Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

48 results about "Peak load" patented technology

Peak load. noun. : the maximum load carried during a given period (as by a railroad, telegraph line, power plant, pumping station) the person who uses the highways only on such days as … Labor Day makes a marginal contribution to the peak load— W. H. Anderson.

Distributed power supply energy storage configuration method and device

The invention discloses a distributed power supply energy storage configuration method and device. The method comprises the following steps: identifying peak load characteristics of a user side based on historical load data; analyzing output data of the distributed power supply according to the historical power generation data; establishing an energy storage optimization configuration model by taking maximization of user economic benefits as an optimization target; a double-layer optimization method is adopted, based on the energy storage optimization configuration model and peak load characteristics, a charging and discharging plan of the energy storage system is optimized at the upper layer, and a dynamic scheduling strategy is optimized at the lower layer; the real-time electricity price and the user load are predicted in a rolling mode, a dynamic scheduling strategy is combined, a charging and discharging plan is further corrected in the operation process of the energy storage system, the consumption proportion of renewable energy sources is optimized in combination with output data, and the energy storage system and the distributed power supply are made to operate cooperatively. According to the invention, optimal configuration and efficient scheduling can be carried out on the distributed power supply and the energy storage system at the user side.
Owner:ECONOMIC & TECH RES INST OF HUBEI ELECTRIC POWER COMPANY SGCC

System and method for peak load power management for charging of an electric vehicle fleet and / or operation of a microgrid

PendingUS20250381875A1Charging stationsData processing applicationsElectricity infrastructureElectric cars
Operators typically utilize techno-economic means to set peak power demand in power infrastructure sites, such as power depots and microgrids. However, conventional means tend to either produce sub-optimal values of peak power demand or be too computationally expensive to be performed in a real-time or scalable manner. Accordingly, disclosed embodiments utilize a sliding time window to continuously or periodically determine peak power demand in past, current, and future portions of a current time period. These embodiments are able to determine an optimal peak power demand for the current time period, while remaining computationally feasible for real-time performance and being scalable with the complexity of optimization.
Owner:HITACHI ENERGY LTD

High-temperature superconducting cable economical efficiency analysis method for urban power capacity increase

The invention relates to a high-temperature superconducting cable economical efficiency analysis method for urban power capacity increase, and belongs to the field of superconducting application. The method comprises the following steps: acquiring population data, electric vehicle permeability and charging pile configuration data of an urban area, and predicting the number of public charging piles and private charging piles newly added in the urban area; predicting a newly added load peak interval according to the predicted number of the public charging piles and the predicted number of the private charging piles in combination with an automobile charging coincidence rate; designing a superconductive low-voltage capacity increasing scheme based on the newly added peak load interval; acquiring system line loss data of the superconducting low-voltage capacity increasing scheme under different load conditions; and obtaining the annual operation and maintenance cost of the superconductive low-voltage capacity-increasing scheme based on the system line loss data, and carrying out economic analysis on the superconductive low-voltage capacity-increasing scheme based on the annual operation and maintenance cost. The objective of the invention is to solve the problems of lack of systematic economic evaluation means and difficulty in accurately judging the economic applicability of the high-temperature superconducting cable under the background of urban capacity increase in the prior art.
Owner:KUNMING UNIV OF SCI & TECH

New energy vehicle charging pile layout optimization method based on big data analysis

The invention discloses a new energy automobile charging pile layout optimization method based on big data analysis, and relates to the technical field of charging pile layout management. The method comprises the following steps of layout response judgment, layout test verification and layout decision training optimization. According to the method, the peak load response capability in the prediction process is quantitatively judged, so that the condition of charging pile overload or resource waste in the peak period can be effectively reduced, and the balance and adaptability of charging facility configuration are remarkably improved. Through layout decision response optimization, the response precision and timeliness of the model to peak load sudden change can be improved, and meanwhile, through obtaining a layout test verification result, the layout accuracy and the use efficiency of charging pile resources can be further improved. On the basis, charging pile planning layout decision training optimization is introduced, so that the charging pile layout decision is more accurate and higher in adaptability, and the actual effect and reliability of the layout decision are improved.
Owner:BEIJING XINRUNTONG TECH CO LTD

