Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

17618 results about "Power capacity" patented technology

Power capacity is how much energy is stored in the battery. This power is often expressed in Watt-hours (the symbol Wh). A Watt-hour is the voltage (V) that the battery provides multiplied by how much current (Amps) the battery can provide for some amount of time (generally in hours).

Lithium battery electric quantity monitoring and low electric quantity early warning system

The invention discloses a lithium battery electric quantity monitoring and low electric quantity early warning system, and relates to the technical field of battery management, SOC estimation is carried out through an electric quantity depth mapping algorithm in combination with battery chemical characteristics and a working environment, the SOC estimation precision is improved, and the risk that equipment suddenly stops working due to inaccurate electric quantity display is reduced; a user behavior mode is learned through a self-adaptive user behavior recognition and optimization algorithm, and parameters and an early warning threshold value of an SOC estimation model are adjusted according to a learning result, so that the intelligent level of the early warning system is improved; the SOC estimation and state monitoring module is used for monitoring the health state of the battery, the early warning threshold value is adjusted according to the actual state of the battery, the accuracy of early warning is improved, in addition, the user behavior learning module dynamically adjusts the alarm threshold value according to the use habit of a user, and the practicability and effectiveness of early warning are improved; according to the invention, the monitoring accuracy of the existing lithium battery electric quantity monitoring and low electric quantity early warning system is greatly improved.
Owner:HENAN JINZHONG PHOTOELECTRIC TECH CO LTD

Storage battery abnormity early warning system based on intelligent battery gateway

The invention discloses a storage battery abnormity early warning system based on an intelligent battery gateway, and relates to the technical field of battery monitoring. The system comprises a sensor module used for collecting voltage, internal resistance, temperature, thermal runaway state and floating charge voltage parameters of a single battery in real time; the intelligent battery gateway comprises a data processing module and an early warning module, and the data processing module carries out fusion analysis on sensor data through an intelligent algorithm, calculates the battery remaining capacity SOC and the state of health SOH and executes an intelligent equalization strategy; and the early warning module generates a multi-stage early warning signal according to the parameter threshold and the anomaly detection model. According to the invention, through a multi-dimensional fusion sensing technology and a dual-drive intelligent algorithm, the aging sign of the internal microstructure of the battery is accurately captured, and high-precision estimation of the residual electric quantity and the health state of the storage battery is realized; and in the aspect of early warning performance, a multi-dimensional linkage detection model and an intelligent early warning mechanism are established, so that the accuracy and timeliness of fault early warning are effectively improved, and the early warning time is greatly advanced.
Owner:SHANDONG DAWO INTELLIGENT TECHNOLOGY CO LTD

Optical storage and charging energy allocation system based on data driving and control method

The invention discloses a light storage and charging energy allocation system based on data driving and a control method, and relates to the technical field of light storage and charging energy allocation, and the method comprises the following steps: carrying out the real-time collection of the real-time power generation amount of a photovoltaic power generation system, the current power state of an energy storage battery, and the power consumption data of a load; and cleaning, normalization processing and time serialization are carried out on the collected data, so that the accuracy and continuity of the input data are ensured. According to the invention, by monitoring the power consumption data of the load in real time, combining with the long-term energy prediction model and dynamically adjusting the energy storage and discharge strategy, excessive discharge in a non-peak period is avoided, sufficient energy storage in a peak period is ensured, the power grid dependence is reduced, and the power consumption cost is reduced. Through load sudden increase detection and an adaptive scheduling algorithm, the system can quickly cope with sudden load changes, preferentially guarantee power supply of key loads, flexibly adjust a discharge mode, improve endurance time and system stability, and maximize green energy utilization efficiency.
Owner:ANHUI ZHICHU NEW ENERGY TECH DEV CO LTD

