Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

12898results about "Foundation engineering" patented technology

Foundation pit engineering dewatering and drainage time-division and area-division intelligent start-stop low-carbon efficient water pumping system

The invention relates to the technical field of civil engineering, in particular to a foundation pit engineering dewatering and drainage time-division and area-division intelligent start-stop low-carbon efficient water pumping system which comprises a meteorological data analysis module, a water level detection module, a real-time trend analysis module, an operation parameter adjustment module, a control module and a water pumping module. According to the method, the water level change trend is predicted in advance by analyzing real-time meteorological and environmental data, dynamic adjustment of the start and stop time and the operation frequency of the water pump is achieved, energy consumption is reduced, water level abnormity caused by untimely response is reduced, the water levels of multiple positions are monitored, remote real-time regulation and control are combined, start and stop of the water pump are controlled, and the water level monitoring accuracy is improved. Engineering delay and structural damage caused by improper drainage are reduced, the accuracy and efficiency of construction site water management are ensured, invalid operation and excessive power consumption of a water pump are reduced by analyzing water levels and water pump control information of multiple positions, the engineering efficiency is improved, the environment is protected, and the influence on an ecological system is reduced.
Owner:SICHUAN CHUANJIAN GEOTECHNICAL SURVEY & DESIGN INST

Method for evaluating grouting water control effect of underground water-sealed cavern project

The invention provides a method for evaluating the grouting water control effect of an underground water-sealed cave depot project. The method comprises the steps that firstly, grouting and geological parameters and hydrological monitoring data of a project area are obtained; establishing a three-dimensional seepage-grouting coupling model, and simulating the dynamic state of a seepage field by using a finite element analysis algorithm; then calculating the equivalent permeability change rate of the grouting affected zone based on a simulation result; constructing an evaluation index system, and performing quantitative evaluation by using a fuzzy comprehensive evaluation algorithm; and finally, generating a grouting parameter dynamic adjustment scheme according to an evaluation result. According to the method, scientific and accurate evaluation and engineering optimization of the grouting water control effect can be achieved, and the safety and economical efficiency of engineering are improved.
Owner:CHINA ANENG GRP FIRST ENG BUREAU CO LTD

Ecological concrete construction device and method for water conservancy river and lake treatment

The invention discloses an ecological concrete construction device and method for water conservancy river and lake treatment, and relates to the technical field of river and lake treatment. By arranging the variable-pitch assembly, the positions of the multiple guniting head mechanisms can be flexibly adjusted at equal intervals at the same time through a first spiral groove, a second spiral groove, a third spiral groove and a fourth spiral groove according to river bank protection slopes with different widths, so that the positions of the multiple guniting head mechanisms can be close to or away from one another at the same time; therefore, the guniting head mechanism can be uniformly distributed on the river bank protection slopes with various widths, the river bank protection slopes are completely covered with ecological concrete slurry, the transverse coverage range of guniting is increased, and the construction efficiency is improved on the premise that the position of the ecological concrete construction device is not repeatedly adjusted. The effect that the whole slope protection surface can be completely covered by spraying the ecological concrete once is achieved, it is ensured that all unsprayed areas are filled, the operation complexity is reduced, the construction period is shortened, and the overall construction efficiency is improved.
Owner:JIAOZUO HUANGHE HUALONG ENG CO LTD

Gravel foundation bed leveling device and method suitable for shallow water area

The invention belongs to the technical field of foundation bed leveling, and particularly relates to a gravel foundation bed leveling device and method suitable for a shallow water area. The gravel foundation bed leveling device comprises a leveling frame, a measuring device, an adjusting device and a scraper, the leveling frame comprises two longitudinal beams and a plurality of cross beams, and a leveling bin is formed between every two adjacent cross beams; the measuring device comprises four measuring rods detachably connected to the four corners of the leveling frame, and positioning equipment is installed at the top ends of the measuring rods. The adjusting device comprises four height adjusting screw rods and four screw sleeves, the four screw sleeves are arranged near the four measuring rods and fixedly connected into the leveling frame, and the height adjusting screw rods are connected into the screw sleeves in a one-to-one threaded mode and penetrate through the leveling frame; the two ends of the scraper in the length direction are detachably connected to the top faces of the cross beams on the two sides of the leveling bin in a pressed mode respectively. The novel leveling device is provided for manual leveling of the gravel foundation bed in the shallow water area, and the leveling precision of the gravel foundation bed in the shallow water area can be improved.
Owner:CCCC FIRST HARBOR ENGINEERING CO LTD +1