An optimization scheduling method considering participation of chicken house flexible resources in peak load shifting of power distribution network

The present application provides an optimization scheduling method considering the participation of chicken house flexible resources in power distribution network peak load shifting, and relates to the cross technical field of facility agriculture and power grid optimization scheduling, which comprises the following steps: based on the industry load in the whole cycle, using the heat production equation and mechanism model equation of cage chicken house application scene, a typical cage chicken house daily constant temperature energy demand model is constructed; based on the constructed typical cage chicken house daily constant temperature energy demand model, the cage chicken house load is classified, and the classified load is superimposed to construct a load flexibility potential model; based on the constructed load flexibility potential model and the power grid peak load shifting model of adjustable load, by setting the objective function and constraint condition, and using the model optimization algorithm, the optimization scheduling scheme of power distribution network peak load shifting is obtained. The power grid peak load shifting model based on adjustable load constructed by the present application smooths the load curve of power grid, and realizes the economic operation of power grid.
Owner:CHINA AGRI UNIV +2

Cruise control method for transient state peak load regulation of thermal power unit based on intelligent control algorithm

The application discloses a thermal power unit transfer state peak load cruise control method based on an intelligent control algorithm and relates to the technical field of load coordination control. The thermal power unit transfer state peak load cruise control method based on the intelligent control algorithm determines the load demand change condition by classifying and processing data, realizes internal coordination of the thermal power unit based on the load demand change condition, realizes control operation on various factors in the boiler, analyzes the time for generating and implementing the instruction and the setting of the threshold value in the boiler, completes compensation and optimization of the coordination strategy through a compensation algorithm, completes the prediction operation when the load changes, analyzes the safety condition by using historical big data, obtains the desired prediction time, traces the corresponding load demand according to the prediction time, gives enough time to complete the coordination operation in the load supply process, and guarantees the operation safety of the thermal power unit.
Owner:SHENHUA GUOHUA JIUJIANG POWER GENERATION CO LTD +1

Method of measuring a reference value of a crusher load and a crusher control method

The application discloses a kind of measuring crusher load benchmark value operation method and crusher control method, control system in crusher gathers the load of crusher once in a period of time, long enough time is continuously collected;The average of these load values is reference value A0, A0 is comprehensive load benchmark value;The average of load value greater than A0 is peak load benchmark value A1;The average of load value less than A0 is low load benchmark value A2;Control system automatically records above numerical value, and as the benchmark value of load related parameter;Control system statistics in a certain period of time, the number of load value greater than or equal to A1, and the average value N in the whole test data is calculated as peak quantity benchmark value;The number of load value less than or equal to A2 and the average value M in the whole test data are calculated as low load quantity benchmark value;These parameter values are automatically or manually changed after the next operation benchmark load test function;Make crusher can maintain optimal performance, maintain efficient work.
Owner:XUZHOU XCMG MINING MACHINERY CO LTD

Elevator car buffer system with segmented energy absorption structure

The present application relates to the technical field of elevator car, and discloses a kind of elevator car buffer system of sectional energy-absorbing structure, including shaft, shaft is provided with car, shaft and car are jointly provided with traction part, guide part and counterweight part, shaft and car are also jointly provided with buffer part, shaft and counterweight part are jointly provided with rail holding deceleration part.The elevator car buffer system of sectional energy-absorbing structure can effectively solve the problem that elevator buffer system exists in the process of car overspeed impact in the prior art, energy-absorbing response lag in initial buffering, impact process load distribution is uneven, and peak load at the end is seriously over-standard;And the end buffer in the elevator car buffer system does not have a matching rigid locking structure, rebound and secondary bounce will occur after the car is buffered, further exacerbating the problem of personnel injury and equipment damage.
Owner:FUZHOU JINSHANYANG ELEVATOR ENG CO LTD