Lithium battery and charging control method thereof

The invention relates to the technical field of lithium battery charging, in particular to a lithium battery and a charging control method thereof. The method comprises the following steps: acquiring impedance spectrum data of the lithium battery; performing impedance spectrum analysis on the lithium battery impedance spectrum data by using preset lithium battery basic data to obtain lithium battery discharge state data; acquiring historical power consumption data of the lithium battery; performing power consumption model construction on the historical power consumption data of the lithium battery by using a long-short term memory network algorithm to generate a lithium battery power consumption prediction model; obtaining real-time time data; and performing battery power consumption prediction on the real-time time data by using the lithium battery power consumption prediction model to obtain battery utilization rate time period prediction data. According to the invention, the charging efficiency is improved, the service life of the battery is prolonged and safer and more reliable charging experience is provided through user habit-oriented, comprehensive data, real-time intelligent control and personalized strategies.
Owner:HUIZHOU YUNDIAN TECHNOLOGY CO LTD

Electric power and electric quantity balancing method and system

The invention discloses an electric power and electric quantity balancing method and system, and relates to the technical field of electric power management. S2, demand prediction; s3, evaluating the power supply capability; s4, carrying out resource optimization configuration; s5, integrating renewable energy sources; s6, demand side management; s7, performing real-time monitoring and adjustment; and S8, performing performance evaluation and feedback, and constructing an electric power and electric quantity balance system based on the method. According to the electric power and electric quantity balancing method and system, the accuracy and efficiency of electric power and electric quantity balancing can be remarkably improved, various electric power demand changes can be effectively handled, and stable operation of a power grid is ensured. Meanwhile, by dynamically adjusting access and demand side management of renewable energy sources, the purposes of maximum utilization of energy sources, energy conservation and emission reduction are achieved. Finally, through regular performance evaluation and feedback, the system performance is continuously optimized, a closed-loop optimization process is formed, and powerful support is provided for sustainable development of a power system.
Owner:CENT CHINA BRANCH OF STATE GRID CORP OF CHINA

AGV scheduling system optimization method based on dynamic priority adjustment and real-time load balance

The invention discloses an AGV scheduling system optimization method based on dynamic priority adjustment and real-time load balance, and the method comprises the steps: dynamically monitoring the emergency degree and arrival time of cargos, enabling a system to adjust the task priority in real time, guaranteeing the priority processing of emergency cargos, and giving consideration to the scheduling efficiency of common cargos; information such as current positions, loads and electric quantity of the AGVs is collected, weighted load values are calculated, weight factors are dynamically adjusted according to task types, load balance is achieved, and the situation that part of the AGVs are overloaded and part of the AGVs are insufficient in load is avoided; and finally, scheduling optimization is carried out by comprehensively considering factors such as the adaptation degree between the task and the AGV, the path distance, the predicted completion time and the load balance, and the overall performance of the AGV system is fully exerted. The flexibility, efficiency and resource utilization rate of the AGV scheduling system are effectively improved, and the AGV scheduling system is suitable for various scenes such as logistics storage and production and manufacturing.
Owner:ANHUI UNIV

Power supply charging pile fault monitoring system and method based on big data

The invention relates to the technical field of power supply charging piles, in particular to a power supply charging pile fault monitoring system and method based on big data, and the monitoring method comprises the following steps: analyzing the charging power change condition of a charging pile, and obtaining the average fluctuation degree and the average power consumption of the charging pile according to the historical use frequency of the charging pile; analyzing the historical abnormal charging pile, and determining a charging abnormal risk threshold value of the charging pile; according to the change condition of the charging power presented by the charging pile in a plurality of historical charging records, the current normal fluctuation range of the charging power of the charging pile is obtained; using priorities of the charging piles are obtained through analysis, and a using recommendation sequence of the charging piles selected by the user is generated; when a user uses the charging pile to charge a vehicle, the running state of the charging pile is monitored in real time, and whether abnormal marking is conducted on the charging pile or not is judged; and scheduling the power transmission line for the adjacent charging pile, and judging whether to send an abnormal prompt to the vehicle or not.
Owner:WUHAN SHENJIE TECH CORP LTD +1

