Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

1100 results about "Emergency control" patented technology

Microgrid energy management system and method

The invention discloses a microgrid energy management system which comprises an information collection and data preprocessing unit, a network analysis unit and an energy optimization unit, wherein the information collection and data preprocessing unit performs data mining preprocessing on information, collected by SCADA / PMU mixed measurement, by adopting a CIM model and combining historical section management, the network analysis unit is used for realizing mixed measurement-based microgrid state estimation on the basis of network topology analysis, performing risk analysis and assessment and sensitivity analysis to realize early warning and warning for failure threat, and adopting corresponding precautionary measures or performing emergency control, and the energy optimization unit is used for performing microgrid energy optimization scheduling by combining forecast information and system operation analysis according to the information of the microgrid state estimation. The invention also provides a method which adopts the microgrid energy management system to perform microgrid energy management. The functions of the microgrid energy management system are further perfected, and the system safety, the power supply reliability and the system control accuracy and effectiveness of a microgrid are improved.
Owner:GUANGZHOU INST OF ENERGY CONVERSION - CHINESE ACAD OF SCI

Power grid on-line decision-stabilizing control system and control method based on super real-time emulation

ActiveCN103166219AOptimizing Stability Control StrategiesAddressing Policy MismatchesAc network circuit arrangementsTransmitted powerDecision taking
The invention relates to a power grid on-line decision-stabilizing control system and a control method based on super real-time emulation. According to the power grid on-line decision-stabilizing control system, a data processing module is arranged in a dispatching center, is used for acquiring power grid state information, and transmits power grid operating data to an on-line decision-stabilizing system, the on-line decision-stabilizing system is arranged in the dispatching center and sends a stabilizing controlling decision and overall power grid information to a stabilizing controlling device, the stabilizing controlling device is locally mounted at a transformer substation or a power station, and a data conversion and communication port is connected between the on-line decision-stabilizing system and the stabilizing controlling device and inside the stabilizing controlling device, and is used for data communication between the on-line decision-stabilizing system and the stabilizing controlling device and inside the stabilizing controlling device. A power grid stabilizing decision and control are carried out in real time based on the super real-time emulation, a control decision matched with actual working conditions of a power grid is obtained, a prevention and control decision and an emergency control decision are carried out simultaneously in a system, stable control is carried out on the power grid, and the stability of the power grid is effectively improved.
Owner:CHINA ELECTRIC POWER RES INST +1

Emergency processing method of broken touch screen of computer system and application of emergency processing method

The invention relates to an emergency processing method of a broken touch screen of a computer system. The emergency processing method comprises the following steps of (1) detecting whether a touch screen is in failure or not by a touch control chip in real time; (2) sending an interrupt request to a computer main system by the touch control chip under the situation that the touch screen is in failure; (3) starting a touch screen failure emergency program by the computer main system after the interrupt request is received, wherein the touch screen failure emergency program can be at least used for setting the computer system into an external control mode and/or a key control mode. According to the emergency processing method disclosed by the invention, the touch screen can be detected in real time through the touch control chip, the touch screen failure emergency program can be started and can be at least used for setting the computer system into the external control mode under the situation that the touch screen is in failure, the touch screen can be at least subjected to emergency control by a user through the external control mode according to the emergency processing method when the touch screen breaks down, touch control operations such as input, data backup and data clear can be carried out, and the data loss can be avoided.
Owner:SHANTOU GOWORLD DISPLAY TECH CO LTD

Rescue lanyard and kit for emergency descent from a height including an emergency descent control device

A rescue lanyard is described herein to be used with a safety harness worn by a person. The lanyard comprises a main strap having a first attachment portion for attaching the main strap to a structure and a second attachment portion for attaching the main strap to the harness, and a secondary strap secured to the main strap adjacent the first attachment portion and having a third attachment portion to be attached to the harness via an emergency descent control device. In a safety mode of operation, the first attachment portion of the main strap is attached to the harness and the second attachment portion is attached to a structure so as to retain the person wearing the harness during a fall. In a self rescue mode of operation following a fall, while the person hang from the main strap, the third attachment portion is first attached to the harness via the emergency descent control device and the main strap is then cut so as to allow the person to descent from the structure using the descending device. The emergency control device includes a rope, a rope friction controller having an attachment portion for securing the device to the harness, a rope friction controller for selectively applying friction on the rope, and a safety element for applying friction on the rope so as to prevent movement thereof in the rope friction controller in a panic mode of operation.
Owner:NOUVELLE HAUTEUR +1

Method for assessing safety value of planning scheme for electrical power system containing large-scale wind power

