Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

6819 results about "Water pumping" patented technology

The pumping of water is a basic and practical technique, far more practical than scooping it up with one's hands or lifting it in a hand-held bucket. This is true whether the water is drawn from a fresh source, moved to a needed location, purified, or used for irrigation, washing, or sewage treatment, or for evacuating water from an undesirable location. Regardless of the outcome, the energy required to pump water is an extremely demanding component of water consumption. All other processes depend or benefit either from water descending from a higher elevation or some pressurized plumbing system.

Construction process of offshore bridge high-rise pile platform

Disclosed in the present invention is a construction process of an offshore bridge high-rise pile platform. A cofferdam of a steel-concrete structure is used for construction. The cofferdam consists of a cofferdam bottom plate prefabricated by means of reinforced concrete and a steel side formwork. The construction process comprises the following stages: a preparation stage, a cofferdam mounting stage, a cofferdam lowering stage, a cofferdam bottom plate blocking and water pumping stage, and a platform concrete pouring stage. The preparation stage comprises the following steps: pile foundation casing sinking, cast-in-place pile construction, pile foundation casing pile head trimming, cofferdam bottom plate and skirt plate prefabrication, and steel side formwork manufacturing. The cofferdam mounting stage comprises: first, mounting the cofferdam bottom plate, and then mounting the steel side formwork, wherein the cofferdam bottom plate is mounted by means of suspension hangers, and each suspension hanger comprises a pile cap, an inverted hanging beam, and two first finish-rolled twisted steel bars. The cofferdam lowering stage comprises mounting a jack lowering system on the cofferdam bottom plate, wherein the cofferdam lowering system comprises I-shaped hangers, carrying pole beams, center hole jacks, and steel strands. The construction process of the present invention can greatly reduce the construction difficulty and can improve the construction efficiency.
Owner:CCCC THIRD HARBOR ENGINEERING CO LTD +1

Multi-target well group precipitation optimization calculation method based on intelligent algorithm

The invention discloses a calculation method for multi-target well group precipitation optimization based on an intelligent algorithm. The calculation method comprises the following steps: constructing a foundation pit precipitation seepage-settlement mathematical model in a research area; performing parameter assignment and parameter correction on the model; establishing a target function; establishing a judgment matrix; determining each sub-target weight of the target function according to the judgment matrix to obtain a final target function, forming an optimization solution algorithm by the final target function and the genetic algorithm, and coupling the optimization solution algorithm with the established MODFLOW underground water foundation pit rainfall seepage-settlement mathematical model through Flopy to obtain a target function model. And the optimization solution algorithm continuously reads MODFLOW simulation results and performs iterative calculation until an optimization target is achieved. According to the method, the functions of opening and closing of the well, the single well water pumping amount and the like can be automatically optimized, a corresponding solution set is given, the influence of foundation pit dewatering construction on the environment is effectively reduced, the construction cost is reduced, and a new technical means is provided for modern foundation pit well group dewatering design.
Owner:HOHAI UNIV

Water lifting device for pet water dispenser and pet water dispenser

The present invention relates to the technical field of pet appliances, and in particular, to a water lifting device for a pet water dispenser and a pet water dispenser. The device includes a housing, a stirring assembly, and a driving assembly. The housing is provided with a lifting inner cavity with a lower side being a water inlet portion and an upper side being a water outlet portion, and the housing is further provided with a water inlet and a water outlet. The stirring assembly is arranged in the lifting inner cavity and guides a liquid in the water inlet portion to flow to the water outlet portion, and the driving assembly drives the stirring assembly to rotate in the lifting inner cavity. The device integrates and modularizes components and driving members used as water pumping power, to facilitate disassembly and cleaning.
Owner:SHENZHEN BEIBANQIU NETWORK TECHNOLOGY CO LT

Water pollution on-line monitoring device with self-cleaning function

The invention discloses an online water pollution monitoring device with a self-cleaning function, and belongs to the technical field of water environment monitoring equipment, the online water pollution monitoring device comprises a floating platform, a plurality of floating bodies are connected to the peripheral side of the bottom of the floating platform in a surrounding manner, an equipment box is mounted at the bottom of the floating platform, a protective mesh enclosure is connected to the bottom of the equipment box, and a water suction pump is mounted in the equipment box. According to the device, water bodies with corresponding depths are extracted through liquid inlet nozzles with different depths, the water bodies are fed into a detection box, the water body environment is monitored through a detection probe, after the probe is used, distilled water obtained through condensation of a condensation box can be extracted through a water suction pump, and after the distilled water is fed into an inner flushing mechanism, liquid spraying flushing can be conducted on the multiple detection probes; algae in water are prevented from adhering to the surface of the probe through flushing of distilled water, the detection precision is improved, meanwhile, the scraping and sweeping mechanism moves to scrape the algae adhering to the outer side of the protective net cover, and water pumping is prevented from being affected.
Owner:NINGXIA UNIVERSITY