Breakwater for reducing long-period waves based on water wave resonance principle

ActiveCN119021145AReduce long period wavesincrease the areaBreakwatersClimate change adaptationWave baseWavelength
The invention relates to the technical field of coast engineering, and discloses a breakwater for reducing long-period waves based on a water wave resonance principle, the breakwater comprises a C-shaped resonator and a plurality of pile legs, a base is connected between the C-shaped resonator and the plurality of pile legs, the C-shaped resonator is detachably connected with the upper end of the base through a bolt, and the C-shaped resonator is detachably connected with the lower end of the base through a bolt. The multiple pile legs are circumferentially distributed at the lower end of the base, the base, the C-shaped resonators and the multiple pile legs jointly form a wave absorbing unit, the wave absorbing units are arranged in a rectangular array to form the breakwater, the outer diameters, the inner diameters and the opening sizes of every two adjacent C-shaped resonators in the array gradually change according to a certain rule, and the C-shaped resonators are of a structure with large cavities and small openings. The method comprises the following steps of: inducing resonance to subtract a long wave which is several times of the wavelength of a cylindrical characteristic size, enabling waves with different frequencies to generate local resonance wave absorption at different spatial positions of the array type breakwater, effectively subducting long-period waves in a wide-frequency domain range, and forming a sheltering water area which is stable in operation behind the breakwater.
Owner:DALIAN UNIV OF TECH

Cavity type mixed tower fan foundation template construction method

The invention discloses a cavity type mixed tower fan foundation formwork construction method. Comprising the steps of cushion layer pouring, pay-off, cavity foundation slab steel bar binding, annular support system erecting, foundation lower inner formwork supporting and inner support frame body arranging, cantilever anchoring end bottom formwork frame body supporting, cantilever anchoring end bottom formwork installing, foundation upper inner formwork supporting and inner support arranging, anchor backing plate and prestressed pipe installing, steel bar binding and annular support system erecting. And a foundation outer formwork is installed. Compared with the prior art, formwork erecting is formed at a time, a foundation is integrally poured, and the overall construction quality is guaranteed; the problem of leakage caused by two-time pouring of a construction joint part is avoided, water stop steel plates are reduced, and materials are saved; the inner supporting frame bodies are radially arranged with the center of the circle and the center of the stand column as a supporting point, and structural stress is reasonable. The supporting frame body is simple in structure, neat, attractive, reasonable in stress and easy to operate, the center stand column is recycled, and construction is efficient.
Owner:CHINA MCC22 GROUP CORP LTD

Pulse intelligent grouting control method and system

The invention provides a pulse intelligent grouting control method and system, and relates to the technical field of civil engineering, according to the pulse intelligent grouting control method and system, measuring point displacement data in a construction site is obtained in real time and used for establishing an optimal grouting parameter prediction analysis model, grouting parameters are incorporated into a finite element model, the fitness of each group of parameters is calculated, and the optimal grouting parameter prediction analysis model is obtained. A combination with the highest fitness is selected as an optimal grouting parameter, a pulse intelligent control technology is utilized, a grouting pulse index is comprehensively generated, a pulse threshold value is set, and when the grouting pulse index exceeds the threshold value, a system automatically stops grouting, so that accurate control over the grouting process is achieved. According to the method, through the grouting parameter analysis model, the optimal value of the grouting fitness is calculated, and the grouting parameters are optimized, so that accurate control and optimization of the grouting process are realized.
Owner:CHINA UNIV OF MINING & TECH

Control system for stabilizing equipment foundation embedded part mounting device

