Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

1915results about "Marine site engineering" patented technology

Restoration method of wetland ecosystem

PendingCN119444526ARestoring ecological functionsrestore stabilityData processing applicationsCultivating equipmentsRevegetationEnvironmental resource management
The invention relates to a restoration method of a wetland ecosystem, and aims to improve the biodiversity of a wetland and restore and enhance the ecological function of the wetland through systematic measures. The method comprises the following steps: firstly, evaluating the current condition of the wetland, and identifying specific or endangered species and alien invasive species; secondly, by introducing or protecting specific animal and plant species, the natural habitat is recovered, and the biodiversity of the wetland is improved; thirdly, the water quality and soil conditions of the wetland are improved by adopting technologies such as hydrological regulation and control and vegetation restoration; fourthly, the connectivity of the interiors of the wetlands and surrounding habitats is enhanced, and species migration and gene exchange are promoted. By means of the measures, a damaged wetland ecosystem can be effectively restored, key functions such as water quality purification, flood regulation and carbon storage of the wetland ecosystem can be restored, meanwhile, endangered species are protected, and the ecological value and landscape aesthetics of the wetland are improved.
Owner:ZHONGCHUAN NO 9 DESIGN & RES INST

Reservoir bedrock anti-seepage grouting method

The invention relates to the technical field of reservoir bedrock anti-seepage grouting, and discloses a reservoir bedrock anti-seepage grouting method which comprises the following steps: acquiring fracture data through geological exploration, and constructing a reservoir bedrock fracture distribution model; simulating a flow path and permeability characteristics of the slurry in the fracture based on the fracture model; the grouting pressure and flow are determined through an optimization algorithm, and a grouting scheme is formulated; screening grouting materials according to fracture characteristics, and analyzing stress-strain and permeability of the grouting materials; a construction process is formulated, the grouting state is monitored in real time, and parameters are dynamically adjusted; and after grouting, carrying out permeation and pressure test to evaluate whether the curing effect reaches the standard or not. Based on the three-dimensional fracture structure modeling and flow field simulation technology, high-precision recognition and dynamic evolution tracking of the fracture permeation path in the complex rock mass of the reservoir bank are achieved, so that grouting hole layout is more accurate, the slurry flow direction is more controllable, and the method is different from a point-selecting grouting mode of a traditional empirical method.
Owner:ANENG CHONGQING CONSTR DEV CO LTD

Artifical reef structure

A system for stabilizing soil for accretion and retention of coastal water soil is disclosed. The system includes a plurality of artificial reef segments, where each segments comprises a homogenous curved frame structure, a plurality of openings extending through the homogenous curved frame structure, a plurality of frame segments, and a plurality of cutouts disposed along a terminating end of each artificial reef segment. In one embodiment, an artificial reef configuration is disclosed having a first reef segment arranged on top of a second reef segment and a third reef segment in such a way that the cutouts of the first reef segment receive at least one of the plurality of frame segments of the second reef segment and the third reef segment. Furthermore, a transport configuration includes a first reef segment stacked on top of a second reef segment.
Owner:REEF ARCHES PHC LLC

Underwater in-situ 3D printing repairing and building construction method for concrete structure

The embodiment of the invention discloses an underwater in-situ 3D printing repairing and building construction method for a concrete structure. The method comprises the steps that a damaged part of the underwater concrete structure is cut and shaped; an underwater protective agent is put into the water body where the underwater concrete structure is located; setting printing parameters of the 3D printer according to the size of the damaged part after cutting and shaping; and a printing nozzle of the 3D printer is moved downwards to the position of the damaged part after cutting and shaping, then the mixed 3D printing cement-based material is poured into a concrete pump machine and conveyed to the printing nozzle through a guide pipe, and printing is started till repairing of the damaged part is completed. According to the method, the efficiency and effect of underwater in-situ repair and underwater building construction of the concrete structure can be improved.
Owner:CHONGQING JIAOTONG UNIV

Unattended overwater sound wave precipitation enhancement floating system and method for reservoir storage enhancement

