Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

149 results about "Risk quantification" patented technology

Risk quantification. Attaching a probability to the happening of a negative event. If it is certain that an event cannot occur, it is given a probability of 0; if it is certain that it will occur, it is given a probability of 1. Uncertain risks are assigned between 0 and 1. Maximum risk at maximum uncertainty occurs when its probability is 0.5.

Virtual power plant combined heat and power scheduling robust optimization model

The invention provides a virtual power plant combined heat and power scheduling robust optimization model. A model aggregation unit comprises a distributed generating set, a wind turbine generator set, a photovoltaic set, a combined heat and power (CHP) set, a boiler, electric energy storage, heat energy storage, an electric load and a heat load. Participation of the CHP set in the SRM (Spinning Reserve Market) situation is considered. Aiming at the facing uncertain problem of a virtual power plant (VPP) and resulting risks, robust optimization (RO) is utilized to process uncertainty of the EM electricity price, the SRM electricity price, the wind power capacity, the photovoltaic capacity, the electric load and the heat load, and risk quantification indexes are established, and thus robustness and economical efficiency of a RO model are balanced. The model provided by the invention well solves the existing combined heat and power scheduling optimization model establishment problem of the VPP when participating EM and SRM at the same time, and improves flexibility of decision making, and thus the profit of the VPP is increased. Meanwhile, the introduction of the RO model effectively reduces system risks, and thus the effective reference is provided for a decision maker to select a proper robust factor.
Owner:HOHAI UNIV

Adaptive pattern recognition for psychosis risk modelling

The present invention relates to a method and a system for an adaptive pattern recognition for psychosis risk modeling with at least the following steps and features: automatically generating a first risk quantification or classification system on the basis of brain images and data mining; automatically generating a second risk quantification or classification system on the basis of genomic and / or metabolomic information and data mining and further processing the first and second risk quantification or classification systems by data mining computing so as to create a meta-level risk quantification data to automatically quantify psychosis risk at the single-subject level. Preferably the first and / or second risk quantification or classification system(s) extract specific surrogate markers by multi-modal data acquisition and / or the surrogate markers are categorized and / or quantified by a multi-axial scoring system. Data can be controlled and outliers can be detected and eliminated preferably by determining cut-off thresholds. More preferably an outlier detection method transfers the brain image into a calibrated image, a segmented image and / or a registered image. Uni-modal data can be further generated and optionally optimized on the basis of the data acquired and one or more similarity and / or dissimilarity between the multi-modal data and the uni-modal data can be quantified.
Owner:KOUTSOULERIS NIKOLAOS +1

Driver relative risk evaluation method based on benchmark analysis

The invention provides a driver relative risk evaluation method based on benchmark analysis. The driver relative risk evaluation method includes the steps: by installing a GPS data collector on a motor vehicle, obtaining natural driving behavior data of a driver; based on the vehicle operation parameters, extracting key events, and determining dangerous driving behaviors of a driver; classifying the driving behaviors with different danger degrees by adopting a clustering analysis method; and calculating comprehensive risk indexes of the individual drivers relative to other drivers by utilizinga benchmark analysis method, and meanwhile, obtaining dangerous driving behavior weight distribution reflecting individual differences of the drivers. According to the driver relative risk evaluationmethod, the traditional absolute risk is replaced by the relative risk of the driver, so that the absolute risk quantification of various dangerous driving behaviors is avoided. Relative risk evaluation is carried out on dynamic driving behaviors of individual drivers, and technical support can be provided for safe driving intelligent reminding and feedback of the drivers, personalized insuranceevaluation based on the driving behaviors and road traffic safety management.
Owner:SOUTHEAST UNIV