New energy charging management method for smart city

The invention relates to the field of new energy charging, in particular to a new energy charging management method for a smart city. The method comprises the steps that a municipal vehicle operation feature data set is acquired, on the basis, municipal vehicles are subjected to type division through a vehicle type classification strategy, and a municipal vehicle driving type set is determined; acquiring a municipal vehicle task set, and on the basis, tracking a dynamic task variable set of a task execution vehicle in a municipal vehicle driving type set in a task execution process; according to the dynamic task variable set, analyzing an association relationship between the dynamic task variable set and the real-time power consumption data through a multi-modal fusion strategy, and determining dynamic power change information; and acquiring a charging station information set, dynamically optimizing a charging decision in combination with the municipal vehicle task set and the dynamic electric quantity change information, and determining and outputting an optimal charging strategy. In the municipal vehicle charging decision-making process, the utilization rate of charging resources is improved, and the continuity of municipal task execution is ensured.
Owner:GANZHOU DIGITAL IND GROUP CO LTD

Calculation method and device for multi-scale electric-carbon energy efficiency optimization calculation method and device for power system

The present application discloses a calculation method for multi-scale electric-carbon energy efficiency optimization for a power system, which includes designing a carbon flow calculation improvement model of the power system that takes into account a photovoltaic cluster auxiliary service, converting a power lossy transmission network of the power system equivalent to a lossless power consumption network, and calculating a carbon flow of the power system that takes into account a photovoltaic reactive power cluster auxiliary service; designing a decision-making system for low-carbon operation of the power system based on a coupling of electric-carbon energy efficiency, and calculating a correlation between electric quantity and the carbon flow of the power system that takes into account the photovoltaic cluster auxiliary service; the output varies in the range of 0-1, larger values represent a stronger correlation between electric-carbon energy efficiency.
Owner:ANHUI SCI & TECH UNIV +2

Multi-terminal linkage energy scheduling method and apparatus

The present application relates to a multi-terminal linkage energy scheduling method and apparatus. The method comprises: acquiring multi-terminal data, wherein the multi-terminal data comprises power supply side data, power grid side data, load side data, and energy storage side data; on the basis of the acquired multi-terminal data, predicting multi-terminal electricity amount related information within a future preset time period by means of a prediction algorithm, wherein the multi-terminal electricity amount related information comprises photovoltaic power generation related information, power grid power generation related information, power consumption information of a load side device, and electricity charging and discharging related information of an energy storage device; on the basis of an energy efficiency target, acquiring energy regulation information by means of the multi-terminal electricity amount related information; and controlling the energy storage device and / or the load side device on the basis of the energy regulation information. According to the solution of the present application, by means of a multi-party linkage mechanism, a scheduling plan formed on the basis of a preset scheduling target is more suitable for actual requirements and more accurate, and the energy storage device and the load side device can be automatically controlled on the basis of the scheduling plan.
Owner:HANGZHOU YIXING INTELLIGENT TECHNOLOGY CO LTD

Battery health state prediction method and device, detection assembly and vehicle

The invention discloses a battery health state prediction method and device, a detection assembly and a vehicle, and belongs to the technical field of new energy. The method comprises the following steps: acquiring a plurality of time-varying expansive force values and residual electric quantity of a to-be-detected battery in a single charging process; and under the condition that the difference between the second residual electric quantity at the end of charging and the first residual electric quantity at the start of charging is greater than the preset charging depth, determining at least two expansive force extreme values and the residual electric quantity corresponding to the sampling time of each expansive force extreme value. The expansion force extreme value corresponds to a key feature point in a single charging process, and the health degree of the battery can be reflected by combining the synchronous residual electric quantity. According to the method, the at least two expansive force extreme values and the corresponding residual electric quantities are input into the preset prediction model, the correlation between the independent variable (expansive force extreme value) and the dependent variable (health state information) is subjected to regression analysis through the preset prediction model, the health state information is predicted, and the accuracy of the health state of the battery is improved.
Owner:TACSENSE TECH (SHENZHEN) CO LTD

