The invention discloses a construction method of a self-balancing method
pile foundation
bearing capacity test device, which is characterized by comprising the following processes of: 1, construction preparation: calculating a
balance point position of self-balancing method
pile measurement, determining the number of the
pile measurement, drilling holes, cleaning the holes and detecting the verticality of the holes; 2, manufacturing a load box and
welding the load box with a reinforcement cage; 3, mounting the reinforcement cage; 4, cleaning the holes again; 5, pouring concrete; and 6, carrying out self-balancing method detection. As the detection is directly carried out on
engineering piles in some projects, in order to preventing the pile foundations from affecting the use, a grouting
machine is used for filling gaps separated from pipelines and the load box with
grout after the detection; therefore, the method also comprises the following process of: 7, carrying out pipeline grouting and reinforcement. According to the invention, the defects that the load box mounting time is long, the reinforcement cage floats upwards, the mud at the bottom of the load box is too thick, the pile foundations have gaps at the load box to influence the quality of the pile foundations, the construction progress is slow, and the like are overcome, and the pile foundations have good integrity.