The invention relates to a control system for stabilizing an equipment foundation embedded part mounting device. Comprising the following steps that a dynamic sensing network is arranged on an embedded part mounting device, comprises a tilt angle sensor, a pressure sensor and a displacement sensor and is used for monitoring the dynamic balance state of the embedded part in real time and obtaining monitoring data; the monitoring data are integrated through the central processing unit to form real-time three-dimensional attitude and gravity center position feedback of the equipment foundation; constructing a posture adjustment algorithm based on real-time monitoring data, simulating mechanical changes in the installation process of the embedded part by utilizing a finite element dynamic analysis model, and calculating an adjustment angle and a position deviation; the inclination angle and height of the mounting platform are finely adjusted through an electric servo device, and self-adaptive posture regulation and control of the embedded part are controlled; a partition pressure control technology is adopted, the bottom of the mounting device is divided into a plurality of mechanical unit areas, and the supporting force of each area is adjusted in real time through a distributed pressure regulator; and dynamic balance monitoring data is combined.
Owner:XINJIANG POWER TRANSMISSION & TRANSFORMATION ENG

Mooring system

Anchoring system for floating platform (100) that eliminates pitching and rolling movements of the floating platform (100), by means of several anchoring lines (200) attached to the seabed (5), which are supported by several rotary fixing means (2, 3) or pulleys of the floating platform (100) and are all joined together in a common counterweight (1) hanging from the platform (100). Each anchoring line (200) comprises sublines (200d, 200c) (direct, crossover or diagonal), which keep the counterweight (1) always in correspondence with the central axis (300) of the floating platform (100). It also eliminates the pendulum movement of the counterweight (1) and is valid for floating platforms (100) with an odd number of protruding structural arms (12). The system is applicable to any type of floating platform (100), although it is particularly suitable for floating platforms that support offshore wind turbines and marine leisure platforms.
Owner:GAZELLE WIND POWER LTD

Foundation pit drainage structure and drainage method thereof

The invention provides a foundation pit drainage structure and a drainage method thereof, and relates to the technical field of foundation pit drainage. Comprising a base plate, a fixing ring is arranged above the base plate, a filter cartridge is arranged between the base plate and the fixing ring, a cross-shaped support is fixedly arranged in the middle of the inner ring face of the filter cartridge, an outer cartridge is inserted into the middle of the cross-shaped support, a transverse plate is fixedly arranged in a top end opening of the fixing ring, an inner cartridge is arranged in the middle of the transverse plate, and the bottom end of the inner cartridge is slidably inserted into a top end opening of the outer cartridge; a side plate is fixedly arranged on the right side of the top face of the transverse plate, and a drainage pump is installed on the top of the side plate. The problem that an inlet of a foundation pit drainage structure is prone to being blocked during foundation pit drainage is solved, the foundation pit drainage structure is suitable for foundation pit drainage operation under different working conditions, the blocking risk is avoided, the foundation pit drainage capacity is improved, smooth foundation pit drainage and normal construction are guaranteed, and the foundation pit drainage efficiency is improved.
Owner:SHANXI WATER CONSERVANCY CONSTR ENG BUREAU

Artificial stratum freezing engineering monitoring and early warning method and system based on digital twinning

The invention discloses an artificial stratum freezing engineering monitoring and early warning method and system based on digital twinning, and relates to the field of underground engineering. According to the method, the three-dimensional geometric structure of an artificial stratum freezing engineering site, freezing pipe arrangement, the preset temperature of freezing liquid and stratum physical and mechanical parameters are calculated according to the three-dimensional geometric structure, the freezing pipe arrangement, the preset temperature of freezing liquid and the stratum physical and mechanical parameters; the stratum thermophysical parameters serve as the actual situation of the freezing project and are input into the numerical model, and prediction data of all positions of an artificial stratum freezing project site within preset time are output; determining the numerical model as a trained numerical model based on the preset value, the prediction data and the real temperature of the rock-soil body monitored at each temperature measurement point in real time; based on the trained numerical model, determining target prediction data of each position of the artificial stratum freezing engineering site within a preset time; based on the target prediction data, determining a freezing result of the on-site artificial stratum freezing project; and according to the freezing result and a preset deformation standard, determining an abnormal freezing result and carrying out early warning. And the monitoring and early warning efficiency of the freezing effect is improved.
Owner:TONGJI UNIV