The invention relates to an unattended water sound wave precipitation enhancement floating system and method for reservoir storage enhancement. The system comprises a floating platform, an equipment container and a comprehensive control unit, wherein the equipment container and the comprehensive control unit are arranged on the floating platform; the equipment container comprises a sound wave emission sub-box, an auxiliary equipment sub-box and a control and power sub-box; an airflow modulation loudspeaker and a loudspeaker horn are arranged in the sound wave emission sub-box; a weather monitoring unit and an air compressor are arranged in the auxiliary equipment sub-box, the weather monitoring unit is used for monitoring regional weather information and sending the regional weather information to the comprehensive control unit, and the output end of the air compressor is connected with the input end of the airflow modulation loudspeaker through a pipeline; the energy unit comprises a wind driven generator, a diesel generator, an energy storage battery and a facade photovoltaic array; the comprehensive control unit is arranged in the control and power sub-box and used for comprehensively controlling all devices in the sound wave precipitation enhancement floating system.
Owner:FUJIAN SHUIKOU POWER GENERATION GROUP +1

Water level prediction model construction method, water level prediction model construction program, predicted water level data output method, predicted water level data output program, test data interpolation method, test data interpolation program, water level prediction hit ratio calculation method and water level prediction hit ratio calculation program

To easily construct a water level prediction model by using a water level prediction model at a water level prediction point in a non-tidal area even in a tidal area similarly to the non-tidal area.SOLUTION: The present disclosure pays attention to that for a water level in a tidal area, an effect of a low tide and a high tide in a river-mouth region is nearly independent from an effect of a water level and precipitation in an upstream area. Then, tidal level data T is subtracted from tidal area water level data E, and the tidal area water level data E is converted into water level data obtained by removing an effect of a tide from the data E. Further, assumed water level data, upstream area water level data U and precipitation amount data R are used to construct a water level prediction model M obtained by removing the effect of the tide similar to a non-tidal area.SELECTED DRAWING: Figure 2
Owner:JAPAN RADIO CO LTD

Selection and construction method of reference point in interfered submergence type river water ecology

To have a high nature imitation effect of reference point micro inhabitation environment, hold water ecological space heterogeneity of a target water body at the maximum without changing a microorganism / organic feature in a natural water ecological system in the whole construction process, and realize a natural water ecological environmental status.SOLUTION: A selection and construction method of a reference point in interfered submergence type river water ecology includes steps of: dividing a basin basic space unit S1; analyzing an influence on an ecological environment stress of human activity in the basin basic space unit and extracting a water ecological feature S2; selecting a reference candidate point S3; evaluating an aquatic organism status of the reference candidate point S4; constructing a nature imitation reference point S5; and evaluating the aquatic organism status of the nature imitation reference point S6.SELECTED DRAWING: Figure 1
Owner:SICHUAN ACAD OF ENVIRONMENTAL SCI

Environment-friendly high-strength waterstop and preparation method thereof

The invention discloses an environment-friendly high-strength water-stop belt and a preparation method thereof, and relates to the technical field of high-molecular compound composition water-stop belts. The environment-friendly high-strength water-stop belt is prepared from the following components in parts by mass: 100 parts of ethylene propylene diene monomer, 40 to 70 parts of reinforcing filler, 10 to 25 parts of environment-friendly plasticizer, 1 to 5 parts of interface modifier, 1.5 to 3.5 parts of vulcanizing agent, 3 to 8 parts of active agent, 1 to 3 parts of anti-aging agent and 5 to 15 parts of flame retardant. White carbon black and calcium carbonate are adopted as reinforcing filler to replace traditional carbon black, and energy consumption and pollution emission in the production process are remarkably reduced. By optimizing the formula and the preparation process, the tensile strength, the elongation at break, the tearing strength and other mechanical properties of the waterstop are remarkably improved. Aluminum hydroxide is added as a flame retardant, absorbs heat during thermal decomposition and forms a barrier layer, so that oxygen is effectively diluted, and fire spreading is prevented.
Owner:YUYIN TECH CO LTD

Device and method for identifying and repairing underwater cracks of concrete structure

The invention discloses a device and method for identifying and repairing underwater cracks of a concrete structure. The device comprises an underwater robot, a propelling device and a signal processing system are carried on the underwater robot, and a repairing device is installed below the underwater robot; the signal processing system comprises an image collection module, a control module and an ultrasonic positioning module; the repairing device comprises a transmission device and a grouting device. According to the method, an improved YOLOv8 image recognition algorithm is adopted to recognize the crack trend, and then the crack three-dimensional features are constructed in combination with depth data provided by a depth camera. Secondly, an optimal path is planned through an autonomous navigation system, so that the device accurately reaches the position of the crack; and then the position, the posture, the advancing speed and the advancing direction of the underwater robot are adjusted through PID closed-loop control logic, so that the spray head and the magnetic suction head are attached to the crack for filling. The method improves the efficiency and reliability of detecting and maintaining the underwater building, and is of great significance for prolonging the service life of the underwater building.
Owner:CHINA THREE GORGES UNIV

