite element mechanical model is established, an initial filling scheme is generated through topological optimization with the maximum supporting rigidity and the limitation of the total amount of materials as constraints; implanting the scheme into the model, performing dynamic mechanical simulation, and iteratively correcting the mechanical constraint according to a simulation result until the dynamic state is natural; and finally, receiving an adjustment instruction through a human-computer interaction interface, converting the adjustment instruction into an optimization parameter, and guiding to generate a final injection plan. According to the technical scheme, collaborative optimization and fixed-point and fixed-position layered design of the skin phase, the meat phase and the bone phase are achieved, the problems that the face is loose, vertical, fat and concave are comprehensively solved, the treatment has the three-dimensional supporting effect and the dynamic natural effect, the minimally invasive biotechnology concept is met, treatment without the recovery period can be achieved, the effects of wrinkle removing, aging resisting, tightening and lifting are finally achieved, and a user is assisted to achieve the young face state.
Owner:FUZHOU BEIZILAN NETWORK TECHNOLOGY CO LTD

A method, system, device, and medium for processing energy optimization management models.

This application proposes a method, system, device, and medium for processing energy optimization management models, relating to the field of power system automation technology. The method includes: obtaining an initial energy optimization management model of a microgrid cluster; determining dual variables based on decision variables, with the dual variables used for transmission between sub-microgrids; performing distributed processing on the initial energy optimization management model based on the dual variables to obtain a distributed energy optimization management model; obtaining consistency constraints during the iterative calculation process; obtaining data communication volume between sub-microgrids; applying communication constraints to the dual variables based on the data communication volume to obtain communication conditions for the dual variables; and iteratively calculating the distributed energy optimization management model based on the consistency constraints and the communication conditions for the dual variables to obtain a target optimization management strategy. This application can solve the energy optimization management model of a microgrid cluster and reduce the external communication of internal characteristic information of sub-microgrids.
Owner:SOUTHERN UNIVERSITY OF SCIENCE AND TECHNOLOGY