Concentric circle filling device and application method in mass concrete crack control

The invention provides a concentric circle filling device and an application method in mass concrete crack control, and belongs to the technical field of hydraulic structures. The concentric circle filling device comprises a pipe body structure, the pipe body structure comprises an outer pipe body and an inner pipe body, the outer pipe body and the inner pipe body are coaxially arranged in a sleeved mode, and an annular area between the outer wall of the inner pipe body and the inner wall of the outer pipe body serves as a first storage space; an inner cavity of the inner tube body serves as a second storage space; the inner tube body is sleeved with an inflatable annular air bag, and when the annular air bag is not inflated, the annular air bag can slide up and down along the inner tube body; after the annular air bag is inflated, one end of the first storage space can be completely sealed and plugged; an air bag ball is arranged in the inner tube body, and after the air bag ball is inflated, one end of the second storage space can be completely sealed and plugged. The method is implemented based on the concentric circle filling device and is applied to mass concrete crack control. Cracks generated by the gate pier can be effectively controlled, and meanwhile the integrity of the structure is improved.
Owner:SHANDONG JIAOTONG UNIV +1

Formwork embedded type dam face permanent heat preservation protection module and prefabrication and construction method

The invention discloses a template embedded type dam face permanent heat preservation protection module and a prefabrication and construction method. Comprising a heat preservation core layer, a facing anti-seepage protection layer is arranged on the side, close to a concrete pouring formwork, of the heat preservation core layer, an internal pressure-bearing protection layer is arranged on the side, close to dam surface layer crack limiting steel bars, of the heat preservation core layer, and a thermal broken bridge supporting keel is arranged in the heat preservation core layer; an anchoring device is arranged in the area between the internal pressure-bearing protection layer and the dam surface layer crack limiting steel bars. The modular prefabrication and construction method is adopted, the prefabrication and installation method of a single module is simple and efficient, details such as anchoring protection measures are fully considered, the engineering construction operability is high, convenience and high efficiency are achieved, and the construction time of the heat preservation layer is greatly saved.
Owner:YICHANG TIANYU TECH CO LTD

Deepwater double-wall steel cofferdam and sinking construction method thereof

The invention provides a deepwater double-wall steel cofferdam and a sinking construction method thereof. The sinking construction method comprises the steps of factory prefabrication and processing of double-wall steel cofferdam blocks, field hoisting and splicing, sinking and implantation of the steel cofferdam, deviation correction and deviation correction of the steel cofferdam, concrete pouring in a wall cavity, bottom sealing concrete pouring and internal cleaning of the steel cofferdam. Precise machining of steel cofferdam components can be achieved, the difficulty during assembly is reduced, the sinking efficiency and control precision of the cofferdam are improved, the method can be suitable for the complex underwater environment, and the stability and bearing capacity of the cofferdam structure under deep water can be guaranteed.
Owner:HANGZHOU JIANGRUN TECH LIMITED

Layered grouting apparatus and grouting method

Provided are a layered grouting apparatus and a grouting method. The layered grouting apparatus comprises: a slurry conveying unit and a grouting pipe (10), a plurality of slurry outlet holes (102) being provided on a side wall of a pipe body of the grouting pipe (10) in an axial direction, and a plurality of snap-fit rings (101) being provided on an inner wall of the pipe body of the grouting pipe (10) in the axial direction. The slurry conveying unit is selectively fastened to various depths of the grouting pipe (10) on the basis of structures of the snap-fit rings (101) and inputs a concrete slurry into the grouting pipe (10). Layered grouting of a region to be constructed is implemented by means of the slurry outlet holes (102). According to the described apparatus, reserved snap-fit rings (101) are designed for the grouting pipe (10), and a first support rod (2), a second support rod (4), a first support plate (1), a second support plate (5), and a grouting ring (3) form an expandable support frame, to then be combined with a grouting rubber airbag (6) and a slurry conveying pipe, thus the apparatus can be reused, ensuring the filling degree of each layered grouting, while uneven pressure relief in a grouting process can be effectively limited, thereby ensuring the quality of layered grouting.
Owner:CHINA MCC5 GROUP CORP LTD