Method and system for optimizing low-carbon operation of power system

The invention discloses a power system low-carbon operation optimization method and system. The method comprises the steps of S1, collecting multi-source operation data in a target power grid dispatching period; s2, an optimal scheduling model is established based on the multi-source operation data, a target function is the weighted sum of economic cost and carbon emission cost, and limiting conditions include unit operation limitation, system power balance limitation and safe operation limitation; s3, introducing a demand side response variable and constraint into the optimal scheduling model, establishing a mathematical model of an interruptible load and a peak-shifting load, and bringing the power adjustment amounts of the two types of loads into system global power balance calculation; and S4, solving the optimization scheduling model after introduction of the demand side response variables and constraints by using a hybrid intelligent optimization algorithm, and outputting a scheduling scheme including a unit output plan and an adjustable load response plan. Through the improved optimization scheduling model and algorithm, a scheduling scheme for reducing power grid carbon emission, peak load shifting and guaranteeing operation safety can be output.
Owner:STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER CO

Distribution area distributed power supply autonomous consumption method based on source-load complementation

The invention provides a power distribution area distributed power supply autonomous consumption method based on source-load complementation, and the method comprises the following steps: S1, constructing a power distribution area model based on source-load complementation based on a power distribution area model based on source-load complementation; s2, establishing a day-ahead optimization regulation and control model according to the power distribution area model obtained in the step S1; and S3, solving the branch power flow by adopting the power distribution area branch power flow model obtained in the step S2 according to an optimization target in combination with a constraint condition. After the method provided by the invention is applied to optimized scheduling, the new energy consumption rate of a power distribution area is improved from 81.2% to 83.2%, and response scheduling of the electric vehicles in different time periods effectively promotes new energy consumption and peak load shifting, reduces the main network electricity purchasing and network loss cost, and realizes reduction of the total cost. According to the invention, the absorption capability of the distributed power supply is improved, and the operation economy of the power distribution network is improved.
Owner:ELECTRIC POWER OF HENAN LUOYANG POWER SUPPLY

Daily peak load prediction method and system based on graph regularization regression

The invention discloses a daily peak load prediction method and system based on graph regularization regression. The method comprises the following steps: acquiring multi-source historical data for daily peak load prediction; constructing multi-source features based on the multi-source historical data; establishing a feature association graph based on the multi-source features, and constructing a graph Laplacian matrix based on the feature association graph; constructing a graph regularization regression model based on the graph Laplacian matrix; solving the graph regularization regression model, determining an optimal parameter of the model, and determining an optimal model based on the optimal parameter; and predicting a future daily peak load based on the optimal model. According to the method, the daily peak load prediction model based on graph structure regularization regression is constructed, efficient and stable model solving is realized through the association relationship between feature graph modeling features and in combination with an alternating direction multiplier method ADMM, the future daily maximum load is predicted with high precision based on the model, the load peak can be accurately predicted in advance, and the prediction efficiency is improved. And important decision support is provided for power dispatching operation.
Owner:CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD +3

Multi-element energy storage scheduling method and equipment considering equivalent peak-valley difference

The invention discloses a multivariate energy storage scheduling method and equipment considering an equivalent peak-valley difference, and belongs to the technical field of power system operation and control. A microgrid net load time sequence is obtained, a scale coefficient is constructed based on the ratio of the rated power of a rapid energy storage unit to the historical peak net load, and a target quantile is determined through a piecewise linear function; an equivalent peak-valley difference is defined, and a peak, valley and climbing section criterion is given; on the basis, a rapid energy storage unit and an energy type energy storage unit are distinguished, the rule of first rapid and then slow and first power and then energy is adopted, peak clipping is preferentially carried out in a peak section, charging is preferentially carried out in a valley section, and the power change rate is limited in a climbing section. The power and energy plan of each energy storage unit is generated hour by hour in combination with constraints such as power upper limit, energy state, round-trip efficiency and charge and discharge mutual exclusion, statistical peak load shifting and climbing suppression without complex optimization modeling is realized, and the engineering applicability of multi-element energy storage cooperative operation is improved.
Owner:POWER RES INST OF STATE GRID SHAANXI ELECTRIC POWER CO LTD +1

Planning-oriented multi-scale peak load forecasting method based on attention network