Water conservancy project anti-seepage treatment method

The invention relates to the technical field of water conservancy projects, in particular to a water conservancy project anti-seepage treatment method, which comprises the steps of sequentially acquiring underwater images at the same position of a water conservancy project according to a preset time interval; all the underwater images are preprocessed, and an image sequence is formed; calculating the image quality of each underwater image according to the gray feature of each underwater image; based on the image quality of each underwater image and the time-varying condition of each shadow part in the image sequence, determining to obtain a suspected crack and a credibility evaluation value corresponding to the suspected crack; and judging whether the suspected crack is a crack or not according to the morphological characteristics of the suspected crack and the credibility evaluation value, and if the suspected crack is a crack, performing anti-seepage treatment on the hydraulic engineering according to the position information of the suspected crack. According to the method, the image quality, the morphological characteristics and the like of the underwater image are deeply analyzed, the interference of water floating objects and the water level on crack judgment is reduced, and the recognition accuracy is improved.
Owner:GREEN TECHNOLOGY (DALIAN) CO LTD

Method for rapidly optimizing wave absorbing performance of underwater ecological submerged dike

The invention discloses a method for rapidly optimizing the wave absorption performance of an underwater ecological submerged dike, and belongs to the technical field of ocean engineering, and the method comprises the following steps: taking an oyster reef as a research object, comprehensively considering marine environment factors and ecological submerged reef arrangement which influence the wave absorption performance of the ecological submerged reef, carrying out dimensionless processing, and determining seven independent variable parameters: relative water depth, water depth, water depth, water depth and water depth; the wave steep, the relative immersion depth of the oyster reefs, the relative length of the oyster reefs, the relative distance between the oyster reefs, the riverbed gradient and the number of the oyster reefs are determined. According to the method, nonlinear influences between all variable parameters are considered, a second-order optimal design model is suggested, an information matrix representing how changes of all factors affect variances and covariances of model parameters is calculated, and an optimal design scheme is obtained by maximizing eigenvalues of an inverse matrix. Compared with the traditional full-factor test design, the method has the advantages that the number of design groups is reduced on the premise of ensuring that the test combination is as comprehensive as possible, and the time of physical model experiment and numerical simulation calculation is greatly shortened.
Owner:SOUTH CHINA UNIV OF TECH

Waste fishpond ecological restoration method based on ecological corridor

The invention belongs to the technical field of ecological restoration and wetland engineering, and discloses an ecological corridor-based abandoned fishpond ecological restoration method, which comprises the following steps: S1, land forest restoration: planting saline-alkaline tolerant vegetation around an abandoned fishpond and in a land and abandoned fishpond transition area in a layered manner; s2, mangrove forest wetland construction: performing microtopography modification to adjust the bottom mud elevation, and planting mangrove forest plants in a layered manner; s3, ecological corridor construction: constructing an ecological corridor on one side of the abandoned fishpond and the land, and constructing an ecological corridor on one side of the abandoned fishpond and the ocean; s4, ecological monitoring and maintenance: carrying out hydrological, tidal and biological detection regularly; the three-dimensional ecological corridor system of'land forest-mangrove forest wetland-ocean 'is constructed, and the abandoned fish pond is transformed into the mangrove forest wetland, so that not only are biodiversity improvement and ecosystem connectivity realized, but also stable migration and inhabitation space can be provided for terrestrial and aquatic organisms.
Owner:SHENZHEN UNIV +1

Sandy coast back shore ecological restoration multi-objective optimization method based on NSGA-II algorithm