Compressed air pumping energy storage system

InactiveCN119103082ASolve the problem of difficult site selectionflexibleCombination enginesPump controlWater storage tankWater turbine
The invention provides a compressed air water pumping and energy storage system which comprises an air compression set, a first heat exchanger, a second heat exchanger, an energy storage device, a third heat exchanger, a fourth heat exchanger, a turbine unit, a water pump unit, a normal-pressure water storage tank, a water wheel set, a water-gas co-containing cabin and a high-pressure air storage tank. A first throttling valve is arranged between the high-pressure gas storage tank and the water-gas co-containing cabin, and the water pump set, the normal-pressure water storage tank, the water wheel set, the water-gas co-containing cabin and the high-pressure gas storage tank are sequentially connected to form a first energy storage stage. The compressed air water pumping energy storage system is adopted, the characteristics of compressed air energy storage are combined, air is compressed and stored in a high-pressure air storage tank in the energy storage process, in the energy release process, high-pressure air is released, water in a water storage tank is compressed to be in a high-pressure state, and high-pressure water pushes a water turbine to do work for power generation.
Owner:MICRO NEWTON (SHANDONG) TECH DEV CO LTD

Underground water pollution hydraulic control simulation-optimization method for in-situ leaching uranium mining final mining area

ActiveCN119538713APrecise Dynamic ChangesDescribe dynamic changes accuratelyFluid removalChemical processes analysis/designStream flowGroundwater pollution
The invention discloses a hydraulic control simulation-optimization method for underground water pollution in an in-situ leaching uranium mining final mining area. The method comprises the following steps: constructing a three-dimensional unstable underground water flow and pollution component reaction migration simulation model of an ore-bearing water layer by utilizing MODFLOW and PHT3D simulation software; determining a management objective function and constraint conditions of hydraulic control of the underground water pollution range of the in-situ leaching uranium mining final mining area, and establishing an objective function of a hydraulic control optimization management model; the underground water level and the pollutant concentration of each grid are used as state variables, the water pumping flow of each well is used as a decision variable, and the state variables are continuously updated through an ore-bearing water layer three-dimensional unstable underground water flow and pollution component reaction migration simulation model. And selecting an optimal solution of the objective function of the hydraulic control optimization management model by using a particle swarm optimization algorithm. According to the method, the hydraulic control condition of the pollution plume of the ore-bearing and water-bearing stratum in the final mining area can be predicted, potential problems can be found in advance, and corresponding measures are taken for adjustment.
Owner:XINJIANG TIANSHAN URANIUM IND CO LTD CNNC +1

Simulation-optimization method of polluted site underground water pumping-injection-treatment pollution remediation system

The invention discloses a simulation-optimization method for a pollution site groundwater pumping-injection-treatment pollution remediation system based on a multiform evolution search normal form. The method comprises the following steps: constructing a groundwater flow model and a pollutant solute transport model; the method comprises the following steps: determining a management objective function and constraint conditions of hydraulic control of an underground water pollution range, establishing an underground water pollutant treatment model, optimizing underground water pumping and injection treatment of a pollution site by adopting BLMFO, solving the problem of interdependence between an upper-layer global target and a lower-layer local target through nested optimization, and constructing an auxiliary task by utilizing MFO; state variables are updated through the groundwater flow model and the pollutant solute transport model, a management objective function value of the groundwater pollutant treatment model is calculated, and whether constraint conditions are met or not is judged; meanwhile, decision variables are selected by optimizing the groundwater pollutant treatment model, and state variables are updated by returning to the groundwater flow model and the pollutant solute transport model.
Owner:浙江省环境科技股份有限公司

Simulation and prediction method for underground water pollution of karst area with multiple media