This application discloses a planning-oriented multi-scale peak load forecasting method based on attention networks, belonging to the field of attention network technology. The method includes: determining a target power grid; collecting historical window load data of the target power grid according to a preset time window; constructing multi-scale power grid window load characteristics by combining an attention mechanism; setting a planning-oriented error penalty factor; training and generating a peak load predictor based on the error penalty factor; processing the multi-scale power grid window load characteristics through the peak load predictor to obtain peak load prediction values; and generating a power grid equipment expansion plan based on the peak load prediction values. This method solves the technical problems of existing forecasting methods neglecting the actual economic impact of forecasting errors on power grid planning and lacking effective fusion and utilization of multi-time-scale load characteristics, resulting in low accuracy and reliability of forecasting results.
Owner:STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER CO

Air conditioning system based on peak load shifting

The utility model discloses an air conditioning system based on peak load shifting, which comprises an energy supply main pipeline, a water tank and a heat exchanger, the water tank is connected into the energy supply main pipeline through the heat exchanger, a first energy supply pipeline, a second energy supply pipeline and a third energy supply pipeline are arranged between the water tank and the heat exchanger, and the first energy supply pipeline is connected with the heat exchanger. And the flow direction of cold / hot water is changed to adjust the cold / heat storage working condition or the cold / heat release working condition. The operation of the system is mainly controlled through the switching of related valves in the pipeline, cold storage or heat storage is carried out by using the water tank in the off-peak electricity period, and cold release or heat release is carried out in the peak electricity price period, so that the operation cost of a user side can be reduced, and the effects of peak load shifting can be achieved on a power grid side.
Owner:ZHEJIANG BOHUA ELECTRIC POWER DESIGN INST CO LTD

System and method for peak load prediction

PendingGB2704266ASimulationPeak load
A method of predicting a peak load in response to a test scenario comprises: for each of a plurality of configurations of a vehicle 104, obtaining a peak load value for that configuration of the vehic
Owner:JAGUAR LAND ROVER LTD

Public building power-saving effect evaluation method and device based on day with similar sensible temperature

The invention relates to a public building power-saving effect evaluation method and device based on a sendible temperature similar day, and the method comprises the steps: determining a temperature similar day corresponding to a to-be-evaluated day based on the sendible temperature of the to-be-evaluated day; determining the reference peak electric quantity of the temperature-similar day and the reference peak load of the temperature-similar day; determining the accumulated saved peak electric quantity of all public buildings on the to-be-evaluated day by using the reference peak electric quantity of the temperature similar day; determining the maximum peak pressure drop load of the public building on the to-be-evaluated day by using the reference peak load of the temperature similar day; and determining the power-saving effect of the public building according to the accumulated saved peak electric quantity of the public building on the to-be-evaluated day and the maximum peak voltage drop load of the public building on the to-be-evaluated day. According to the invention, the power saving effect of the public building monomer and different types of public buildings can be quantitatively evaluated from the two aspects of power saving and power saving, so that the accurate evaluation of the power saving effect of the public buildings is realized.
Owner:CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD +2

Automobile charging pile energy consumption optimization method and system based on charging demand prediction

The invention relates to an automobile charging pile energy consumption optimization method and system based on charging demand prediction, and relates to the technical field of automobile charging piles, a shared load pool is constructed and intelligently divided into shared load modules, refined partition management of charging loads is achieved, the load of each module is accurately estimated by using a fusion prediction model, and the energy consumption of the charging pile is optimized. According to the method, the peak load of the regional power distribution network can be effectively reduced, the overall utilization efficiency of charging facilities is improved, meanwhile, the charging requirements of users are guaranteed, and dual optimization of safe and economic operation of the power grid is achieved.
Owner:BEIJING XINRUNTONG TECH CO LTD

System and method for calculating annual peak and deep adjustment capability of electric power system in electric power spot market

The invention relates to a system and a method for calculating annual peak and deep adjustment capability of a power system in a power spot market, which realize unified evaluation of adjustment capability of a power generation side and a power utilization side through a supply and demand integrated architecture of data input, quotation modeling, market clearing, capacity authentication and result output, and realize accurate evaluation of the adjustment capability of the power generation side and the power utilization side based on refined analysis of 8760 hours in the whole year. And the actual operation characteristics of the power system are accurately reflected. And in combination with fuel, wear, environmental cost and other models, a scientific basis is provided for optimal configuration of electric power resources. And source-load double-side coordinated regulation evaluation is realized, the power utilization side peak load shifting capability is taken into consideration of system flexibility, and the new energy consumption capability and the power grid safety are improved.
Owner:ELECTRIC POWER RES INST STATE GRID SHANXI ELECTRIC POWER +1