Information system security risk assessment method and device

ActiveCN103996006ASolve the core problem of risk quantificationHigh precisionPlatform integrity maintainanceRisk quantificationMulti dimensional
The invention discloses an information system security risk assessment method. The method includes the steps of constructing a threatening behavior model bank, matching calling behaviors recorded in an information system with threatening behaviors in the threatening behavior model bank to obtain decision values of the matched calling behaviors, determining weighted values of the threatening behaviors according to the decision values of the matched calling behaviors, and enabling the weighted values of the threatening behaviors to be combined with a vulnerability weighted value and a remedial measure weighted value to obtain a risk grade. The invention further discloses an information system security risk assessment device. Through the scheme of the information system security risk assessment method and device, security risks of the information system can be measured in multi-dimensional mode, the defects of existing risk evaluation quantification are greatly made up for, the accuracy and credibility of threat evaluation are improved, and the core problem of risk quantification of the information system can be solved; consequently, users can conveniently and objectively know the condition of running risks of the information system, and the risks of the information system can be perceived.
Owner:SHANXI CHINA MOBILE COMM CORP

Security gateway based on intelligent behavior analysis, and security protection system

The invention discloses a security gateway based on intelligent behavior analysis, comprising: a traffic parameter extraction function module for calculating a user network traffic behavior mode parameter through real-time sampling; a user behavior intelligent analysis module; and an application intelligent identification and traffic management and control function module for performing intelligent protocol identification on a mainstream application protocol based on the user behavior intelligent analysis module. The invention further discloses a security protection system, comprising: an intelligent cloud security center, and a security gateway; the centers of the intelligent cloud security center and the security gateway are linked in real time, the security gateway transmits the extracted user network traffic behavior mode parameter in the network to the intelligent cloud security center and executes a defense instruction issued by the intelligent cloud security center in real time,and the intelligent cloud security center performs deep learning and security analysis on the traffic behavior mode parameter, generates the defense instruction based on a risk quantification resultof an abnormal behavior and issues the defense instruction to the security gateway. The security gateway disclosed by the invention is applicable to the security detection of most network traffic, andcan achieve an accuracy rate of more than 80% in actual network test.
Owner:北京华清信安科技有限公司

Communication equipment spare part configuration method based on risk quantification control

ActiveCN107194571AAccurate configurationPrecisely control the risks takenResourcesLogisticsLower limitRisk quantification
The invention discloses a communication equipment spare part configuration method based on risk quantification control. The method comprises the following steps of S1, according to an experience value, setting an upper limit value and a lower limit value of a probability P(T) of a same model equipment usage quantity which exceeds a spare part stock quantity in a risk assessment period T which can be borne by an existing network; S2, calculating an upper limit value and a lower limit value of a spare part stock quantity m of same model equipment; and S3, according to the upper limit value and the lower limit value of the spare part stock quantity m of the same model equipment, configuring an actual spare part stock quantity of the same model equipment, wherein the upper limit value and the lower limit value are calculated in the S2. In the invention, according to a risk which can be borne by existing network operation, a required spare part warehouse quantity is accurately configured. According the spare part stock quantity of the same model equipment, a probability of the spare part usage quantity exceeding the spare part stock quantity of the same model equipment is calculated so that a risk condition of a current spare part stock quantity is assessed and corresponding changes and adjustments are performed.
Owner:WUHAN FIBERHOME TECHNICAL SERVICES CO LTD

Risk identification method and device based on transaction behaviors of electricity selling enterprises in electricity market, and storage equipment

The invention provides a risk identification method and device based on transaction behaviors of electricity selling enterprises in an electricity market, and storage equipment, and aims to carry out risk judgment. Complete transaction behaviors are decomposed into a risk module for calculation, a calculation result is compared with a final result of an actual transaction, then a user puts in new transaction information, a default risk evaluation result of an electricity selling enterprise is calculated, and the result is compared with user margin; and in the transaction process, new transaction information is continuously imbedded, and the transaction is automatically suspended when the risk evaluation result is higher than the margin of the user. According to the technical scheme, the risk quantification total value for the transaction behavior of the electricity selling enterprise is obtained in a two-dimensional accumulation mode, the risk quantification total value is finally expressed in the form of the actual amount, and comparison is carried out with the actual margin according to the calculated value. The setting range of the margin is confirmed very scientifically.
Owner:浙江电力交易中心有限公司 +1