The invention belongs to the technical field of water pollution prevention and control, and particularly discloses a method for simulating and predicting underground water pollution of a karst area with multiple media. The method comprises the following steps: carrying out a water pumping experiment, geophysical exploration and a field tracing experiment, and determining the connectivity of a fault and a karst pipeline, the water flow velocity, the average water flow velocity of the pipeline, the connectivity of the pipeline and a branch structure; constructing a matrix three-dimensional unsteady-state groundwater flow equation, and determining the area and duration of a pollution source, a characteristic pollution factor and a leakage concentration; hydrogeological parameter calibration is carried out based on the groundwater unified measurement water level; taking the weighted variance of the monitored water level, the spring flow and the spring solute concentration as a calibration objective function; the fixed supply coefficient is converted into supply intensity, and the long observation hole water level fluctuation condition, spring flow and the concentration of pollution factors in spring water are predicted on the basis of unsteady flow simulation. The karst spring and water quality evolution can be accurately predicted, and a decision basis can be provided for protection and restoration of underground water resources in the karst area.
Owner:KUNMING PROSPECTING DESIGN INSTITUTE OF CHINA NONFERROUS METALS INDUSTRY CO LTD +1

Water quality monitoring device for environmental engineering

The invention discloses a water quality monitoring device for environmental engineering, which comprises a monitoring box, a U-shaped frame, a power-driven roller, a rope, a fixed cylinder, a filter barrel, a water pumping hose and the like, the U-shaped frame is arranged at the bottom of the inner wall of the monitoring box, the roller is driven by a power mechanism, the bottom end of the rope is connected with the filter barrel, and the bottom end of the filter barrel is connected with the water pumping hose. The auxiliary mechanism controls the roller through a locking rod and a ratchet wheel, so that stable sedimentation of the filter barrel is ensured; the monitoring mechanism monitors water quality parameters by using a piston barrel and a detection probe; the cleaning mechanism automatically clears impurities on the surface of the filter vat to keep monitoring efficiency; the water quality monitoring device is ingenious in design, high in automation degree and easy and convenient to operate, the water quality monitoring efficiency and accuracy are effectively improved, the maintenance cost is reduced, and the water quality monitoring device is suitable for water quality monitoring of various water environments such as rivers, lakes and seas.
Owner:内蒙古自治区环境监测总站呼和浩特分站

Intelligent water pump group scheduling system and method based on irrigation demand response

The invention discloses an intelligent water pump group scheduling system and method based on irrigation demand response, and aims to solve the problems of complex scheduling, heavy communication burden and uneven upstream and downstream water supply of a small watershed distributed pump station group. The method comprises the following steps: acquiring crop water demand, weather and soil data, and calculating irrigation demand; establishing a water pump operation and photovoltaic power generation output model; then, on the premise that the photovoltaic power generation utilization rate is maximum, water pump irrigation power is preliminarily distributed, and surplus or vacant electric power is treated; and finally, monitoring water volume, water level and photovoltaic power generation data in real time, and dynamically adjusting the pumping power of the water pump. Through intelligent decision making and dynamic adjustment, the irrigation requirement is met, the problem that downstream water supply is insufficient due to upstream excessive water pumping is effectively avoided, meanwhile, power use is optimized, the external power introduction cost is reduced, and dual optimization of irrigation and power use is achieved.
Owner:NANJING HYDRAULIC RES INST

Water-cooled radiator with built-in pump spraying waterway structure

The present invention discloses a water-cooled radiator with built-in pump spraying waterway structure. A slot formed in the body bottom shell is separated into a water storage tank and a heat sink; a water inlet is formed in the heat sink, a water outlet is formed in the water storage tank, a through hole is formed in the water-stop plate, the radiating fin fixedly covers an opening of the heat sink; one end of the water inlet pipe is communicated with a water outlet end of the water-cooled box while the other end thereof is communicated with the water inlet, one end of the water outlet pipe is communicated with the water outlet while the other end thereof is communicated with a water inlet end of the water-cooled box, and the water pumping mechanism is arranged in the water storage tank. The present invention improves the water cooling efficiency.
Owner:DONGGUAN BINGDIAN INTELLIGENT SCI & TECH CO LTD

Method for safely and rapidly evaluating and treating water diversion of overlying strata under mining of working face