Method for constructing a ribbed foundation for wind turbines and ribbed foundation obtained

Disclosed is a method comprising: placing a central steel ferrule (2) on a central reinforcement mesh (1); installing around the central ferrule (2) a central assembly (3) and prefabricated pieces (4, 5) comprising a concrete beam (4) and a steel strut (5); assembling (61) sections between the bases (43) of the beams (4), and filling in (62) the central assembly (3); installing formwork (71, 72, 73) around the central assembly (3), the infill (62) and the outer perimeter; and obtaining, by means of simultaneous concreting, a monolithic concrete foundation (10) in which the ends of the struts are embedded, thus forming the ribbed foundation.
Owner:INGECID INVESTIGACION Y DESARROLLO DE PROYECTOS SL

Construction method of environment-adaptive drainage device based on intelligent control

The invention relates to the technical field of drainage device construction, in particular to a construction method of an environment-adaptive drainage device based on intelligent control, and the method comprises the steps: collecting three-dimensional data of a to-be-installed area, carrying out analysis based on model construction, and determining a plurality of initial installation areas; dividing any initial installation area to obtain a plurality of initial installation sub-areas, collecting actual soil data, calculating an installation score, and selecting an actual installation area; acquiring historical environment data, and determining initial installation data based on an analysis result; constructing an installation model based on the plurality of actual installation areas and the plurality of initial installation data, performing a stability test on the installation model, adjusting the actual installation areas and the initial installation data based on a stability test result, and obtaining a target installation area and target installation data; and the drainage device is installed according to the multiple target installation areas and the corresponding target installation data, and drainage device construction of the area to be installed is completed. The accuracy of construction and installation is improved.
Owner:THE GUANGDONG NO 3 WATER CONSERVANCY & HYDRO ELECTRIC ENG BOARD CO LTD

Old wind power plant fan foundation small-to-large capacity increasing structure and transformation construction method

The invention discloses an old wind power plant fan foundation small-to-large capacity increasing structure and a transformation construction method. The old wind power plant fan foundation small-to-large capacity increasing structure comprises an original fan foundation, a newly-poured reinforced concrete foundation, a vertical anchor bolt cage connecting system and a radial anchor bolt connecting system. The connecting structure of the bottom section of the new fan tower drum and the new fan foundation comprises a vertical anchor bolt cage connecting system and a radial anchor bolt connecting system. The vertical anchor bolt cage connecting system is fixed in the original fan foundation, and the radial anchor bolt connecting system is fixed in the newly-poured reinforced concrete foundation. According to the new fan foundation, the diameter of the middle pier is expanded so as to arrange a new tower tube, the height of the middle pier is not changed, the height of the middle pier of the newly-poured foundation almost does not need to be increased, and the using amount of concrete is greatly reduced. Meanwhile, according to the structure, an original vertical anchor bolt cage connecting system is reserved, a radial anchor bolt connecting system is adopted for enhancing connection between the bottom section of the fresh air fan tower barrel and the fan foundation, the transformation cost and the connection reliability are effectively controlled, and the maximization of reutilization of the original fan foundation and the controllability of the cost of the fresh air fan foundation are achieved.
Owner:POWERCHINA HUADONG ENG CORP LTD

Foot pad for submerged machinery

A foot pad removably attachable to a machine and that Fluid Level supports the machine for operation in a fluid. The foot pad includes a support frame, a skirt coupled to the support frame, a bellows coupled to the skirt, a plenum arranged to move within the skirt, a seal between the plenum and the skirt, and a flexible bellows that allows the foot pad to be secured to, or within, a substrate. The skirt includes an edge that can be embedded in a penetrable substrate. The plenum is configured to pump the fluid into or out of a volume formed by a space below the plenum, the interior of the skirt, and the substrate, thus compressing or decompressing the fluid in the space inside the skirt. The foot pad may also include a rolling, flexible diaphragm to seal the space between the plenum and the skirt, wherein the rolling diaphragm minimized the wear compared to other seal mechanisms. The flexible bellows may include a set of radial ridges that aid in sealing the footpad to the substrate.
Owner:STATIONKEEP LLC