The invention relates to a sandy coast back shore ecological restoration multi-objective optimization method based on an NSGA-II algorithm, and the method comprises the following steps: S1, selecting a damaged sandy coast, carrying out the background investigation, and calculating a wave climbing value; s2, determining a vegetation arrangement range of the damaged sandy coast; s3, beach shoulder sand supplement of beach shoulder width is conducted on different areas of the damaged sandy coast, and sand dune sand supplement of an artificial sand dune is conducted; s4, calculating the wind erosion prevention efficiency and the wave erosion prevention efficiency of the dominant vegetation; s5, constructing a sandy coast back shore ecological restoration multi-objective optimization function and constraint conditions; s6, solving the multi-objective optimization function based on an NSGA-II algorithm to obtain an optimal vegetation configuration scheme set; s7, based on actual conditions, selecting an optimal vegetation configuration scheme for planting; and S8, detecting vegetation data after planting, and starting a reseeding program when the survival rate of vegetation is lower than a threshold value. Compared with the prior art, the method has the advantages that the fitness of the multi-power environment is improved, and then the windproof and wave-resistant effects are optimized.
Owner:TONGJI UNIV

Preparation of salt-resistant nano bentonite-polymer composite material

The invention relates to the field of civil engineering waterproof materials, in particular to a nano bentonite-polymer composite material with high salt tolerance and a preparation method thereof, and the nano bentonite-polymer composite material is especially suitable for a sodium-based bentonite waterproof blanket in a saline soil area or a marine environment, and the preparation method comprises the following steps: (1) preparing nano bentonite lamellar colloidal dispersion liquid; (2) introducing and mixing an electrostatic screening agent and a polymerizable monomer; (3) carrying out in-situ free radical polymerization reaction; and (4) post-treatment and finished product preparation. By constructing a three-dimensional interpenetrating hierarchical structure composed of a covalent grafted polymer network, a physically anchored electrostatic screening agent and a stripped bentonite nanosheet layer, effective protection of a bentonite core anti-seepage unit is realized, so that the adaptability and long-term stability of the material under a complex water quality condition are remarkably improved.
Owner:HANGZHOU HEIDIS NEW MATERIAL CO LTD

Detection and plugging integrated system and method for underwater seepage point of dam

The invention discloses a dam underwater seepage point detecting and plugging integrated system and method, and relates to the field of dam safety maintenance. The dam underwater seepage point detection and plugging integrated system comprises a suspension frame and further comprises a sleeve fixedly connected to the suspension frame; the piston disc is connected in the sleeve in a sliding manner; one end of the spring is fixedly connected with the inner wall of the sleeve, and the other end of the spring is fixedly connected with the piston disc; through the synergistic effect of the sealing air bag, the spring piston disc and the conducting ring warning indicator, efficient and reliable plugging is achieved, the sealing air bag expands to fill gaps, water seepage is isolated, equipment is fixed, and the impact resistance is enhanced through the L-shaped design; the spring is matched with the piston disc, so that the gap is uniformly filled with polyurethane, the piston disc moves to supply air to the air bag, and the whole-course sealing stability is ensured; the conducting ring and the warning indicator feed back the plugging state in real time, diving operation of personnel is avoided, and efficiency and safety are improved.
Owner:上海豫宏(金湖)防水科技有限公司

Gradient composite protective coating for hydraulic concrete and preparation method thereof

The invention provides a gradient composite protective coating for hydraulic concrete and a preparation method of the gradient composite protective coating, and relates to the technical field of protective coatings. The gradient composite protective coating for the hydraulic concrete comprises an isolating layer and a protective layer, the isolating layer is a YEP (Yttrium Ethylene Propylene) toughened epoxy putty isolating layer; the protective layer is a high-performance elastic coating or a high-toughness coating. The base layer concrete, the isolation layer and the protection layer form a rigidity-toughness-elasticity / high-toughness performance gradient in the vertical normal direction of the base plane, and a performance gradient composite coating structure is formed. Wherein the tough isolating layer is used for isolating a water seepage channel of porous concrete, preventing the elastic coating from bulging and cracking, providing a good base surface condition for the elastic coating and blocking surface defects and air holes of the concrete; the elastic coating is used for providing all-around medium isolation protection for concrete and providing functional effects of surface roughness reduction, abrasion resistance and the like for water conveyance projects.
Owner:CHINA INST OF WATER RESOURCES & HYDROPOWER RES +2

Flood bank water stop belt device

The utility model belongs to the technical field of hydraulic engineering construction, and particularly relates to a flood bank waterstop device which integrally adopts a modularized composition structure, a sealing component consisting of a waterstop, a pressing plate and a concrete precast block is movably connected with a vertical retaining wall and a foundation surface of a bottom plate through expansion bolts, the integral installation is convenient, and the construction efficiency is high. And a local water seepage area can be independently installed, and a subsequent water stop belt can be replaced. The method is a good solution to the problem of water seepage caused by cracks at the corner part of the new and old concrete joint surface, and favorable conditions are provided for safe operation and later maintenance of a levee.
Owner:SICHUAN SHUIFA SURVEY DESIGN & RES CO LTD