Drainage basin cascade water, wind, light and storage integrated dispatching operation simulation method considering long-short term nesting correction

ActiveCN119231491ASatisfy refinement requirementsAc network load balancingResourcesNew energyEngineering
The invention provides a watershed cascade water, wind, light and storage integrated scheduling operation simulation method considering long-short term nesting correction, and the method comprises the steps: constructing a watershed cascade water, wind, light and storage integrated medium-long term optimization scheduling model, and solving the model, thereby obtaining a water, wind, light and medium-long term scale electric quantity complementation scheduling scheme; and constructing a long-short-term nested correction model, and performing refined correction on each power supply output process of the watershed cascade water, wind, light and storage integrated multi-energy complementary base to obtain a water, wind, light and short-term scale electric power complementary scheduling scheme. On the basis of medium and long term optimization scheduling, a long-short term nested correction model is further constructed, and the random volatility of short-term wind and light output and the adjusting capacity of a short-term hydropower station and a pumped storage power station are fully considered. Effective undertaking of long-term absorption and short-term grid connection of the water, wind, light and storage integrated multi-energy complementary base under high-proportion new energy permeation is achieved, and the refined requirement of a multi-energy complementary dispatching system for evaluating indexes such as the new energy absorption rate is met.
Owner:CHINA RENEWABLE ENERGY ENG INST +4

Distributed BMS battery active equalization type safety management method and system

The invention provides a distributed BMS battery active equalization type safety management method and system, and the method comprises the steps: obtaining the state information and performance change trend corresponding to each single battery through real-time monitoring, constructing a target battery pack topological structure model, combining a reinforcement learning algorithm, generating an intelligent agent model, and employing the intelligent agent model and a fuzzy logic controller to achieve the active equalization type safety management of a battery pack. Determining an energy flow management scheme; based on the feedback data and historical data of the energy flow management scheme, using a deep belief network to construct an anomaly detection model, based on the anomaly detection model, generating a risk assessment report, and constructing a security record platform based on the block chain technology to obtain security record information; optimizing each model parameter based on the risk assessment report and the security record information, and generating a security management system in combination with a transfer learning algorithm and a quantum computing method; and high-precision monitoring, intelligent electric quantity balance regulation and control, anomaly detection, risk management and continuous optimization of the distributed BMS battery system are realized.
Owner:ZHEJIANG NANPAI NEW ENERGY TECHNOLOGY CO LTD

SOC estimation method and system of lithium battery pack

The invention relates to the technical field of SOC estimation, in particular to an SOC estimation method and system for a lithium battery pack. The method comprises the following steps: collecting basic parameters and voltage data of a lithium battery pack, generating steady-state voltage data by using singular value decomposition and time domain reconstruction, further performing multi-level feature mapping and performance reconstruction to obtain basic discharge data, calculating battery energy efficiency and deducing normal power consumption based on the data, and calculating the energy efficiency of the lithium battery pack. Discharging simulation is carried out to evaluate the temperature rise condition, discharging capacity attenuation is predicted in combination with working environment parameters, relative errors are calculated, finally, the charge state is corrected, electric quantity self-calibration is carried out, and intelligent state estimation of the lithium battery pack is achieved. According to the invention, a more efficient SOC estimation method is realized.
Owner:DONGGUAN AIYANG POWER NEW ENERGY CO LTD

Comprehensive energy control method and device for micro-grid system fusing electricity, hydrogen and ammonia