Cement-based underwater repair material and preparation method thereof

The invention discloses a cement-based underwater repair material and a preparation method thereof, and relates to the technical field of inorganic nonmetallic materials, and the cement-based underwater repair material is prepared from the following components in parts by weight: 85-94 parts of cement, 4-10 parts of acrylamide, 1.5-3.5 parts of an initiator, 0.01-0.03 part of a cross-linking agent and 0.8-1 part of an anti-scouring agent. The cement-based underwater repair material has the effect of improving the impact resistance of the repair material while improving the binding power of the cement-based underwater repair material to an underwater damaged structure.
Owner:WUHAN UNIV

Jacket foundation and jacket foundation construction method

The invention belongs to the technical field of offshore wind power generation, and discloses a jacket foundation and a jacket foundation construction method. The jacket foundation comprises a main frame body and a supporting structure, the main frame body comprises at least three supporting legs, the at least three supporting legs are arranged around a fan tower barrel, each supporting leg comprises a plurality of connecting sections arranged in the length direction, a first connecting part is connected between every two adjacent connecting sections, the connecting section on the topmost layer is used for being connected with the fan tower barrel, and the connecting section on the topmost layer is used for being connected with the fan tower barrel. The bottommost connecting section is used for being connected with a steel pipe pile fixed to the seabed. The supporting structure is arranged between every two adjacent supporting legs in the direction surrounding the fan tower barrel, the supporting structure comprises a plurality of supporting rod sets arranged in the height direction, the supporting rod sets are connected with the first connecting parts of the supporting legs on the two sides, first pouring spaces are formed in the first connecting parts, and the first pouring spaces are filled with grouting materials. The jacket foundation has high impact-shear bearing capacity and fatigue resistance, and safety and stability of fan operation are improved.
Owner:CHINA RESOURCES POWER TECH RES INST CO LTD

Segmented detecting and filling method and device for cracks of underwater concrete panel in deepwater area

The invention discloses a deepwater area underwater concrete panel crack segmented detection filling method and device, the device comprises a robot main body, the robot main body is provided with an image acquisition system, a propulsion system and a detection operation system, the segmented detection operation system comprises an adsorption part; the segmented assembly cover is arranged on one side of the robot main body and is connected with the robot main body through telescopic equipment I; an observation and communication system is arranged on the outer wall of the assembly part; and the filling part is arranged on the outer wall of the assembling part. An adsorption part in the segmented detection operation system is matched with a segmented assembly cover, so that a robot main body is fixed on a concrete panel to segment the concrete panel, and finally, cracks on the concrete panel in a segmented area are comprehensively detected through a driving mechanism, an assembly part and an observation and communication system; the method has the advantages of higher detection precision, high detection efficiency, high detection result reliability, low labor intensity and the like.
Owner:NANJING HYDRAULIC RES INST

Water conservancy project foundation pit tube well combined light well point dewatering and drainage structure and method

The invention relates to the technical field of foundation pit dewatering systems, in particular to a hydraulic engineering foundation pit tube well combined light well point dewatering and drainage structure and method.The structure comprises a plurality of light well points, each light well point comprises an outer tube and an inner tube, and a sand intercepting mechanism is arranged at the bottom of each inner tube; the sand intercepting mechanism comprises a mounting cylinder, a first filter screen, a second filter screen, a water inlet and a control assembly, sand is filtered through the first filter screen, and after the first filter screen is blocked, the first filter screen is driven to move through the control assembly, so that the first filter screen changes the volume in a blocking cavity; the first filter screen extrudes water flow to achieve self-cleaning of the first filter screen, meanwhile, gravel is filtered through the second filter screen, the gravel intercepting mechanism can continuously intercept the gravel in underground water, it is avoided that the gravel enters the inner pipe, and consequently a water suction pump is damaged, and the problem that the gravel is accumulated on the first filter screen, so that the water suction pump is damaged is solved. And the problem that underground water cannot be pumped by the inner pipe is solved, and the burden of workers is relieved.
Owner:GUANGDONG DAYU WATER CONSERVANCY CONSTR CO LTD

Device for the precise alignment and connection of a central section of a jacket foundation structure for offshore wind turbines