The invention provides a safe and rapid evaluation treatment method for overlying strata water diversion under working face mining, in the treatment method, before working face stoping, a waterproof curtain is constructed along the boundary of a surface subsidence range, the waterproof curtain extends into a bottom water-resisting layer from the surface, so that the waterproof curtain is constructed along the vertical projection direction; and the bottom aquifer in the surface subsidence range is completely sealed by the waterproof curtain, so that water inside and outside the waterproof curtain does not interfere with each other, and the water volume influencing the stoping of the working face is reduced. A plurality of water level and crack monitoring assemblies are arranged at the same time, in the stoping process of the working face 1, the water level condition in a waterproof curtain and the crack condition generated by sinking of a bottom waterproof layer are monitored in real time through the water level and crack monitoring assemblies, and corresponding treatment measures are taken according to the corresponding conditions; the waterproof curtain, the grouting operation and the water pumping operation cooperate with one another, the effect that no water is stored in the waterproof curtain is achieved, meanwhile, the construction cost can be greatly reduced, the construction efficiency is improved, and the ecological environment is protected.
Owner:HUAINAN MINING IND GRP +2

Multi-channel high-precision water level dynamic real-time monitoring system for drilling water pumping test

The invention discloses a multi-channel high-precision water level dynamic real-time monitoring system for a drilling water pumping test, and the system comprises a sensing layer which is used for deploying a multi-source sensor array, inhibiting interference through distributed layout and electromagnetic shielding, collecting multi-dimensional data in real time, and carrying out the preliminary filtering; according to the transmission layer, an optical fiber and twisted pair redundant network is constructed, an EtherCAT protocol is adopted for low-delay transmission, AES-128 encryption tampering prevention is integrated, and edge nodes compress data and verify integrity; the processing layer is used for carrying out real-time preprocessing on edge calculation and switching a standby sensor in abnormal detection; the cloud end predicts the water level trend through Spark Streaming analysis and an LSTM model, distinguishes interference through a random forest algorithm, and outputs calibration data and an analysis report; the application layer is used for constructing a three-dimensional drilling model based on Unity, dynamically displaying water level changes, synchronizing a multi-parameter curve and supporting historical backtracking; the early warning module notifies abnormity through sound and light and short messages, the decision module generates a report and supports multi-drill-hole comparison, and the test strategy is optimized.
Owner:YUNNAN PROVINCIAL NONFERROUS GEOLOGY BUREAU GEOLOGY GEOPHYSICAL & CHEM EXPLORATION INST (YUNNAN PROVINCIAL NONFERROUS GEOLOGY BUREAU TESTING CENT)

Cleaning device for precision machine manufacturing and machining

The utility model discloses a cleaning device for precision machinery manufacturing, relates to the technical field of machining equipment, and comprises an inverted U-shaped frame, a moving mechanism, a drilling and milling mechanism, a cleaning mechanism and a clamping mechanism, two side surfaces of the inverted U-shaped frame are provided with through pipe holes, and the inverted U-shaped frame is connected with the moving mechanism. In the drilling and milling machining process, the water pump is started, the water pump pumps water at the bottom of the water tank into the spray head through the water pumping pipe and the hose, chippings generated by drilling and milling of the drilling and milling head are flushed down through water flow by means of water spraying of the spray head, the chippings are led into the efficient filter screen in the water tank through the water leakage holes along with the water flow, and the chippings in the water are filtered out through the efficient filter screen; and water is filtered and purified, and water falling into the bottom of the water tank is pumped out by the water pump for recycling, so that chippings are convenient to clean, workpieces made of different materials are convenient to machine and use, water flow can be recycled, and waste of water resources is avoided.
Owner:XIANGCHENG RUICHUANG IND & TRADE CO LTD

Pumped storage coupled compressed air energy storage scheduling method

The invention relates to a pumped storage and compressed air energy storage coupled scheduling method, which comprises the following steps of: establishing a multi-stage data system based on input data of multiple time scales; constructing a multi-time scale scheduling model; when the load of the pumped storage mixed compressed air energy storage power station is lower than a first preset threshold value, electricity is abandoned preferentially, water pumping and compression are conducted, and when the load is larger than a second preset threshold value, the pumped storage mixed compressed air energy storage power station is controlled to conduct combined energy release. The nonlinear relation between the pumped storage efficiency and the water level and the nonlinear relation between the compressed air energy storage power and the pressure are converted into linear constraints, solving is conducted by dividing the water level interval and the pressure level, and a scheduling strategy is obtained. Therefore, the problems of relatively low energy storage efficiency, insufficient scheduling refinement, relatively high system standby cost and the like caused by the problems that pumped storage water scheduling and CAES energy management are separated, a standby capacity coordination mechanism is lacked and the like in a hybrid system scheduling method in related technologies are solved.
Owner:TSINGHUA UNIVERSITY