The invention discloses a comprehensive energy control method and device for a micro-grid system fusing electricity, hydrogen and ammonia, and the micro-grid system comprises a DC bus, an energy router, a photovoltaic power generation system, a hydrogen fuel cell system, an electrochemical energy storage system, and a new energy load composed of a water electrolysis hydrogen production system, an ammonia cracking hydrogen production system and a hydrogen storage system. The direct-current bus is connected with an external alternating-current bus through an energy router, and the ammonia cracking hydrogen production system and the hydrogen storage system are connected with the external alternating-current bus; the method comprises the following steps: acquiring an actual output curve of a photovoltaic power generation system in a current measurement period and planned output power of a new energy load at a current moment to determine an electric quantity deviation; when the electric quantity deviation is less than zero, performing discharge control on the micro-grid system by using first planned output power determined according to an actual output curve; and when the electric quantity deviation is greater than zero, carrying out charging control on the micro-grid system by utilizing the planned output power. The output stability of the photovoltaic power generation system can be improved.
Owner:FOSHAN XIANHU LAB

Distributed energy access-oriented intelligent electric meter multi-device collaborative optimization method, device, equipment and medium

The invention provides a distributed energy access-oriented intelligent electric meter multi-device collaborative optimization method and device, equipment and a medium, and the method comprises the steps: carrying out the interpolation of a unified electric meter, an inverter and energy storage data granularity, building a joint time error model, obtaining calibration reference data, and completing the multi-device time synchronization calibration; based on the reference data, acquiring operation data of three devices, and using a joint energy consumption model to distinguish electric meter hardware faults and multi-device collaborative anomalies to complete fault diagnosis; calculating local line loss by combining an inverter-to-ammeter line and electric quantity data, verifying residual electricity metering deviation, and tracing and correcting settlement data to complete line loss-bidirectional metering linkage verification; associating the fault result with the corresponding relation between the long-term statistical fault type of the metering data and the deviation rate and the line loss to establish a model to predict deviation trend early warning; and determining a multi-device cooperative abnormal source and transformer area load interference relation, calculating an interference coefficient, feeding back a scheduling system, and marking a line reconstruction priority. By adopting the method, the distributed energy consumption efficiency and the operation reliability of the power distribution network are improved.
Owner:NANJING NENGRUI AUTOMATION EQUIP

Peripheral device power

In one example in accordance with the present disclosure, an electronic device is described. An example electronic device includes a processor, a port to receive a connector of a peripheral device, and a power supply. An example power supply is to supply power to the processor and the peripheral device when connected to the electronic device. The example electronic device also includes an electronic device controller. The electronic device controller is to alter an amount of power from a first value to a second value to supply to the peripheral device based on an amount of power available from the power supply and a lower threshold power level that enables data communication from the peripheral device. The example electronic device also includes a power delivery controller. The power delivery controller is to provide the amount of power having the second value to the peripheral device based on an output from the electronic device controller.
Owner:HEWLETT PACKARD DEVELOPMENT COMPANY LP

Gas generator and energy storage battery hybrid energy supply scheduling strategy

The invention discloses a gas generator and energy storage battery hybrid energy supply scheduling strategy, belongs to the technical field of storage and charging, and mainly solves the problems that in an energy supply mode of a gas generator in existing oil and gas drilling operation, the power generation efficiency of the gas generator is low, and the gas generator is prone to flameout when coping with an impact load. Measuring and acquiring data of voltage and current of oil and gas drilling operation energy consumption equipment, the starting number of gas generators and the residual electric quantity of an energy storage battery; 2, calculating the real-time total power, the power abrupt change rate and the load rate of the gas generator according to the measured data; 3, the number of gas generators needing to be started and the charging and discharging state of energy storage electricity are determined according to the calculation and analysis result; and 4, repeating the steps 1-3 until the drilling operation is finished. The scheduling strategy depends on an existing energy management system, the starting number of the gas generators and the charging and discharging states of the energy storage batteries are reasonably controlled by combining the total power fluctuation characteristics of oil and gas drilling operation, comprehensive management of hybrid energy supply of the gas generators and the energy storage batteries in the oil and gas drilling operation is achieved, the power generation efficiency of the gas generators is improved, and the energy consumption is reduced. Meanwhile, flameout of the gas generator is avoided, and operation safety is guaranteed.
Owner:CHENGDU TECH UNIV