Underwater stirrer and underwater glue injection system

The invention relates to an underwater stirrer and an underwater glue injection system. The underwater stirrer comprises a driving motor, a stirring barrel, a transmission shaft, blades and a bearing seat, the stirring barrel comprises a barrel body and a cover body used for sealing the barrel body, an avoiding hole is formed in the cover body, one end of the transmission shaft is connected with an output shaft of the driving motor, the other end of the transmission shaft penetrates through the avoiding hole and extends into the barrel body, and a mechanical seal is arranged between the transmission shaft and the cover body. The paddle is connected with the transmission shaft and is positioned in the stirring barrel, the bearing seat is sleeved outside the transmission shaft, one end of the bearing seat is hermetically connected with the cover body, a first sealing element is arranged between the bearing seat and the cover body, the other end of the bearing seat is hermetically connected with the driving motor, and a second sealing element is arranged between the bearing seat and the driving motor. The underwater stirrer is more suitable for underwater construction environments.
Owner:ELECTRIC POWER RES INST CHINA SOUTHERN POWER GRID CO LTD +1

Leaking stoppage and drainage device for water conservancy project management

The utility model provides a leaking stoppage drainage device for water conservancy project management, which comprises a drainage dredging pipe seat, a plugging expansion seat and a controllable valve, the plugging expansion seat and the controllable valve are fixedly arranged on the drainage dredging pipe seat, the controllable valve is communicated with the drainage dredging pipe seat, and the plugging expansion seat is fixedly arranged on the drainage dredging pipe seat. The drainage dredging pipe seat is used for controlling drainage of liquid in the drainage dredging pipe seat; an expansion type plugging and sealing mechanism is adopted, the air bag is rapidly expanded by injecting cement paste, the air bag is tightly attached to a leak, and efficient plugging is achieved. By means of the design, direct contact between internal cement and external water flow is avoided, the scouring influence is reduced, and the durability and reliability of the plugging effect are improved. In addition, the device is high in flexibility and suitable for loopholes of various shapes and sizes, and a powerful guarantee is provided for safe and stable operation of water conservancy projects.
Owner:CHONGQING WATER & ELECTRIC CONSTR CO LTD

Device for repairing underwater structure based on 3D printer and construction method

The invention provides a device for repairing an underwater structure based on a 3D printer, the device comprises a main body bearing frame, a telescopic rod piece is arranged on one side of the main body bearing frame, the other end of the telescopic rod piece is connected with a suction cup used for fixing the device, the 3D printer is arranged in an inner cavity of the main body bearing frame, and a plurality of nozzles are arranged at the output end of the 3D printer. The material input end of the 3D printer is connected with the output end of the grouting equipment through a grouting pipe, the grouting equipment is connected with the vacuum pump, and the lighting equipment is arranged on one side of the main body bearing frame. The device is easy to manufacture, simple to operate and low in cost, and has wide practical significance and application prospects in engineering.
Owner:CHINA THREE GORGES UNIV

Grating plate and dune construction system

The utility model provides a grating plate and a dune construction system. The grating plate comprises a first fixing pile, a second fixing pile and a third fixing pile which are sequentially arranged at intervals in the horizontal direction. Wind blocking nets are arranged between the first fixing pile and the second fixing pile and between the second fixing pile and the third fixing pile respectively. The first fixing pile and the third fixing pile are provided with inclined supporting pieces correspondingly. The second fixing pile is connected with a cable-stayed rope which is connected with a buried pile. The grating plate is simple in structure, convenient to assemble and good in stability; the wind speed of sea wind passing through the grating plate can be reduced, sand carried by the sea wind is naturally accumulated behind the grating plate, and therefore the manual repairing frequency of a sand dune behind the grating plate is reduced, and the manual maintenance cost of the sand dune is reduced. The grating plates can be combined at will, and the flexible and changeable layout effect is achieved.
Owner:BEIJING ZEHO WATERFRONT ECOLOGICAL ENV TREATMENT CO LTD

Novel flexible ecological drainage ditch structure and construction method thereof