A method for diagnosing key state points of post-peak unloading of a thin-walled structure

ActiveCN121901805BStrength propertiesStrain energyPeak load
The application discloses a diagnosis method of key state points of post-peak unloading of a thin-walled structure, and particularly relates to the field of thin-walled structure performance analysis. The method comprises the following steps: obtaining a displacement sequence, a load sequence, an external work sequence and an elastic strain energy sequence of a composite material with a thin-walled structure in a loading process; determining the cumulative dissipation energy of each displacement point according to the difference between the external work sequence and the elastic strain energy sequence; determining the dissipation energy change rate of each displacement point according to the cumulative dissipation energy and the displacement sequence; determining the tangent stiffness spectrum of each displacement point according to the load sequence and the displacement sequence, so as to obtain a tangent stiffness spectrum sequence; obtaining a displacement point corresponding to a maximum load as a peak load point; determining a damage starting point in the displacement sequence according to the dissipation energy change rate; and determining an unloading inflection point in the displacement sequence according to the tangent stiffness spectrum sequence. Based on the above method, the reliability of a diagnosis conclusion can be improved.
Owner:NORTHWESTERN POLYTECHNICAL UNIV

Method for analyzing installation stability and bearing capacity of transformer base

The invention provides a transformer base installation stability and bearing capacity analysis method, which comprises the steps of performing fusion processing on a static stability index and a dynamic impact risk index to obtain a comprehensive risk coefficient, and combining the comprehensive risk coefficient with an oil liquid shaking period duration to determine an oil liquid shaking amplitude expansion amount under earthquake excitation; analyzing instantaneous dynamic load distribution of the base according to the peak value of the impact force in combination with the three-axis vibration acceleration signal of the base, identifying a load peak moment in the instantaneous dynamic load distribution of the base, and extracting a maximum impact load borne by the base corresponding to the load peak moment; the bearing margin of the base is evaluated according to the maximum impact load in combination with the rated bearing capacity of the base, and the dynamic bearing capacity grade of the base is determined according to the bearing margin.
Owner:GUANGDONG HUIXINDA ELECTRIC POWER TECH CO LTD

Advancing type working face propulsion control method and system

The invention belongs to the field of coal mining, and discloses an advancing type working face propulsion control method and system, which dynamically optimizes the operation time sequence and action parameters of each device by deeply sensing the operation parameters and energy consumption characteristics of the device in combination with load trend prediction and risk assessment, thereby effectively stabilizing the overall instantaneous total power load of the working face, and improving the working efficiency. 'Peak clipping and valley filling' of energy consumption is realized, the overall instantaneous total power load of a working face can be effectively stabilized, the impact of a power supply system is reduced, the energy utilization efficiency is improved, and the service life of equipment is prolonged.
Owner:JINING INTELLIGENT STAR INFORMATION TECHNOLOGY CO LTD +1

Method, system and equipment for determining day-ahead operation mode of pumped storage power station in double-high power grid and medium

The invention is suitable for the technical field of economic dispatching of a power system, and discloses a method, a system, equipment and a medium for determining a day-ahead operation mode of a pumped storage power station in a double-high power grid, and the method comprises the steps: obtaining load prediction data and technical parameters of each unit; performing unit combinatorial optimization through technical parameters of each unit, and constructing a day-ahead economic dispatching model by combining multiple constraint conditions and taking minimization of system operation cost as a target function; the day-ahead economic dispatching model is solved through the load prediction data, and the power and the standby state of the pumped storage unit are obtained; and according to the peak clipping and valley filling characteristics, the day-ahead operation mode of each time period is determined through the power and the standby state of the pumped storage unit. According to the method, the technical advantages of all the units are coordinated through the peak clipping and valley filling characteristics of the pumped storage units, accurate determination of the day-ahead operation mode of the pumped storage power station and the optimal scheduling strategy of coordination and cooperation of all types of units are achieved, and the operation economical efficiency of the double-high power system is remarkably improved.
Owner:GUANGXI POWER GRID CORP