Optimization control method and system for electric power quantity

The invention relates to the technical field of power grid inspection, in particular to a power quantity optimization control method and system. The method comprises the following steps: performing inspection object collection on a target power grid to obtain an inspection object data set; according to the inspection object data set, intelligent inspection task planning is carried out, an inspection task data set is obtained, the inspection task data set comprises a plurality of pieces of inspection task data, and each piece of inspection task data at least comprises inspection target data, inspection track data and inspection data acquisition type data; and performing task optimization distribution on the inspection robot cluster according to the inspection task data set to obtain robot inspection task data. According to the invention, the risk of inspection interruption caused by insufficient electric quantity is obviously reduced, and the continuity and safety of power grid operation are guaranteed.
Owner:DENGZHOU BINXUN NEW ENERGY TECHNOLOGY CO LTD

Power distribution network voltage control method based on distributed photovoltaic active-reactive cooperation

The invention discloses a power distribution network voltage control method based on distributed photovoltaic active-reactive cooperation, and the method comprises the steps: analyzing the influence of reactive / active injection on voltage stability through building a sensitivity matrix, deducing a critical control gain constraint condition, and guaranteeing the static stability of the voltage of a power distribution network; a photovoltaic inverter active / reactive cooperative control general model suitable for different scenes is constructed based on an intra-day scheduling and real-time control two-stage framework, and control curve parameters of each node photovoltaic inverter are optimized by taking minimization of network loss cost, active reduction cost, inverter voltage regulation cost and voltage deviation as targets in the intra-day scheduling stage; in the real-time control stage, active power reduction and reactive power regulation are dynamically coordinated based on an optimal control curve, reactive power margin is preferentially utilized to suppress voltage rise, and power flow distribution is directly regulated through active power reduction when reactive power capacity is saturated. According to the method, the safety and economy of the power grid are considered, and theoretical support and a practical solution are provided for voltage control of the high-permeability photovoltaic power distribution network.
Owner:HOHAI UNIV

Output power control method and device of inverter, equipment and storage medium

The invention relates to the technical field of inverter control, and discloses an inverter output power control method and device, equipment and a storage medium. The method comprises the following steps: performing power frequency fundamental wave extraction and multi-band band-pass filtering on acquired voltage and current sampling data; performing phase compensation, first coordinate transformation and positive and negative sequence decoupling operation on the filtered fundamental wave principal component data; on the basis of a synchronous phase angle and a power grid fundamental wave frequency obtained by positive and negative sequence decoupling operation, carrying out second coordinate transformation, moving average and harmonic power delay difference operation on three-phase current and voltage data of an alpha-beta coordinate system; performing multi-level power calculation, power capacity distribution, error characteristic evaluation and decoupling operation on the inversion fundamental component and the inversion harmonic component subjected to the difference operation; and performing output signal modulation on the inversion power control quantity of the decoupling operation based on the fundamental wave synchronization phase angle, and generating a power control result. According to the invention, the control performance of the inverter on the output power in actual operation is improved.
Owner:RISUNIC TECH (SHENZHEN) CO LTD

In-service fan electric quantity evaluation and correction method and system based on incoming flow wind speed correction

PendingCN119005047ARealize refined evaluationimprove accuracyDesign optimisation/simulationSCADAEngineering
The invention discloses an in-service fan electric quantity evaluation and correction method and system based on incoming flow wind speed correction, and relates to the technical field of wind power plant post-evaluation and technical improvement. The method comprises the following steps: processing and obtaining simulated wind parameter data at a machine site through wind power plant evaluation software; the actual output power is projected to the output characteristic curve of the corresponding type to obtain the overall correction coefficient of the fan, and the simulated wind parameter data is corrected; and obtaining corrected simulation wind parameter data at each machine location point, obtaining theoretical annual energy production of the wind power plant through software calculation, comparing the theoretical annual energy production with actual operation annual energy production, and obtaining a software calculation comprehensive correction coefficient as a reduction coefficient for electric quantity analysis of the wind power plant. According to the method, the defects that the representativeness of the anemometer tower is insufficient under the complex terrain of the wind field and errors exist in CFD simulation are overcome, refined assessment of resources in the field is achieved by combining fan SCADA data, and the method can be used for guiding projects such as post-assessment of the wind field and technical improvement of replacing small with large.
Owner:CENT SOUTHERN CHINA ELECTRIC POWER DESIGN INST CHINA POWER ENG CONSULTING GROUP CORP