The invention discloses a novel flexible ecological drainage ditch structure and a construction method thereof, belongs to the technical field of drainage ditch construction, and solves the problems of serious deformation and cracking of a traditional concrete drainage ditch. The structure specifically comprises an anti-corrosion layer, a drainage layer and an anti-seepage layer. The seepage prevention layer is arranged at the bottom of the drainage ditch, the drainage layer is laid on the seepage prevention layer, and the anti-corrosion layer is laid on the drainage layer. According to the drainage ditch, the innovative design of combining the anti-corrosion layer, the drainage layer and the anti-seepage layer is adopted, so that a lower seepage body is effectively drained, the ditch body strength is improved, the basic requirements of confluence, quick drainage and seepage prevention of the drainage ditch are met, and the overall shear resistance and erosion resistance of the drainage ditch are improved; the construction method is suitable for construction of loose accumulation body slopes such as slide slag accumulation body slopes, waste slag accumulation bodies and mine dumping sites; the method has the advantages of being high in plasticity, high in terrain adaptability, high in environment flexibility, good in structure flexibility and the like.
Owner:TIANFU YONGXING LAB +1

Cascade reservoir flood control water level combined application scheduling method and scheduling system

The invention discloses a cascade reservoir flood control water level combined application scheduling method and scheduling system, and relates to the technical field of cascade reservoir scheduling, and the method comprises the following steps: dividing into a plurality of sub-regions according to an administrative region, determining a sub-reservoir corresponding to each sub-region, and collecting the rainfall and historical flood discharge data; analyzing the water storage capacity of each sub-region at the moment corresponding to the historical data to form a training data set; constructing a flood season flood discharge prediction model, and obtaining the target flood discharge flowing into the sub-reservoir by using the prediction model; analyzing the water level change in the flood season according to the target flood discharge amount, and judging whether scheduling is needed; and if scheduling is needed, determining a drainage flow combination of each sub-reservoir, setting a constraint condition, and performing optimization through a multi-target genetic algorithm to obtain an optimal drainage flow scheme meeting constraints. According to the scheme, the scientificity, the accuracy and the intelligent level of combined dispatching of the cascade reservoirs are remarkably improved.
Owner:GUANGXI TRANSPORTATION SCI & TECH GRP CO LTD

Reservoir leakage detection and repair equipment and method

The invention discloses reservoir leakage detecting and repairing equipment and method, and relates to the field of dam body repairing devices. Reservoir leakage detecting and repairing equipment comprises a repairing liquid storage tank, repairing liquid grouting equipment and a grouting repairing pipe, the repairing liquid storage tank is connected with the liquid inlet end of the repairing liquid grouting equipment, and the grouting repairing pipe is connected with the liquid outlet end of the repairing liquid grouting equipment; the side grouting repair hole is formed in the side face, close to the bottom end, of the grouting repair pipe and communicates with the liquid conveying pipeline in the grouting repair pipe; the multiple sets of air bags are annularly installed on the grouting repair pipe at equal intervals, and the multiple sets of air bags are located on the upper side and the lower side of the side grouting repair hole correspondingly; through the arrangement of the air bag, auxiliary inspection can be carried out on the crack position in the grouting repair hole, meanwhile, the upper space and the lower space of the side grouting repair hole can be blocked, grouting can be conveniently and intensively carried out on part of cracks, and incomplete grouting repair caused by insufficient pressure is reduced.
Owner:上海豫宏(金湖)防水科技有限公司

Repair grouting device for water conservancy construction

The invention relates to the field of grouting equipment, in particular to a repairing and grouting device for water conservancy construction, and provides a repairing and grouting device for water conservancy construction to solve the problems that in the prior art, a constructor needs to insert grouting nails one by one, and construction time is delayed. A placement barrel capable of intermittently rotating is arranged in the shell, a pushing and injecting part capable of moving up and down is arranged on the upper side of the placement barrel, and every time the placement barrel rotates once, the grouting nail, located on the outermost side, of one placement groove corresponds to a pushing barrel, and the grouting nail is pushed out of the placement groove through the pushing barrel; when the device is used, the grouting nails in the placing barrel can be automatically inserted into the grouting holes by operating the control part, the operation step that constructors manually insert the grouting nails into the grouting holes one by one is omitted, manual force application is replaced with mechanical power, and the workload of the constructors is relieved.
Owner:HENAN HUAYUAN WATER CONSERVANCY & HYDROPOWER ENG CO LTD