Separating type ultra-deep geothermal water extraction and utilization device

The invention belongs to the technical field of geothermal energy development and utilization, and particularly relates to a separated ultra-deep geothermal water extraction and utilization device which comprises a base, an adjustable supporting mechanism is arranged on the base, a winch is arranged on the adjustable supporting mechanism, a sliding rod piece is arranged in a closed mine, and the winch is used for conveying the sliding rod piece to the bottom of the closed mine. A clamping mechanism used for fixing the sliding rod piece is arranged on one side of the base. The sliding rod piece is vertically arranged, a plurality of supporting plate assemblies are connected to the sliding rod piece in a sliding mode, the other ends of the supporting plate assemblies are fixedly connected to a rope on the winch, a water pumping device is arranged on the lowest supporting plate assembly, transfer water pumping devices are arranged on the rest supporting plate assemblies, and the water pumping device is communicated with the transfer water pumping devices. The device is high in reliability, can be repeatedly used, is low in cost input, and can solve the problem that hot water is difficult to extract when a mine is closed in an ultra-deep manner.
Owner:CHINA UNIV OF MINING & TECH

Short-term multi-objective optimization scheduling method for hybrid pumped storage power station

The invention discloses a short-term multi-objective optimal scheduling method for a hybrid pumped storage power station, which belongs to the technical field of optimal scheduling of a power system and comprises the following steps of: acquiring initial input data; taking minimization of residual load mean square deviation as a peak regulation target, and taking minimization of lower reservoir tail water level daily variable amplitude and minimization of lower reservoir dam water level daily variable amplitude as navigation targets to construct a multi-target optimization scheduling model; performing mutual exclusion processing on reversible unit power generation and water pumping flow constraints to generate an initial solution, correcting the initial solution, solving the multi-target optimization scheduling model to obtain a Pareto solution set, dividing a Pareto leading edge distribution space, and selecting a feasible scheduling scheme with the maximum peak valley difference reduction rate as an optimal scheduling scheme; and selecting a final scheduling scheme from all the subspaces. The problems that in the prior art, peak regulation operation and navigation demand dynamic matching is insufficient, and a multi-source constraint coupling processing mechanism is lacked are solved.
Owner:HUADIAN ELECTRIC POWER SCI INST CO LTD

Water-filled cooling permanent magnet submersible electric pump

The invention discloses a water-filling cooling permanent magnet submersible electric pump, and belongs to the technical field of submersible electric pumps. A water-filling cooling permanent magnet submersible electric pump comprises a motor and a water suction pump fixedly installed on the bottom face of the motor. According to the water-filling cooling permanent magnet submersible electric pump, water rapidly flowing in the spiral water pumping pipe can impact fan blades, the water pumping device works to pump part of water from the interior of the spiral water pumping pipe, water flows through the connecting pipe, the connecting block and the spiral cooling pipe to take away heat generated when the motor works, and the motor is cooled; compared with a traditional mode that cooling liquid is added into a cooling cavity of a motor for cooling, the permanent magnet submersible electric pump achieves self-water-filling cooling, the motor is cooled through continuously flowing water, the heat dissipation effect of the motor is improved, sealing ring damage caused by high temperature is prevented, water is further prevented from entering the motor from a leakage position, and the service life of the motor is prolonged. Long-time work of the motor is guaranteed, and the water pumping efficiency of the permanent magnet submersible electric pump is improved.
Owner:LUOHE SITONG PUMP CO LTD

Underground water pumping and injection integrated intelligent management and control method and system based on Internet of Things