Charging a Vehicle According to an Optimized Charging Scheme

A charging system comprises a local energy storage disposed at a charging site; an electric coupling configured to provide an electrical interconnect between the charging site and an electric vehicle (EV); and one or more controllers configured to: (i) detect a condition related to availability of electrical energy at the charging station, (ii) in response to the detecting of the condition: (a) estimate a number of EVs to which a charge remaining at the local energy storage is to be distributed within a certain time interval, (b) initiate a charging session for transferring electric energy from the local energy storage to the EV, via the electric coupling, and (c) limit an amount of electrical energy in the charging session in view of at least the estimated number of EVs.
Owner:SPEED CHARGE LLC

Vehicle network interaction regulation and control method and system based on charging pile data

The invention discloses a vehicle network interaction regulation and control method and system based on charging pile data. The method comprises the steps that electric quantity data of each adjustable vehicle at the current collection moment, power supply load data of each node in a power distribution network, position data of each charging pile and charging power data, charging load data and environment data at each collection moment are collected, and the charging load of each charging pile is predicted; obtaining load prediction data of each charging pile, calculating to obtain a vehicle-network interaction suitability index of each charging pile, and determining the power supply load prediction data of each node based on the vehicle-network interaction suitability indexes of all the charging piles, the electric quantity data of all the adjustable and controllable vehicles and the determined matching degree among the power supply load prediction data of each node. And executing a vehicle network interaction regulation and control strategy corresponding to the matching result. According to the charging pile data-based vehicle network interaction regulation and control method and system provided by the embodiment of the invention, the efficiency of vehicle network interaction regulation and control is improved.
Owner:STATE GRID ZHEJIANG ELECTRIC VEHICLE SERVICE CO LTD

Vehicle control method, system and equipment

The invention discloses a vehicle control method, system and equipment, and the method comprises the steps: obtaining whole vehicle performance information and operation information, meeting the starting condition of a prediction energy management mode, obtaining first navigation information, a battery SOC balance point of the nth iteration and an engine working point of the nth iteration, and enabling the first navigation information, the battery SOC balance point and the engine working point to serve as a target battery SOC balance point and a target engine working point, determining engine working point power, and obtaining the whole-course electric quantity demand of the vehicle; according to the working point power of the engine, the vehicle speed when the engine is started is obtained; and if the current energy efficiency performance parameter of the vehicle is superior to the previous energy efficiency performance parameter, the vehicle is controlled based on the battery SOC balance point and the engine working point of the current iteration. Under the condition that navigation information cannot be obtained, the most similar working condition is obtained according to the analogy of the vehicle speed, acceleration and other information and several typical working conditions, the SOC balance point or the engine working point is determined according to the most similar working condition, and the vehicle is controlled based on the determined battery SOC balance point and the engine working point.
Owner:SAIC MOTOR

Green power tracing method for high-proportion renewable energy supply park

Disclosed in the present invention a green power tracing method for a high-proportion renewable energy supply park, comprising: building a park network architecture model, and, on the basis of power flow data at any moment t throughout the year, splitting the park network architecture model into a plurality of active radiation-type power distribution lines; calculating the green power component of each renewable energy in each power distribution line in a single power user; accumulating the green power components to obtain green power consumed by the single power user at any time t and green power generation capacity output by a single renewable energy at any moment t; and forming a green power consumption matrix of the single power user throughout the year and a green power generation capacity matrix of the single renewable energy throughout the year. According to the present invention, the green power consumption of power users can be accurately evaluated, thereby providing accurate data support for green power tracing for users within parks.
Owner:CEEC JIANGSU ELECTRIC POWER DESIGN INST CO LTD