A method and system for predicting daily load curve of a province based on an extreme value correction mechanism, and a storage medium

The application relates to a kind of provincial electric power daily load curve prediction method, system and storage medium based on extreme value correction mechanism, belong to electric power load prediction technical field.The technical scheme: the historical load sequence received by system, multi-city meteorological data and calendar information are carried out multi-source feature engineering processing, input feature vector is extracted, then input feature vector is respectively input into the extreme value prediction branch and the morphology prediction branch arranged in parallel: extreme value prediction branch obtains the load maximum point and load minimum point of the day to be predicted using extreme value prediction model;The morphology prediction branch obtains the basic load prediction curve of the day to be predicted using the morphology prediction model;Through the gaussian weighting post-processing module, the predicted load extreme value is used as the anchor point, the basic load prediction curve is nonlinearly dynamically corrected, and the final daily load prediction curve is output.The application improves the prediction accuracy of the daily load curve in the complex scene of the whole province, especially enhances the capture ability of the peak load.
Owner:DADU RIVER HYDROPOWER DEV

Temperature control method and system for mass concrete

The invention relates to the technical field of mass concrete construction, and particularly discloses a mass concrete temperature control method and system. In order to solve the problems of system overload and concrete quality risk caused by real-time temperature control in a centralized maintenance scene, the method comprises the following steps: collecting maintenance records of concrete within a specified number of days from the number of days to be maintained, and calculating the maintenance frequency of the maintenance by acquiring the number of days of the previous maintenance within the specified number of days and taking the primary maintenance as a cold start reference; a preset maintenance evaluation model is used for evaluating the number of days between the latest maintenance and the last maintenance of the concrete, and then the evaluation value of the number of the latest maintenance days is obtained; and finishing temperature control before the date corresponding to the evaluation value. The maintenance evaluation model is constructed through spline curve interpolation regression correction by taking the number of days at intervals associated with each maintenance and the corresponding maintenance frequency as samples. The system module correspondingly realizes the functions. Through predictive temperature control scheduling, the peak load of the system is remarkably reduced, and the maintenance efficiency and quality are improved.
Owner:CHINA ANENG GRP FIRST ENG BUREAU CO LTD +1

Scheduling optimization method and system for flexible resources in edge-cross-border area

The invention discloses a scheduling optimization method and system for flexible resources in a side-cross-border area, and the method comprises the steps: constructing a target function between the operation cost and decision variables of the side-cross-border area of multi-park coupling, and the decision variables comprise the power cost, the gas cost, the flexible load compensation cost and the wind starting light penalty cost; and carrying out optimal solution solving on related parameters of the target function by taking optimization of the operation cost as a target. Related parameters can be applied to scheduling and operation of a multi-energy system so as to be used for collaborative scheduling of multi-type flexible resources in edge and cross-border areas. According to the invention, multi-type flexible resources of the source network load storage of the edge-cross border region are fully considered, the space-time complementation characteristic and the peak-load regulation advantage of the flexible resources are deeply excavated, and the efficient clean energy system of edge-cross border region multi-park coupling interconnection and collaborative economic operation is constructed in an assisted manner. Effective consumption of user-side distributed renewable energy sources is powerfully promoted, energy conservation and emission reduction are achieved, and stable and reliable energy consumption is guaranteed.
Owner:YUNNAN POWER GRID CO LTD ELECTRIC POWER RES INST +2

Low-emission gas turbine plant for peak load, and method

The invention relates to a plant comprising at least: a gas turbine; a generator; a chimney (16) into which the hot exhaust gas from the gas turbine can be directed; a catalytic converter section (39) in the chimney (16), wherein nozzles (36) are arranged upstream of the catalytic converter section (39) and can inject a liquid in order to reduce the temperature of the hot exhaust gas from the gas turbine; optionally, a steam turbine and a heat recovery steam generator (HRSG).
Owner:SIEMENS ENERGY GLOBAL GMBH & CO KG

Method and system for determining bearing capacity of prefabricated assembled bridge pier under compression-bending-shearing-torsion action