Hydraulic ECC material and application thereof

A hydraulic engineered cementitious composite (ECC) material and an application thereof are provided. The ECC material includes 25-34 wt % of cement, 23-30 wt % of fly ash, 15-20 wt % of silica fume, 26-32 wt % a fine aggregate, 1.25-1.7% of a composite fiber mesh, 0.1-0.24 wt % of a water reducer, and 0.03-0.07 wt % of a thickener. The composite fiber mesh is prepared by dipping a composite fiber in a water-borne epoxy resin with a curing agent, performing uniform mixing, taking out and spreading the composite fiber, and then cutting or crushing the composite fiber into a small piece of mesh structure; and the composite fiber includes a PVA fiber and a carbon fiber, or a PVA fiber and a basalt fiber, at a weight ratio of (0.3-0.6):1.
Owner:CHANGJIANG RIVER SCI RES INST CHANGJIANG WATER RESOURCES COMMISSION

Laying device applied to slope geomembrane

The utility model discloses a laying device applied to a slope geomembrane, and relates to the technical field of water conservancy projects. The laying device applied to the slope geomembrane comprises an unfolding unit and a laying unit. The unfolding unit comprises a main frame body, and a bearing shaft used for bearing a geomembrane material roller is arranged on the main frame body. The laying unit comprises a traction trolley which can move up and down along the slope by means of self power, and a clamping assembly used for clamping the free end of the geomembrane is arranged on the traction trolley. According to the laying device applied to the slope geomembrane, the geomembrane is laid through dragging of the traction trolley, and position deviation of the geomembrane in the laying process can be avoided.
Owner:SHANDONG DAYU WATER CONSTR GRP CO LTD

Long spiral secant pile construction method for water conservancy anti-seepage complex geological conditions

The invention relates to the technical field of pile foundation construction, in particular to a long spiral secant pile construction method under water conservancy anti-seepage complex geological conditions, and the construction method comprises the steps that a long spiral pile driver is provided with a first power head and a second power head, a sleeve is pressed downwards through the second power head, and then the first power head is used for driving a drill rod to drill; the sleeve and the drill rod drill down synchronously until the drill bit drills to the elevation of the bed rock surface to form a pile hole; the sleeve is left in the pile hole, the rotary drilling rig is used for drilling the bed rock, a drill rod of the long spiral pile driver is put down to the bottom of the pile hole, concrete is pumped into the pile hole, and when the concrete is poured to the bed rock surface, the drill rod and the sleeve are lifted while the concrete is pumped into the pile hole till pressure pouring is completed. In a complex stratum with a huge thick loose high-permeability sandy gravel covering layer and ultrahigh-strength hard bed rock coexisting, high-precision stable hole forming and collapse prevention are achieved at the same time, hard rock is reliably and accurately drilled to reach the designed depth, and it is ensured that concrete secant piles are tightly engaged to form a continuous and effective diaphragm wall.
Owner:JIANGXI ZHONGHENG UNDERGROUND SPACE TECH CO LTD

Quick-setting high-strength expansive type leakage crack plugging material and method and application of rapid-setting high-strength expansive type leakage crack plugging material

The invention discloses a quick-setting high-strength expansive type leakage crack plugging material and method and application, and belongs to the technical field of cement-based material admixtures, the quick-setting high-strength expansive type leakage crack plugging material is prepared by adopting a mixing method, and the quick-setting high-strength expansive type leakage crack plugging material comprises a base material formed by compounding cement, desulfurized gypsum, calcium oxide, alkaline aluminum oxide, calcium formate, hydrated calcium silicate, carboxyl cellulose and a solid polycarboxylate superplasticizer; the active component is formed by compounding polyaluminum sulfate, magnesium sulfate, disodium ethylene diamine tetraacetate, borax and a defoaming agent; the superfine fly ash, the superfine silicon dioxide, the superfine hydroxyapatite, the superfine zinc sulfate, the nano titanium dioxide and the superfine boron nitride are compounded to form a structure regulating functional component. The three components are uniformly stirred by adding water, and then are mixed with an exciting agent to be used for plugging leakage cracks and filling gaps. The leakage plugging material provided by the invention has the advantages of scientific and reasonable composition, simple preparation and application methods, rapid curing, high strength, good durability, micro-expansion and the like, and has good plugging and filling effects on water bursting, water permeation and gas.
Owner:SHAANXI UNIV OF SCI & TECH