InactiveCN102637289AOptimal prevention and control costsExcellent emergency cost controlData processing applicationsInformation technology support systemElectricityPower grid
The invention relates to the field of expansion planning and safety analysis on electrical power systems. In order to provide a systematized method and a relatively perfect assessment process for the safety assessment on a planning scheme, the technical scheme adopted by the invention is as follows: a method for assessing a safety value of a planning scheme for an electrical power system containing large-scale wind power comprises the following steps: 1, establishing a power supply-power grid unified planning model for taking account of static and dynamic safety values of the system; 2, beginning to carry out detailed operation simulation on candidate planning schemes; 3, after units are combined, carrying out safety assessment on the system time interval by time interval; 4, carrying out comprehensive safety control optimization on an contingency set by using a 'positive constraint and relaxation method' so as to obtain the optimal division of a preventive control contingency set and an emergency control contingency set; and 5, obtaining the total cost of the planning scheme, and taking the total cost as a basis for evaluating the planning scheme. The method disclosed by the invention is mainly applied to the expansion planning and safety analysis on the electrical power systems.
Owner:TIANJIN UNIV

Integrated coordinating control method for security stabilization early warning, preventing control and emergency control

The invention relates to an integration coordination control method of the early security and stability warning, prevention and control and emergency control of large power grids and includes the following steps: various steady data and dynamic data of large power grids are gathered; the present modes are matched with serious historical fault forms in real time as the online appending presupposition fault of stable analytic calculation; the curve data is mined with area methods such as expansion after the power grid is simulated to extract the stable quantitative characteristics of a system; when the power grid has positive secure stability margins, the stability margins and relevant sensitivity analysis technology are used for calculating the limit output and load of a generator and the limit power of a stability section; when the power grid has negative secure stability margins, the prevention and control and emergency control are calculated to confirm the amount of prevention and control measures and control cost thereof as well as the amount of emergency control measures and control cost thereof; the optimum combination of the prevention and control and emergency control are automatically searched. The integration framework of the optimization and coordination of the early security and stability warning, prevention and control and emergency control is built.
Owner:NARI TECH CO LTD +1

Intelligent detection system for tunnel power equipment

The invention discloses an intelligent detection system for a tunnel power equipment. According to the invention, an on-rail tour inspection robot is in wireless communication with a background monitoring platform through an in-tunnel wireless network equipment. The on-rail tour inspection robot carries a communication device, a control device and a detection device. The control device is therein provided with a tour inspection control model and an emergency control model in advance. After the detection device detects an emergency, the control device switches from a tour inspection control mode to an emergency control model according to the emergency information. In the tour inspection control model, the control device controls a drive device of the on-rail tour inspection robot to drive the on-rail tour inspection robot for moving tour inspection on the rails in the tunnel and controls the detection device to detect a specified device, and the detection information is uploaded to the background monitoring platform through the communication device. In the emergency control mode, the control device controls the on-rail tour inspection robot to perform different actions according to the different emergency information. Tour inspection of the tunnel power equipment is realized automatically, the detection efficiency is improved and safety of workers is ensured in the maximal degree.
Owner:SHENZHEN POWER SUPPLY BUREAU +1

Method for estimating and optimizing dynamic safety risk of power transmission system based on practical dynamic safety field

The invention discloses a transmission system dynamic security risk evaluating and optimizing method based on practical dynamic security field, wherein, the risk evaluating relates to influence of uncertainty for risk of node injecting power and system security control measures in computing dynamic unsafety risk by establishing the dynamic unsafety risk evaluating model based on practical dynamic security field; the optimizing method performs the risk control optimation to establish the optimum model of risk control aiming at dominant preconceiving accident collection by determining and dividing the preconceiving accident collection gamma=gamma1 and gamma2. The risk evaluating model can relate to the uncertainty of node injecting power in transmission system dynamic risk evaluating and greatly reduce computing quantity of the dynamic security risk evaluating. The dynamic risk optimizing model realizes the optimizing compution of integrated control measures aiming at the preconceiving accident in expectation operating point and security control preconceiving accident collection gamma1 before adopting control measures. The optimizing compution result can be used for guiding prevention control and emergency control decision.
Owner:TIANJIN UNIV