Satellite network coordination risk quantification assessment method and system

The present invention provides a satellite network coordination risk quantification assessment method and system. The method comprises: receiving a frequency track assessment demand input by a user to generate a risk assessment task; obtaining basic data of a pre-stored satellite application environment and a satellite network coordination environment; screening the basic data according to the frequency track assessment demand to obtain the basic data participating in assessment; receiving external data input by the user according to an electromagnetic compatibility environment to complete the basic data participating in assessment; receiving an assessment index system through user input configuration; and according to the completed assessment index system and the basic data participating in assessment, constructing a flexible assessment model to perform assessment of dynamically arranged flexible assessment index system, integrate the assessment value of each assessment index and calculate and obtain a total assessment result. The satellite network coordination risk quantification assessment method and system can perform quantification assessment of the satellite network coordination risk to obtain a frequency track scheme having competitiveness so as to improve the efficiency of satellite network frequency track report and coordination.
Owner:AEROSPACE INFORMATION RES INST CAS

Substation operation risk assessment method considering time-varying state of electrical main equipment

ActiveCN112116276AState assessment results are reliableAccurately reflect the size of the riskResourcesInformation technology support systemRisk quantificationTransformer
The invention provides a substation operation risk assessment method considering the time-varying state of electrical main equipment, and the method comprises the steps: obtaining the state score of each part in the electrical main equipment according to the layering and grading of a fault tree, determining the weight coefficient of each part through an analytic hierarchy process, and solving thefuzzy comprehensive evaluation result of each electrical main equipment, carrying out electrical main equipment state classification; considering the influence of the state of the electrical main equipment and the weather condition on the fault probability, solving the fault probability of the electrical main equipment in the current time period; by adopting a Monte Carlo method, determining the normal operation or fault shutdown state of the main equipment, and evaluating the short-time operation risk index of the transformer substation by taking the connectivity between the power inlet wireof the transformer substation and a load point as a risk quantification index; and if the short-time operation risk index of the transformer substation meets the preset condition, sending early warning information. According to the method, preventive measures can be taken in advance, the influence of accidental faults and weather disasters on the transformer substation is reduced, and the operation reliability level of the transformer substation is improved.
Owner:GUANGZHOU POWER SUPPLY BUREAU GUANGDONG POWER GRID CO LTD

Safety production early warning system and method thereof

The invention discloses a safety production early warning system and method. The system comprises a production equipment measurement module, a safety equipment monitoring module, a processing analysis module, an evaluation index module, a risk model database, an early warning information platform and a monitoring room. According to the scheme, the data and the image of the equipment during normal production are pre-stored in the risk model database, and the score of the equipment is preset according to the importance degree of the equipment, so that the real-time data and the image in actual safety production can be conveniently compared and analyzed, and the operation conditions of the production line and each piece of equipment can be timely judged; therefore, timely alarm and early warning of different degrees can be made, and a powerful guarantee is provided for safe production. Meanwhile, according to the scheme, the risk factors in the actual safety production process can be subjected to identification analysis, risk quantification and risk alarm prompting through the safety production early warning system, and in this way, type identification and grade quantification processing can be conducted on the actual risk factors.
Owner:PANZHIHUA GANGCHENG GRP MIYI RUIDI MINING

Power grid dispatching operation process risk auxiliary pre-control system

ActiveCN105184490AIntelligent scheduling operation process risk quantification functionIntuitive reflectionResourcesInformation technology support systemRisk levelRisk quantification
The invention discloses a power grid dispatching operation process risk auxiliary pre-control system which comprises a man-machine interaction module, a core computing module and a database module. The core computing module is connected with the man-machine interaction module, the database module and an external system. The database module is connected with the external system. The core computing modules comprises a risk assessment module and a risk practical module. The risk assessment module further comprises a risk assessment auxiliary module and a risk computing module. The risk assessment auxiliary module further comprises an interface management module, an individual order operation sequence generation module and a power grid risk status generation module. The risk assessment module further comprises a risk quantification module and a risk level classification module. According to the invention, intelligent dispatching process risk quantification is realized; and based on risk quantification values, dispatching bill risk verification, dispatching simulation billing risk assessment rehearsal, optimum dispatching time selecting, optimal dispatching scheme selecting and other risk auxiliary pre-control functions are realized.
Owner:ELECTRIC POWER SCHEDULING CONTROL CENT OF GUIZHOU POWER GRID CO LTD +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products