The invention discloses a dispatching optimization method and
system for a mine micro-grid, and relates to the technical field of micro-grids. The method comprises the steps of constructing a
system model of the mining area comprehensive
energy system; a mining area comprehensive energy
operation model is constructed based on the
system model, and constraint functions of the mining area comprehensive energy
operation model comprise a net income maximization function, a
renewable energy consumption maximization function and a carbon emission minimization function; the model is converted into a Markov
decision process for determining a scheduling strategy for performing day-ahead scheduling control on the mining area
integrated energy system, and the scheduling strategy comprises an output power range and an
equipment state of each equipment in a day-ahead scheduling period; and under the limitation of the agreed range of the scheduling strategy and the constraint condition of the mining area comprehensive energy
operation model, with the purpose of minimizing the operation cost, performing intra-day scheduling control by adopting mixed integer
linear programming. Therefore, the problem that a scheduling optimization method in the prior art cannot be applied to the mine micro-grid or has many defects during application is solved.