The invention discloses an integrated intelligent management and control method and system for underground water pumping and injection based on the Internet of Things, and the method comprises the steps: carrying out the geological investigation of a target region, constructing a three-dimensional geological model, and planning the layout of a pumping and injection well group and a sensor network according to the three-dimensional geological model; deploying a monitoring network and collecting data based on the layout scheme, and fusing a three-dimensional geologic model to construct a polluted site digital twinborn body; groundwater situation data are extracted through the digital twinborn body, a pollutant migration path and a water level dynamic state are predicted by using an LSTM model, and pollution scene simulation information corrected by geologic features is output; by taking the simulation information as input and coupling geological parameters as constraints, generating a pumping and injection well group cooperative control strategy set by adopting a BLMFO double-layer multi-objective optimization algorithm; and finally, a control instruction is executed, the real-time situation is monitored in the repairing process, strategy change suggestions including the flow adjustment amplitude, the agent optimization scheme and equipment operation parameter correction are judged and pushed, the repairing efficiency is improved, and the method adapts to the complex geological environment.
Owner:TECH CENT FOR SOIL AGRI & RURAL ECOLOGY & ENVIRONMENT MINIST OF ECOLOGY & ENVIRONMENT

Dry-type transformer

The invention relates to the technical field of dry type transformers, in particular to a dry type transformer which comprises a transformer body, the transformer body comprises a high-voltage coil and a low-voltage coil, the high-voltage coil is connected to the outer side of the low-voltage coil in a sleeving mode, a gap is reserved between the high-voltage coil and the low-voltage coil, and a plurality of vertically-through air channels are formed in the high-voltage coil and the low-voltage coil. Air guide pieces are arranged on the upper sides and the lower sides of the high-voltage coil and the low-voltage coil, and air ports of the air guide pieces are matched with air channel openings of the high-voltage coil and the low-voltage coil and gaps between the high-voltage coil and the low-voltage coil. According to the dry-type transformer, air circulation heat dissipation and water circulation cooling are combined through the integrated air channel, the heat dissipation calandria, the circulating fan and the water pumping device, the heat dissipation efficiency of the dry-type transformer is improved, the dry-type transformer can keep good heat dissipation performance in a closed or limited space, meanwhile, through the designed transmission mechanism, the heat dissipation efficiency of the dry-type transformer is improved, and the heat dissipation efficiency of the dry-type transformer is improved. Vibration energy generated when the transformer body works is converted into driving force of the water pumping device, and recycling of the vibration energy is achieved.
Owner:JINSHANMEN TECH

Water quality detection device for agricultural water

ActiveCN119124746ARealize simultaneous acquisitionKnow about water qualityBatteries circuit arrangementsWithdrawing sample devicesWater useMicrocontroller
The invention discloses a water quality detection device for agricultural water, and relates to the technical field of agricultural water and soil engineering, the technical key point is that the device comprises a water quality detection assembly, a water pumping assembly and an energy supply assembly, and water samples at different depths can be collected through an electronic water pump for multilayer water quality analysis. The device is provided with a multi-parameter water quality detector, water quality parameters such as pH value, TDS value, heavy metal concentration and the like can be detected, and automatic water quality monitoring is achieved. The device is based on a single-chip microcomputer control system, water sample collection, detection, data processing and display are automatically completed, and the operation process is simplified. The device is powered by solar energy, has self-energy-supply capability and is suitable for outdoor use. The unique structural design of the device has the protection function of the protective cylinder, the conical top cover and the absorbent cotton, can effectively prevent the influence of external environments such as rainwater and dust on equipment, prolongs the service life of the equipment, and is very suitable for detecting the farmland irrigation water quality, monitoring the water quality of water sources such as lakes and rivers and ensuring the safety of irrigation water.
Owner:INNER MONGOLIA AGRICULTURAL UNIVERSITY

Tunnel grouting hole arrangement analysis method for spatial crack correlation analysis

The invention belongs to the technical field of tunnel crack grouting and hole arrangement, and discloses a tunnel grouting and hole arrangement analysis method for spatial crack correlation analysis, which comprises the following steps: scanning the distribution position and geometric contour of surrounding rock cracks of a tunnel face to construct a crack communication network, and identifying an actual water guide path in combination with a water pumping test; the grouting openings are formed in the key nodes, accurate matching of the grouting holes and the seepage channels is achieved, scientificity and pertinence of hole distribution can be improved by fusing fracture space distribution and hydraulic connectivity, the plugging capacity of grout to water guiding fractures is remarkably improved, the grouting efficiency and the water stopping effect are improved, and the construction period is shortened. Meanwhile, neck feature recognition and section division are further performed on each crack in the crack communication network on the basis of arranging the grouting holes based on the hydraulic communication path, so that supplementary arrangement of the grouting ports is implemented by combining the relative relationship between the spatial position of the section and the existing grouting holes; and refined and dynamic optimized layout of the grouting ports is realized.
Owner:NANJING KANGTAI CONSTR GROUTING TECH CO LTD +1