Synchronous control circuit and method for rail-vehicle-rescue emergency braking

PendingCN107235041AAchieving Brake Synchronization RequirementsAvoid the "discount" problemBrake safety systemsIsolation valveEmergency rescue
A rail vehicle rescue emergency braking synchronous control circuit, which is connected in parallel to the normally closed contact of the linked relay and the emergency braking relay on the emergency braking train line circuit of the lead car of the rescue vehicle and the faulty vehicle, and is used for rescue trains Rebuild the emergency braking train line circuit after connecting with the faulty train; at the same time, configure the brake isolating switch on the head car of the rescue vehicle and the faulty car, connect the rescue head and tail relay and brake isolation relay in parallel, and the emergency braking of the driver's station The normally closed contact of the button is connected in series to the circuit of the emergency brake train line, and the brake isolation solenoid valves of all vehicles are connected in parallel to the circuit of the emergency train line, and the power is supplied by the circuit of the emergency train line. The valve realizes the synchronous control of emergency braking under rescue conditions. The control method of the present invention is safe and reliable, and the synchronization is precise, which saves more than 3 million yuan in procurement costs for the entire project, saves equipment installation space, and ensures installation and maintenance space for the configuration of full-motion vehicles + driverless vehicles.
Owner:CRRC CHANGCHUN RAILWAY VEHICLES CO LTD

Online strategy optimization calculating method for electric system transient state safety and stability emergency control

ActiveCN103384068AMeet needsImprove control performance indicatorsAc network circuit arrangementsEngineeringPerformance index
The invention discloses an online strategy optimization calculating method for electric system transient state safety and stability emergency control, and belongs to the technical field of electric system emergency control. According to the online strategy optimization calculating method for the electric system transient state safety and stability emergency control, based on a transient state safety and stability quantitative analysis theory, control performance index calculation methods of direct current system power emergency modulation, generator removal, load removal and partial power grid disconnection are proposed with control measure cost and control effects taken into consideration; according to different characteristics of safety and stability problems of transient state power angles, voltages and frequency, control measures are selected in a candidate control measure space according to control performance indexes from large to small; corresponding active power control measures are further matched according to steady state frequency estimated values after control, calculation and transient state safety and stability quantitative evaluation of the control measures are further carried out, and the control measures are increased continuously through iteration. The online strategy optimization calculating method for the electric system transient state safety and stability emergency control overcomes the defects in an existing online strategy optimization calculating method for the transient state safety and stability emergency control and meets the actual demands of the online strategy optimization calculation for the large power grid transient state safety and stability emergency control.
Owner:NANJING NARI GROUP CORP +2

Intelligent self-healing monitoring method of extra high voltage power network

ActiveCN101944777ASecurity and Stability Additional ControlSolve self-healing problemsCircuit arrangementsSelf-healingFault coverage
The invention discloses an intelligent self-healing monitoring method of extra high voltage power network, belonging to the field of electric transformer and distribution. The invention uses the self-healing monitoring method that the power network control center collects the fault information, estimates the fault point according to the action information, judges the fault point according to the visualization technology, and starts the automatic recovery project. The method solves the self-healing problem of extra high voltage power network, performs the prevention and correction control, andmakes the dispose strategy based on the information quickly, thereby avoiding the cascade trip caused by load transfer, realizing the safe and stable addition control of the power network from the entire network perspective, and replenishing the disadvantages of area and in situ emergency control measure. Aiming at the specific characteristics in the aspects of running, dispatching and managing of the extra high voltage power network, the method can collect and use the information more comprehensive, and make the dispose strategy quickly to earn the time for the avoiding of cascade trip caused by load transfer, thereby avoiding the further enlargement of fault coverage due to wrong dispose, and solving the self-healing problem of the extra high voltage power network.
Owner:SHANGHAI MUNICIPAL ELECTRIC POWER CO +1

Large-grid wide-area asynchronous coordination control method

ActiveCN102195354AGuaranteed against chain reactionsDisassemble reliableCircuit arrangementsWide areaReal time analysis
The invention relates to a large-grid wide-area asynchronous control method, which belongs to the field of emergency control of power systems. The method comprises the following steps of (1): real-time state computation of a main network frame of a wide area measurement system (WAMS)-based power grid, which is to eliminate the false and retain the truth through data pre-treatment, inhibit or eliminate noises to the largest extent, and highlight the useful information of the wide area measurement system in a grid dynamic process to provide characteristic quantity for stable analysis and control; (2) real-time analysis of stability of grid power angle, which is to detect and predict asynchronous process of the system based on the synchronous phasor of the integral main power grid by combining a system analysis method, and find out an asynchronous section in space; and (3) presentation of a coordinate control strategy for asynchronous disconnection, which is to present a backup disconnection control measure when the asynchronous section deviates to the section which is not controlled by disconnection and guarantee reliable disconnection when the large-grid becomes asynchronous. According to the method, a WAMS-based wide area asynchronous emergency control is provided, the running state of the power system can be monitored and controlled in real time, possible power angle instability of the power system can be predicted, the chain reactions of large-grid resistance is guaranteed, and influences of grid accidents on national economy and people's live are avoided.
Owner:CHINA ELECTRIC POWER RES INST +1