Power capacity market clearing method and device considering flexibility

The invention discloses an electric power capacity market clearing method and device considering flexibility. The method comprises the following steps: constructing an electric power capacity market clearing model considering flexible adjustment requirements of a system; performing dual change and linearization processing on the clearing model, and solving the model; carrying out capacity market pricing and settlement based on a solving result; wherein the step of constructing the power capacity market clearing model considering the flexible adjustment demand of the system comprises the following steps: determining a capacity demand curve which can adopt a variable resource demand curve; constructing a target function with maximization of social welfare as a target; determining capacity market clearing constraint conditions considering flexibility; according to the invention, the capacity value of the new energy can be priced and metered, and the new energy operation cost is reduced.
Owner:STATE GRID TIANJIN ELECTRIC POWER COMPANY +1

Intelligent wireless charging power distribution method and system

The invention discloses an intelligent wireless charging power distribution method and system, and aims to improve the efficiency and safety of simultaneous charging of multiple devices, and the system design comprises a plurality of key modules: a device detection and recognition module automatically recognizes the charging devices and collects the power demands of the charging devices; the power demand analysis module calculates the power demand of each device according to the device electric quantity and the charging mode, and the power distribution control module dynamically adjusts the power output according to the priority, the distance and other factors; the real-time monitoring and feedback module ensures the stability and safety of the charging process, and the data recording and learning optimization module optimizes the charging strategy by analyzing historical data. Through cooperative work of the modules, the system can adjust the charging power in real time, optimize the charging efficiency, improve the user experience, and ensure the safety of the charging process. The system shows good adaptability in a multi-device environment, and important reference and application prospects are provided for development of a wireless charging technology.
Owner:ASAP TECH (JIANGXI) CO LTD

Power transmission network carbon emission accounting method based on full life cycle theory

A power transmission network carbon emission accounting method based on a full life cycle theory. The method comprises: acquiring a bill of materials required in a production stage of a power transmission network device and carbon emission factors of materials corresponding to the bill of materials, constructing a carbon emission accounting model and calculating carbon emissions; acquiring transportation modes and carbon emission coefficients of related materials in the transportation and construction stages, constructing a model and calculating carbon emissions; establishing a model, which takes into consideration indirect carbon emissions generated due to line losses and carbon emissions generated during a replacement process related to conventional consumables and device failure, and calculating carbon emissions; constructing a carbon emission accounting model in the decommissioning and recycling stages, and calculating carbon emissions and carbon emission reductions generated in the stages; and performing accounting on carbon emissions throughout the full life cycle of a power transmission network, and calculating the carbon emission intensity. A carbon emission reduction effect of device recycling in a decommissioning stage is taken into consideration, the carbon emission intensity throughout the full life cycle of the power transmission network is calculated by means of a net power transmission capacity, and practical significance is given to a carbon emission target.
Owner:GUIZHOU POWER GRID CO LTD

Lithium ion battery electric quantity accurate estimation method and system based on BMS

The invention relates to the technical field of battery electric quantity estimation, in particular to a lithium ion battery electric quantity accurate estimation method and system based on a BMS. The method comprises the following steps: collecting BMS original data, carrying out voltage current interval slicing, constructing a charging and discharging period node map, detecting node interruption joints, comparing slope differences to identify charging and discharging turning points, dividing independent charging and discharging periods according to the turning points, and determining current change time sequence data of each period. The actual charging and discharging electric quantity is calculated through the time sequence data, the charging and discharging difference is compared, the historical input and discharging electric quantity is further inquired, the fuzzy electric quantity range of the battery is deduced, and finally the real-time remaining available electric quantity is accurately calculated according to the fuzzy electric quantity range and the actual charging and discharging electric quantity difference and is uploaded to the BMS system. According to the invention, real-time monitoring and management of the electric quantity estimation result are realized, and the intelligent level of the battery management system is improved.
Owner:广东汇创新能源有限公司