Building construction dust falling device

The utility model discloses a building construction dust fall device which comprises an electric flat car body, a water storage tank is fixedly installed on the top of the electric flat car body, and a water pumping pipe is fixedly installed on the top of the water storage tank in a penetrating and penetrating mode. According to the building construction dust falling device, the electric flat car body, the water storage tank, a backflow hole, an annular collecting box, a water pumping pipe, a water adding pipe, a connecting pipe, a dust falling pipe, an atomizing nozzle, an electric telescopic rod, a filter screen, a water pump, a fixing plate, a mounting block, a movable pipe, a guide pipe and a storage battery are used in cooperation, and a water source in the water storage tank is pumped out; water is conveyed into a dust falling pipe through a movable pipe and is finally atomized and sprayed out through an atomizing spray head, dust falling operation is conducted on the periphery of the device, most of the water and dust fall into an annular collecting box together, a filter screen in the annular collecting box can filter the recycled water, and the dust is intercepted on the upper surface of the filter screen.
Owner:郜东旭

Accumulated water removing environment-friendly device for house building construction

The utility model discloses a building construction accumulated water removing environmental protection device, which relates to the technical field of building construction, and comprises a water pumping pipe, one end of the water pumping pipe is fixedly connected with a spiral thread, the surface of the spiral thread is in threaded connection with an isolation ball, and the surface of the isolation ball is fixedly connected with a filter screen. A water suction pump is fixedly connected to one end of the water suction pipe, a damping structure is fixedly connected to the bottom of the water suction pump, and a water storage barrel is fixedly connected to one side of the top of the damping structure; through the arrangement of the spiral thread, the isolation ball and the filter screen, soil can be prevented from being sucked into the water suction pump during use, so that the water suction pipe is prevented from being blocked by the soil, the accumulated water removing efficiency is improved, and the practicability of the device is greatly enhanced; through the arrangement of the water conveying pipe, the atomizer and the water spraying opening, dust falling treatment can be conducted on a construction site during use, so that dust is prevented from floating in air and being sucked into a respiratory tract, pollution to the environment is relieved, and the use effect of the device is improved.
Owner:中建五局第三建设有限公司

Lightning arrester electrical performance test tool

The utility model discloses a lightning arrester electrical performance test tool, which relates to the field of lightning arresters and comprises a device body, a transmission plate is slidably connected in the device body, a cover plate is connected to the outer surface of the transmission plate, a power connection port is installed in the cover plate, a lightning arrester body is slidably connected in the cover plate, and the lightning arrester body is connected with the power connection port. A limiting hole is formed in the device body, a supporting base is installed in the device body, a water outlet pipe is communicated with the interior of the device body, a water tank is connected to the outer surface of the device body, a water pumping pipe is communicated with the interior of the water tank, and a water spraying plate is installed in the device body. Through cooperation of the cover plate, the water spraying plate and other parts, the cover plate can move, so that the power connection port is in contact with the upper ends of the lightning arrester bodies at different heights, the water spraying plate can spray water, spraying simulation is performed on the lightning arrester bodies, and the problem that deviation exists between a rainy day and a real detection result is solved.
Owner:HIGH ELECTRIC TECH CO LTD

High-pressure wellhead two-stage tandem connection self-energy-charging water pumping desander and working method

ActiveCN119531827AImplement automatic exclusionachieve dischargeFluid removalSteam engine plantsConvertersDesander
The invention discloses a high-pressure well mouth two-stage tandem connection self-energy-charging water pumping desander and a working method. A first-stage water pumping pipe is arranged in an inner side cavity of a first-stage separator, a second-stage water pumping pipe is arranged at the bottom of an inner side cavity of a second-stage separator, an energy storage electric device is arranged in the second-stage separator, a self-energy-charging element is arranged in the second-stage separator, and the self-energy-charging element is arranged in the second-stage separator. A water suction pump body is arranged at the end part of the first-stage water suction pipe or the second-stage water suction pipe; the energy storage electric device comprises a motor and an energy storage device, and an energy converter is arranged in the self-charging element; and a cleaning triggering mechanism is arranged in the first-stage water pumping pipe. By arranging the internal water pumping mechanism, internal accumulated water is automatically discharged, the adopted drainage pipe does not need to be communicated with the outside of the sand remover, continuous work of the sand remover is guaranteed, energy is generated by means of gas power of natural gas, water is pumped, and the accumulated water is pumped and discharged.
Owner:PETROCHINA CO LTD