The present application relates to the technical field of bridge engineering, in particular to a method and system for determining the bearing capacity of a prefabricated and assembled bridge pier under compression-bending-shear-torsion action, comprising determining the stress failure model and analysis assumption conditions of the prefabricated and assembled bridge pier, and then establishing the limit axial force expression and shear force balance equation; the limit axial force expression, shear force balance equation, bending moment equation and torsion equation are derived to obtain the unified analysis equation of the prefabricated and assembled bridge pier; the joint torsional bearing capacity calculation formula is constructed based on the shear bearing capacity data and joint stress conditions; the peak load of different prefabricated and assembled bridge piers is calculated and compared with the test according to the unified analysis equation of the prefabricated and assembled bridge pier and the joint torsional bearing capacity calculation formula. The present application comprehensively considers the combined action of compression, bending moment, shear force and torsion, can more accurately reflect the stress condition of the prefabricated and assembled bridge pier, and realizes the accurate prediction of the peak bearing capacity and peak torsion of the prefabricated and assembled bridge pier under compression-bending-shear-torsion load action.
Owner:EAST CHINA JIAOTONG UNIVERSITY

Planning-oriented multi-scale peak load prediction method based on attention network

The invention discloses a planning-oriented multi-scale peak load prediction method based on an attention network, and relates to the technical field of attention networks, and the method comprises the steps: determining a target power grid, collecting the historical window load data of the target power grid according to a preset time window, and constructing a multi-scale power grid window load feature in combination with an attention mechanism; setting a planning-oriented error penalty factor, and training and generating a peak load predictor based on the error penalty factor; and processing the multi-scale power grid window load characteristics through the peak load predictor to obtain a peak load predicted value, and generating a power grid equipment capacity expansion scheme according to the peak load predicted value. The technical problems that an existing prediction method neglects the actual economic influence of prediction errors on power grid planning and lacks effective fusion and utilization of multi-time scale load features, and consequently the accuracy and reliability of a prediction result are low are solved.
Owner:STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER CO

A method for optimal dispatch of a direct current interconnected power grid based on cross-region mutual aid of thermal power and energy storage backup

The present application belongs to the field of DC interconnected power system dispatching technology, and provides a DC interconnected power grid optimal dispatching method based on thermal power and energy storage reserve cross-region mutual aid, comprising: peak load regulation and frequency modulation demand quantification model construction, peak load regulation and frequency modulation capacity quantification model construction, whole process frequency safety constraint setting, overall reserve mutual aid coupling relationship constraint setting, optimization objective function setting, peak load regulation and frequency modulation safety collaborative dispatching model construction, optimal dispatching result solving and execution; the present application, through quantification processing and safety constraint construction of power grid volatility and uncertainty, reserve mutual aid capacity, guarantees active frequency safe operation of the DC interconnected power grid; through the constructed overall reserve mutual aid coupling relationship constraint, a reasonable thermal power unit, energy storage and DC tie line coupling operation model is provided; through integrating the target constraint into a constraint set and performing dispatching optimization based on the constraint set, the safety and accuracy of system dispatching are improved.
Owner:STATE GRID XINJIANG ELECTRIC POWER CORP

Diagnostic method for post-peak unloading key state point of thin-wall structure

The invention discloses a diagnosis method for a post-peak unloading key state point of a thin-wall structure, and particularly relates to the field of thin-wall structure performance analysis. Comprising the following steps: acquiring a displacement sequence, a load sequence, an external work sequence and an elastic strain energy sequence of a composite material with a thin-wall structure in a loading process; according to the difference value of the external work sequence and the elastic strain energy sequence, accumulated dissipated energy of each displacement point is determined; according to the accumulated dissipated energy and the displacement sequence, the dissipated energy change rate of each displacement point is determined; determining a tangent stiffness spectrum of each displacement point according to the load sequence and the displacement sequence to obtain a tangent stiffness spectrum sequence; acquiring a displacement point corresponding to the maximum load as a peak load point; determining a damage starting point in the displacement sequence according to the dissipated energy change rate; and determining an unloading inflection point in the displacement sequence according to the tangent stiffness spectrum sequence. Based on the method, the reliability of the diagnosis conclusion can be improved.
Owner:NORTHWESTERN POLYTECHNICAL UNIV