Device for the precise alignment and connection of a central section of a jacket foundation structure for offshore wind turbines (100) or of a tubular frame for offshore wind turbines (100), characterized in that the device comprises the following: - a first connecting block (1) wherein the first connecting block (1) is provided with a through first threaded hole (101) and a through second threaded hole (102); - a second connecting block (2), wherein the second connecting block (2) is provided with a third threaded hole (201) and a fourth threaded hole; wherein the axis of the second threaded hole (102), the axis of the third threaded hole (201) and the axis of the fourth threaded hole are all arranged parallel to the axis of the first threaded hole (101), wherein the axis of the first threaded hole (101) and the axis of the third threaded hole (201) are coincident and have the same hole diameter, wherein the axis of the second threaded hole (102) and the axis of the fourth threaded hole are coincident and have the same hole diameter; wherein the first connecting block (1) can move away from or towards the second connecting block (2) along the axis of the first threaded hole (101);When the first connecting block (1) approaches the second connecting block (2), a first clamping channel (8) is formed by the enclosure, and the first clamping channel (8) serves to clamp a pipe; - a first threaded column (3), wherein the first threaded column (3) is guided through the first threaded hole (101) and screwed to the third threaded hole (103); - a second threaded column (4), wherein the second threaded column (4) is guided through the second threaded hole (102) and screwed to the fourth threaded hole; - a first drive wheel (5), wherein the first drive wheel (5) is rigidly connected to the end of the first threaded column (3) facing away from the second connecting block (2); - a second drive wheel (6), wherein the second drive wheel (6) is rigidly connected to the end of the second threaded column (4) facing away from the second connecting block (2); - a drive belt (7), wherein the drive belt (7) is placed around the first drive wheel (5) and the second drive wheel (6), and wherein the rotation of the first drive wheel (5) or the second drive wheel (6) sets the other in rotation by means of the drive belt (7); - a mounting plate (11), wherein a surface of the first connecting block (1) facing the mounting plate (11) is provided with a guide groove (111), wherein the guide groove (111) runs parallel to the axis of the first threaded hole (101), wherein the surface of the first connecting block (1) facing the mounting plate (11) is provided with a sliding element (103), and wherein the sliding element (103) is slidably connected in the guide groove (111); and - a lateral extension plate (15), wherein the lateral extension plate (15) is connected to the mounting plate (11).
Owner:CHINA THREE GORGES CORPORATION

Earthquake and geology fusion-based mine water prevention and control risk early warning method and system

The invention provides a mine water prevention and control risk early warning method and system based on earthquake and geology fusion, and belongs to the field of soil layer or rock drilling, the method comprises the steps that real-time earthquake data of an earthquake monitoring module and geological exploration data of a geological exploration module are received, and the geological exploration module comprises a drilling detection module and a hydrogeological analysis module; based on the real-time seismic data, the geological exploration data and a preset water prevention and control risk early warning model, obtaining a risk level including a risk level and a corresponding water prevention and control execution measure; triggering target execution equipment such as drilling equipment to perform prevention and treatment according to execution measures; drilling a monitoring hole and arranging an optical fiber osmometer to collect osmotic pressure data at a first risk grade; at the second risk level, grouting plugging is conducted on the crack drilling grouting holes; constructing a water guide hole in the aquifer at the third risk level, and guiding underground water to a safe area through a drainage pump group. According to the method, multi-source data are fused to realize graded accurate early warning and prevention.
Owner:INNER MONGOLIA HUANGTAOLEGAI COAL CO LTD SHI LIN CHEM BRANCH

Structure capable of controlling large-volume water gate crack and construction method thereof