Water pumping station remote control system adaptive to water supply network

The invention discloses a water pumping station remote control system adaptive to a water supply network, relates to the technical field of water pumping station control, and solves the technical problem that in the prior art, a water pumping station operation decision cannot be made when remote control is abnormal, and the supply efficiency is reduced. Specifically, a remote control influence analysis unit performs control influence analysis on remote detection of a water supply network, acquires control aging data and control interference data, and deduces whether the remote control influence analysis is normal or not according to data analysis; the signal abnormity control decision-making unit performs control signal abnormity decision-making on the water supply network, acquires decision-making duration information and decision-making frequency information, and deduces whether the supply decision of the current water pump station is adaptive or not according to information comparison.
Owner:ANHUI KEXING INFORMATION IND CO LTD

Sampling equipment for water environment treatment

The invention relates to the field of water body sampling, in particular to sampling equipment for water environment governance, which comprises a sampling mechanism, a force storage mechanism is movably connected in the sampling mechanism, a floating mechanism is arranged on the outer wall of the sampling mechanism, and a trigger mechanism and a positioning mechanism are arranged at the top of the sampling mechanism; the sampling mechanism comprises a sampling box, the force storage mechanism comprises a piston arranged in the sampling box in a sliding mode, and the top of the piston is fixedly connected with a sliding rod. The device can achieve rapid sampling at the specified depth, the sampling efficiency is improved, meanwhile, a water body in the central area of river water on a bridge can be sampled, a running water sample can be obtained, and the sampling efficiency is improved. According to the device, water is directly sampled from water below the water surface, floating objects on the water surface are prevented from being brought into the device, the device has the same sampling depth every time, a good water sample can be obtained, the water taking speed of the device can be rapidly increased through the arrangement of the force storage mechanism, a water pumping mode is directly adopted for sampling, and the sampling efficiency is higher compared with water inflow sampling.
Owner:江苏佳顺环境科技有限公司

Shock absorption water outlet cavity channel of booster pump

The utility model discloses a booster pump damping water outlet channel, which comprises a water inlet pipe, a water inlet cavity, a water outlet cavity and a water outlet pipe, a first one-way valve is arranged between the water inlet pipe and the water inlet cavity, a water pumping driving device is arranged in the water inlet cavity, and a second one-way valve is arranged between the water inlet cavity and the water outlet cavity; the water outlet cavity comprises a main cavity channel and a secondary cavity channel, the second one-way valve is arranged at the bottom of the main cavity channel, a separation cover protruding towards the secondary cavity channel is arranged between the main cavity channel and the secondary cavity channel, a plurality of water passing gaps communicated with the main cavity channel and the secondary cavity channel are formed in the side wall of the separation cover, and the water passing gaps directly face or obliquely face the side wall of the main cavity channel. And the secondary cavity channel is communicated with the water outlet pipe. The utility model has the advantages of low vibration and noise.
Owner:ZHONGSHAN HANDEWAY ELECTRICAL TECHNOLOGY CO LTD

Enhancement and release platform

The invention discloses an enhancement releasing platform which comprises a releasing pool arranged on the ground, the rear end of the releasing pool is a placing area, the front end of the releasing pool is a releasing area, a water outlet is formed in the front end of the releasing pool, a gate is arranged at the water outlet, the water outlet is communicated with a releasing groove, and the end, away from the releasing pool, of the releasing groove extends to the bottom of the releasing area. A water pumping assembly is arranged on the rear side of the releasing pool and communicated with a water inlet pipe, the end, away from the water pumping assembly, of the water inlet pipe extends to the releasing point, the water pumping assembly is communicated with a water outlet pipe, and the end, away from the water pumping assembly, of the water outlet pipe is communicated with the releasing pool. When the device is used, the biological individuals are firstly transferred into the releasing pool, the water level of the releasing pool is high, the height difference during transferring is small, the biological individuals are not prone to being injured, the biological individuals are released into a water body through the releasing groove after the gate is opened, in the releasing process, the releasing groove cannot be damaged due to water impact, friction and collision are reduced, and the survival rate is increased.
Owner:云南省渔业科学研究院