Method for automatically selecting on-line strategy and off-line strategy of transient security and stability emergency control of electrical power system

The invention belongs to the technical field of electrical power system security and stability control and is suitable for a transient security and stability emergency control system to automatically select an on-line strategy or an off-line strategy. On the basis of a transient security and stability quantitative analysis method, the invention provides the index of influence of running state change on transient security and stability for judging the adaptability of the on-line control strategy to the running state change. The invention comprises the following two parts: (1) issuance of the on-line strategy and confirmation of the effectiveness thereof, i.e. checking the security of the on-line strategy to judge whether issuing the on-line strategy to a control device, and judging the effectiveness of the issued on-line strategy constantly; and (2) selection of the on-line strategy and the off-line strategy during failure, i.e. selecting the on-line strategy when 'form characters' detected by the control device are as same as 'form characters' of the on-line strategy, the time for generating the on-line strategy is not long, and the influence degree of the running state change calculated on the basis of measured data of the control device on the transient security and stability meets the requirement; and otherwise, selecting the off-line strategy.
Owner:NARI TECH CO LTD

Phase modifier emergency control method and system capable of suppressing direct-current consequential commutation failure

ActiveCN107342630APrevent latch-up failureReduce the probability of DC continuous commutation failureCircuit arrangementsInformation technology support systemMaster stationPower grid
The invention, which belongs to the technical field of the power system and automation realization, discloses a phase modifier emergency control method and system capable of suppressing a direct-current consequential commutation failure. The method comprises: a direct-current commutation failure information sub station sends direct-current commutation failure information to an emergency control master station; the emergency control master station obtains bus voltage information of a direct-current inverter station with a commutation failure and all phase modifier operation information in a grid; the emergency control master station matches a proper emergency control measure from a control strategy table and sends the measure to a phase modifier control execution station; and the phase modifier control execution station sends an excitation reference voltage modification instruction and a duration time instruction to a phase modifier excitation system to complete phase modifier emergency control. According to the invention, because participation in grid emergency control is realized by using the phase modifier, a direct-current consequential commutation failure probability of a multi-direct-current feed-in receiving end is reduced, interlocking of the direct current due to multi-times commutation failures is prevented, and the large-area power outage caused by multi-direct-current interlocking can be prevented.
Owner:NARI TECH CO LTD +3

Power grid AC/DC cooperation control method after direct current block fault

The invention provides a power grid AC / DC cooperation control method after a direct current block fault. The method comprises steps that characteristic quantity of a power grid is extracted based on power grid operating data obtained by a (Wide Area Measurement System), and the power limit of an interconnection tie of the regional power grid during static and stable operating is calculated; the overshoot of the power fluctuation peak value of the interconnection tie is calculated according to disturbance information which happens to the regional power grid; a load shedding quantification control measure needing to be taken is calculated based on the interconnection tie power peak value fluctuating theory and the unbalanced power redistribution theory. The method provided by the invention utilizes direct current power emergency control, so that coordination and cooperation of control measures between a large capacity direct current receiving end Central China power grid ultrahigh voltage alternating current system and a direct current system, thereby replacing or reducing the load shedding quantity of the Central China power grid, effectively improving the safety and operation efficiency of the power grid, and alleviating pressure that the imbalance impact power of the power grid is wide in influence range, the load shedding quantity is large and the like.
Owner:CHINA ELECTRIC POWER RES INST +2

Fast and reliable congestion control improved algorithm based on user datagram protocol (UDP)

The invention provides a fast and reliable congestion control strategy (FRUDP) which is based on a user datagram protocol (UDP) of a transport layer, and is designed to guarantee an information flow to run high-efficiently and stably in a high speed network environment between an application layer and the transport layer on the basis that network address translator (NAT) equipment can be penetrated through and transportation stability are guaranteed. The FRUDP is mainly formed by an estimating module, a window control module, a data processing model and an emergency control module, wherein the estimating module is arranged at a sending end, does not need to modify a network layer protocol, estimates transmission paths and propagation delay through collaboration according to the local information capable of being obtained by the sending end, and accurately estimates the actual number of the queued packages remaining in periodic line buffer areas in each process. The window control module designs congestion control strategies in a collaboration mode at the sending end, taking the queue size of a bottleneck periodic line buffer area as a balance point, actively controls the queuing length of periodic line buffer areas, and actively prevents the overflow of the queues of the buffer areas and congestion phenomena from occurring. The data processing module determines which groups to be sent from a candidate pool. The emergency control module determines when to send the groups.
Owner:GUANGDONG UNIV OF PETROCHEMICAL TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products