The invention provides a structure capable of controlling a large-volume water gate crack and a construction method thereof, and belongs to the technical field of water gates. The structure comprises a gate bottom plate and a gate pier which are formed by pouring concrete, and the gate pier is arranged above the gate bottom plate; hole cavities are at least formed in the gate piers and reserved in the concrete pouring process. The hole cavity is used as a self-constrained stress hole; and the tough material is used for absorbing stress, is filled in the pore cavity and is connected with the inner wall of the pore cavity. The method comprises the steps of S1, construction preparation; s2, foundation treatment; s3, gate bottom plate construction; s4, gate pier construction: S41, construction lofting; s42, gate pier reinforcing steel bars are bound and installed; s43, a gate pier formwork is erected above the gate bottom plate; s44, a hole forming device is installed at the designed position; s45, concrete pouring, vibrating and curing are conducted; and S46, after initial setting of the concrete, the hole forming device is pulled out of the pipe, and a formed hole cavity is filled with a tough material. The sluice pier crack can be effectively controlled, and the use durability and safety of the sluice are improved.
Owner:SHANDONG JIAOTONG UNIV +4

Land wind power fan foundation structure and construction method thereof

The invention relates to the technical field of land fan foundations, and discloses a land wind power fan foundation structure and a construction method thereof.The land wind power fan foundation structure comprises a prefabricated outer framework with the narrow upper portion and the wide lower portion, and a prefabricated bottom anti-inclination assembly comprises a bottom cylinder arranged in a counter bore in the middle of a foundation pit and a reinforcing framework fixed to the bottom cylinder; the top of the prefabricated top base framework is located at the top of the prefabricated outer framework, the middle of the prefabricated top base framework is located in the prefabricated outer framework, and the bottom of the prefabricated top base framework is connected with the reinforcing framework in a positioning and clamping mode, so that the prefabricated outer framework, the prefabricated bottom anti-inclination assembly and the prefabricated top base framework are combined into a whole; through the combined design of the prefabricated outer framework, the prefabricated bottom anti-inclination assembly and the prefabricated top base framework, the foundation structure high in integrity and stability is formed. The connection mode of all the components can effectively resist lateral force and overturning moment, and safe operation of the fan tower drum is ensured.
Owner:GUZHEN BRANCH OF CGN NEW ENERGY ANHUI CO LTD

Concrete regulation and control system and method integrating heat recovery, spraying and gradient control

The invention provides a concrete regulation and control system and method integrating heat recovery, spraying and gradient control, and relates to the technical field of concrete curing, and the concrete regulation and control system comprises a temperature sensing element and a humidity sensing element which are mounted on reinforcing steel bars in a concrete structure in a layered manner in the depth direction; the cooling water circulating system comprises a water pump and a cooling water pipe, and the cooling water pipe is arranged in the mass concrete structure and externally connected with a variable frequency circulating pump; the double-water-tank system is matched with the heater to realize graded regulation of water temperature; the automatic spraying system is connected with the integrated electric heating module; the heat recovery and circulation assembly is connected with an outlet of a cooling water pipe in the concrete, recovers concrete hydration heat brought out by the cooling water pipe, and transfers heat of high-temperature cooling water with the temperature being 50 DEG C or above to the phase change heat storage tank; the central control unit continuously receives and records monitoring data of the temperature sensor and the humidity sensor and analyzes the monitoring data in real time, and when the temperature gradient or the humidity gradient exceeds the limit, a gradient field control instruction is automatically triggered to achieve energy efficiency maximization.
Owner:SHANGHAI NANHUI BUILDING ENG LTD +1

A method and device for installing an offshore wind power suction tube pipe frame

The present invention relates to the technical field of offshore engineering facilities, and in particular to an offshore wind power suction tube conductor frame installation method and device. Lifting points are respectively arranged at opposite ends of a lying conductor frame body. By controlling the lifting speed of each lifting point, the conductor frame body is flipped over to an upright state, thereby facilitating the installation of the suction tube body and the conductor frame body. After the installation, the two can be directly transported vertically, solving the major problems of traditional three-pile suction tube conductor frame construction process and equipment investment. The initial investment of the entire device is about 25 million, which is far lower than the initial investment of nearly 200 million of super-large gantry crane equipment; and there is no need to tension cable wind ropes, so the impact on the site is minimized; the foundation treatment is simple, the overall stability is good, and the economic benefit is high; the requirements of horizontal construction of the upper conductor frame and overall turning over, lifting and splicing are met, the horizontal construction of the upper conductor frame can be realized, the construction accuracy and construction efficiency are improved, and the risk of high-altitude operations is reduced.
Owner:FUJIAN MAWEI SHIPBUILDING